SMM Steel Mills Weekly Maintenance Statistics

Telah Terbit: Apr 30, 2024 11:45
Sumber: SMM
SMM estimates that 1.3359 million mt of pig iron output will be lost from blast furnace maintenance during Apr 27-May 3, down 130,300 mt on a weekly basis.

SMM estimates that 1.3359 million mt of pig iron output will be lost from blast furnace maintenance during Apr 27-May 3, down 130,300 mt on a weekly basis. SMM estimates that 1.2223 million mt of pig iron output will be lost from blast furnace maintenance during May 4-10, down 113,600 mt on a weekly basis.

Rebar: 1.5839 million mt of output will be lost from maintenance during Apr 27-May 3, down 71,000 mt on a weekly basis; 1.5558 million mt of output will be lost from maintenance during May 4-10, down 28,100 mt on a weekly basis.

HRC: 161,000 mt of output will be lost from maintenance during Apr 27-May 3, up 89,100 mt on a weekly basis; 128,900 mt of output will be lost from maintenance during May 4-10, down 32,100 mt on a weekly basis.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)