SMM Steel Mills Weekly Maintenance Statistics

Telah Terbit: Jun 25, 2024 15:35
Sumber: SMM
SMM estimates that 1.0221 million mt of pig iron output will be lost from blast furnace maintenance during Jun 22-28, down 31,900 mt on a weekly basis.

SMM estimates that 1.0221 million mt of pig iron output will be lost from blast furnace maintenance during Jun 22-28, down 31,900 mt on a weekly basis. SMM estimates that 899,900 mt of pig iron output will be lost from blast furnace maintenance during Jun 29-July 5, down 122,200 mt on a weekly basis.

Rebar: 1.0212 million mt of output will be lost from maintenance during Jun 22-28, down 116,700 mt on a weekly basis; 908,700 mt of output will be lost from maintenance during Jun 29-July 5, down 112,500 mt on a weekly basis.

HRC: 148,500 mt of output will be lost from maintenance during Jun 22-28, down 5,000 mt on a weekly basis; 73,500 mt of output will be lost from maintenance during Jun 29-July 5, down 75,000 mt on a weekly basis.

Medium-thickness plate: 0 mt of output will be lost from maintenance during Jun 22-28, flat on a weekly basis; 80,000 mt of output will be lost from maintenance during Jun 29-July 5, up 80,000 mt on a weekly basis.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)