Telah Terbit: Aug 8, 2024 10:13

The project invested and constructed by Ningbo Top Group Co., Ltd. (abbreviation: Top Group) has achieved initial success. In the first half of this year, the interior sound insulation system module products have been put into production. Meanwhile, the equipment debugging work of the lightweight chassis system module workshop has been completed and it is about to enter the trial production stage.

The entire project covers an area of approximately 180 acres, aiming to build an intelligent factory complex integrating R&D, trial production, and smart manufacturing. The designed annual production capacity includes 1 million sets of lightweight chassis (aluminum subframes) and 500,000 sets of vehicle acoustic packages. This project aims to provide high-quality localized supporting services for Thalys Automobile and other automakers in the southwest region, contributing to the realization of new economic growth in the automotive industry.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
7 jam yang lalu
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
Baca Selengkapnya
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
7 jam yang lalu
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
7 jam yang lalu
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Baca Selengkapnya
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Xinjiang Boyuan Aluminum Co., Ltd. sedang mengupayakan penuh percepatan pembangunan proyek produk aluminium setengah jadi tipe baru dengan kapasitas tahunan 150.000 ton. Berlokasi di Taman Industri Hilir Aluminium Huoshaoshan, Zona Pengembangan Ekonomi dan Teknologi Zhundong Xinjiang, proyek ini memiliki total investasi 180 juta yuan dan mencakup area seluas 64 mu. Direncanakan akan dibangun dua bengkel produksi terstandar dengan total luas lantai 23.000 m². Dari segi konfigurasi lini produksi, proyek ini akan dilengkapi dengan dua lini produksi batang aluminium, delapan lini produksi gulungan dan strip aluminium cor-giling, serta satu lini produksi gulungan dan strip aluminium canai dingin. Setelah sepenuhnya selesai dan beroperasi, proyek ini diharapkan mencapai kapasitas produksi tahunan sebesar 60.000 ton kawat aluminium dan 90.000 ton gulungan aluminium.
7 jam yang lalu
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
8 jam yang lalu
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
Baca Selengkapnya
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
[Komentar Harian Harga ADC12: Futures Aluminium Konsolidasi di Level Tinggi, Spot ADC12 Konsolidasi Menguat] Kontrak aluminium paduan 2611 dibuka pada 23.430 yuan/mt hari ini, turun ke level terendah intraday 23.320 yuan/mt di mana ia menemukan dukungan sebelum berangsur pulih, berfluktuasi dalam kisaran 23.320-23.560 yuan/mt sepanjang hari, dan ditutup pada 23.435 yuan/mt, naik 0,11%.
8 jam yang lalu