Telah Terbit: Jul 11, 2024 21:24

Since the start of operation of the phase I plant of the Kamoa-Kakula mega copper mine project in the Democratic Republic of the Congo (DRC) under Ivanhoe Mines on May 25, 2021, the cumulative copper production has exceeded the 1 million ton mark. By June 30, 2024, the project had accumulated 1.02 million tons of copper in concentrate.

Since Ivanhoe Mines first entered the DRC in 1996, it has embarked on a 28-year Odyssey journey, enduring hardships and moving forward with perseverance. Kamoa-Kakula has emerged from its cocoon and is dancing in Katanga.

With the early commissioning of the Kamoa-Kakula phase III plant within budget, the comprehensive ore processing capacity of the three lines has been increased to 14.2 million tons per year. It is expected that after the phase III plant reaches full production, the annual copper production will exceed 600,000 tons, making it the largest copper mine in Africa and the third largest copper mine in the world.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
7 jam yang lalu
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
Baca Selengkapnya
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Metals mengumumkan pada 1 September bahwa tambang Gediktepe di Türkiye memproduksi konsentrat tembaga pertamanya pada 31 Agustus, menandai dimulainya fase peningkatan produksi. Perusahaan akan meningkatkan throughput secara bertahap dan mengoptimalkan kinerja pabrik, dengan target produksi penuh pada akhir 2026. Target produksi tahunan kondisi tunak Gediktepe adalah 20.000–25.000 ton setara tembaga. Pengumuman lengkap tersebut juga mengonfirmasi bahwa tambang itu memproduksi konsentrat seng pertamanya pada Agustus 2026, meskipun tanggal spesifik dan volumenya tidak diungkapkan. SMM memperkirakan produksi seng dalam konsentrat tambang tersebut sekitar 10.000–15.000 ton seng terkandung pada 2026.
7 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
7 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
Baca Selengkapnya
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
7 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
9 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Baca Selengkapnya
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Epiroc telah mendapatkan pesanan sekitar SEK610 juta (US$64 juta) dari MMG Limited dan kontraktor pertambangannya, China Huaye dan 23MCC, untuk peralatan tambang bawah tanah guna mendukung perluasan Tambang Tembaga Khoemacau di Botswana. Pesanan ini mencakup rig pengeboran permuka, rig pengeboran produksi, rig pemasangan baut kabel, loader, dan truk tambang bawah tanah, beserta sistem kendali jarak jauh, suku cadang, pelatihan, dan dukungan teknis di lokasi. Peralatan tersebut akan mendukung perluasan Khoemacau yang sedang berlangsung oleh MMG, yang dirancang untuk meningkatkan kapasitas produksi tahunan dari sekitar 60.000 ton menjadi 130.000 ton logam tembaga dalam konsentrat. Proyek ini mencakup pembangunan pabrik pengolahan baru berkapasitas 4,5 Mt/tahun, yang akan meningkatkan total kapasitas penggilingan menjadi lebih dari 8 Mt/tahun, bersamaan dengan pengembangan Zone 5 North, Mango, dan Zeta North-East. Konsentrat tembaga pertama dari perluasan ini diharapkan pada H1 2028. Epiroc menyatakan pengiriman armada bawah tanah baru akan dimulai pada Q4 2026 dan diperkirakan selesai pada Q2 2028, secara garis besar sejalan dengan jadwal perluasan. Armada yang dipesan mencakup rig pengeboran permuka Boomer, rig pengeboran produksi Simba, rig pemasangan baut kabel Cabletec, loader Scooptram, dan truk bawah tanah Minetruck, dengan beberapa unit dilengkapi untuk operasi otomatisasi dan kendali jarak jauh. Pesanan peralatan ini merupakan tonggak eksekusi lain untuk perluasan Khoemacau yang telah disetujui, bukan target produksi baru. Dengan pengadaan yang terus berjalan dan pengiriman peralatan dijadwalkan hingga Q2 2028, proyek ini terus maju menuju rencana peningkatan kapasitas tembaga dalam konsentrat MMG menjadi 130.000 ton per tahun. Perluasan ini merupakan peningkatan signifikan yang direncanakan pada kapasitas produksi tembaga Khoemacau di Sabuk Tembaga Kalahari, Botswana.
9 jam yang lalu
Since the start of operation of the phase I plant of the Kamoa-Kakula - Shanghai Metals Market (SMM)