SMM Steel Mills Weekly Maintenance Statistics

Telah Terbit: Apr 17, 2024 10:30
Sumber: SMM
SMM estimates that 1.7287 million mt of pig iron output will be lost from blast furnace maintenance during Apr 13-19, down 100,000 mt on a weekly basis.

SMM estimates that 1.7287 million mt of pig iron output will be lost from blast furnace maintenance during Apr 13-19, down 100,000 mt on a weekly basis. SMM estimates that 1.5576 million mt of pig iron output will be lost from blast furnace maintenance during Apr 20-26, down 171,100 mt on a weekly basis.

Rebar: 1.6618 million mt of output will be lost from maintenance during Apr 13-19, down 46,200 mt on a weekly basis; 1.5364 million mt of output will be lost from maintenance during Apr 20-26, down 125,400 mt on a weekly basis.

HRC: 0 mt of output will be lost from maintenance during Apr 13-19, down 21,000 mt on a weekly basis; 139, 600 mt of output will be lost from maintenance during Apr 20-26, up 139,600 mt on a weekly basis.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn