SMM Steel Mills Weekly Maintenance Statistics

Telah Terbit: May 28, 2024 14:05
Sumber: SMM
SMM estimates that 1.0413 million mt of pig iron output will be lost from blast furnace maintenance during May 25-31, down 18,900 mt on a weekly basis.

SMM estimates that 1.0413 million mt of pig iron output will be lost from blast furnace maintenance during May 25-31, down 18,900 mt on a weekly basis. SMM estimates that 988,100 mt of pig iron output will be lost from blast furnace maintenance during Jun 1-7, down 53,200 mt on a weekly basis.

Rebar: 1.0822 million mt of output will be lost from maintenance during May 25-31, down 99,500 mt on a weekly basis; 1.0463 million mt of output will be lost from maintenance during Jun 1-7, down 35,900 mt on a weekly basis.

HRC: 0 mt of output will be lost from maintenance during May 25-31, down 54,600 mt WoW; 0 mt of output will be lost from maintenance during Jun 1-7, flat WoW.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)