California's Kern County has issued a Notice of Preparation (NOP) under the California Environmental Quality Act (CEQA) to advance Avantus' Buttonbush solar and energy storage project. The project includes a 2GW photovoltaic facility and a 2GW/8GWh battery storage system, which will be connected to the CAISO grid via PG&E's substation. Commercial operation is expected to begin in 2026 and 2028. Avantus has previously developed two solar+storage projects in Kern County, with a total storage capacity of 4GWh, which were sold to utility company AES last year.
![[SMM Tinjauan Mingguan Pasar Sel Baterai Penyimpanan Energi 9.3] Pasokan foil tembaga yang ketat membatasi jadwal produksi September, harga sel baterai penyimpanan energi tetap stabil](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![[Penyimpanan Energi: Chuneng menandatangani empat kesepakatan saat 20 perusahaan penyimpanan Tiongkok mengincar Amerika Selatan]](https://imgqn.smm.cn/usercenter/zWZVI20251217171730.jpg)

