SMM Steel Mills Weekly Maintenance Statistics

Telah Terbit: Jun 4, 2024 15:57
Sumber: SMM
SMM estimates that 1.0117 million mt of pig iron output will be lost from blast furnace maintenance during June 1-7, down 63,100 mt on a weekly basis.

SMM estimates that 1.0117 million mt of pig iron output will be lost from blast furnace maintenance during June 1-7, down 63,100 mt on a weekly basis. SMM estimates that 998,600 mt of pig iron output will be lost from blast furnace maintenance during June 8-14, down 12,100 mt on a weekly basis.

Rebar: 1.1504 million mt of output will be lost from maintenance during June 1-7, up 60,100 mt on a weekly basis; 1.1132 million mt of output will be lost from maintenance during June 8-14, down 37,200 mt on a weekly basis.

HRC: 172,200 mt of output will be lost from maintenance during June 1-7, up 67,200 mt on a weekly basis; 162,600 mt of output will be lost from maintenance during June 8-14, down 9,600 mt on a weekly basis.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn