SMM Steel Mills Weekly Maintenance Statistics

Telah Terbit: May 14, 2024 16:31
Sumber: SMM
SMM estimates that 1.0591 million mt of pig iron output will be lost from blast furnace maintenance during May 11-17, down 190,000 mt on a weekly basis.

SMM estimates that 1.0591 million mt of pig iron output will be lost from blast furnace maintenance during May 11-17, down 190,000 mt on a weekly basis. SMM estimates that 993,900 mt of pig iron output will be lost from blast furnace maintenance during May 18-24, down 65,200 mt on a weekly basis.

Rebar: 1.3673 million mt of output will be lost from maintenance during May 11-17, down 151,600 mt on a weekly basis; 1.1648 million mt of output will be lost from maintenance during May 18-24, down 202,500 mt on a weekly basis.

HRC: 152,800 mt of output will be lost from maintenance during May 11-17, down 19,500 mt on a weekly basis; 12,300 mt of output will be lost from maintenance during May 18-24, down 140,500 mt on a weekly basis.

CRC/galvanising: 23,300 mt of output will be lost from maintenance during May 11-17, up 22,000 mt on a weekly basis; no output will be lost from maintenance during May 18-24, down 23,300 mt on a weekly basis.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn