SMM Zinc Market Morning Comment (Jul 10)

Telah Terbit: Jul 10, 2024 09:40
Sumber: SMM
Overnight, LME zinc opened at $2,959/mt, reaching a high of $2,964.5/mt before hitting a low of $2,921/mt, and closed at $2,940/mt, down $5/mt, a decrease of 0.17%.

Overnight, LME zinc opened at $2,959/mt, reaching a high of $2,964.5/mt before hitting a low of $2,921/mt, and closed at $2,940/mt, down $5/mt, a decrease of 0.17%. Trading volume increased to 7,886 lots, and open interest rose by 5,092 lots to 239,000 lots. Overnight, LME zinc recorded a bearish candlestick, with the 5-day moving average forming resistance. LME zinc inventory was reduced by 2,300 mt to 256,375 mt, a decrease of 0.89%. The US dollar index rebounded from a low level, putting pressure on LME zinc prices, which continued to decline. Attention should be paid to the upcoming US inflation data release.

Overnight, the most-traded SHFE 2408 zinc contract opened at 24,325 yuan/mt, reaching a high of 24,350 yuan/mt before hitting a low of 24,215 yuan/mt, and closed at 24,280 yuan/mt, down 130 yuan/mt, a decrease of 0.53%. Trading volume was reduced to 63,451 lots, and open interest decreased by 2,104 lots to 77,078 lots. Overnight, SHFE zinc recorded a bearish candlestick, with the middle Bollinger Bands providing support. Affected by overseas futures and weak domestic downstream zinc demand, SHFE zinc lacked upward momentum and continued to fall.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
1 jam yang lalu
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
Baca Selengkapnya
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
Pada 2 September, Shanghai Futures Exchange (SHFE) mengumumkan telah menyetujui Shanghai Yuqiang Supply Chain Management Co., Ltd. untuk menyesuaikan kapasitas gudang yang ditunjuk untuk kontrak berjangka tembaga, aluminium, dan seng. Di lokasi penyimpanan di No. 3501 Gonghe New Road, Shanghai, perusahaan akan mencabut kualifikasi penyimpanan kontrak berjangka tembaga dan aluminium, sementara kapasitas gudang kontrak berjangka seng yang disetujui tetap tidak berubah pada 20.000 ton. Di lokasi di No. 2222 Jichuan Road, Distrik Minhang, Shanghai, kualifikasi penyimpanan kontrak berjangka seng akan dicabut, sementara kapasitas yang disetujui akan disesuaikan menjadi 45.000 ton tembaga dan 5.000 ton aluminium.
1 jam yang lalu
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
1 jam yang lalu
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
Baca Selengkapnya
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
Pada 2 September, Xingye Silver & Tin mengumumkan bahwa kecelakaan terjadi di anak perusahaan yang sepenuhnya dimilikinya, Yinman Mining, di West Ujimqin Banner, Mongolia Dalam, sekitar pukul 15.30 pada 26 Juli 2026, mengakibatkan satu korban jiwa dan tidak ada korban luka. Setelah kecelakaan tersebut, Yinman Mining melakukan inspeksi keselamatan menyeluruh dan menerapkan langkah-langkah perbaikan. Baru-baru ini, perusahaan menerima persetujuan dari Biro Manajemen Darurat West Ujimqin Banner untuk melanjutkan operasi pada sistem tailing pemrosesan bijihnya. Pabrik pemrosesan dijadwalkan untuk melanjutkan operasi pada 3 September 2026. Sementara itu, Yinman Mining melanjutkan pekerjaan perbaikan di area pertambangan dan bertujuan untuk melanjutkan operasi penambangan sesegera mungkin.
1 jam yang lalu
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
1 jam yang lalu
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
Baca Selengkapnya
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
Pada 2 September, Shengda Resources mengumumkan bahwa anak perusahaannya yang sepenuhnya dimiliki, Chifeng Jindu Mining Co., Ltd., telah menyelesaikan konsolidasi hak penambangan untuk Tambang Perak-Timbal-Seng Shidi dan hak eksplorasi untuk Tambang Polimetalik Timbal-Seng di Sekitar Shidi. Jindu Mining telah menerima Sertifikat Kepemilikan Properti (Hak Penambangan) dan Izin Penambangan yang diterbitkan oleh Biro Sumber Daya Alam Kota Chifeng. Setelah konsolidasi, area penambangan meningkat dari 4,4750 km persegi menjadi 5,2397 km persegi. Perubahan ini diperkirakan tidak akan berdampak material terhadap hasil operasional perusahaan dalam jangka pendek, tetapi diharapkan dapat meningkatkan sumber daya yang dapat ditambang, memperpanjang umur tambang, dan memberikan dukungan sumber daya untuk pengembangan jangka panjang perusahaan.
1 jam yang lalu