SMM Steel Mills Weekly Maintenance Statistics

Telah Terbit: Apr 9, 2024 10:10
Sumber: SMM
SMM estimates that 1.8077 million mt of pig iron output will be lost from blast furnace maintenance during Apr 6-12, down 65,500 mt on a weekly basis.

SMM estimates that 1.8077 million mt of pig iron output will be lost from blast furnace maintenance during Apr 6-12, down 65,500 mt on a weekly basis. SMM estimates that 1.7727 million mt of pig iron output will be lost from blast furnace maintenance during Apr 13-19, down 35,000 mt on a weekly basis.

Rebar: 1.6251 million mt of output will be lost from maintenance during Apr 6-12, down 76,000 mt on a weekly basis; 1.5053 million mt of output will be lost from maintenance during Apr 13-19, down 119,800 mt on a weekly basis.

HRC: 21,000 mt of output will be lost from maintenance during Apr 6-12, down 69,000 mt on a weekly basis; 0 mt of output will be lost from maintenance during Apr 13-19, down 21,000 mt on a weekly basis.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn