Yunnan restarts - with a twist

Telah Terbit: Mar 22, 2024 10:15
News has come through that the Yunnan government has released additional power units to its local aluminium industry.

News has come through that the Yunnan government has released additional power units to its local aluminium industry.

We understand about 500,000 tonnes of smelting capacity is allowed to re-enter the market, and local companies are now preparing their pots.

But the news comes with a twist and perhaps a barb in the tail.

The additional power units are being released because of lower-than-expected energy sales to Guangdong province. In other words, it's not because of additional rains. This move to release some metal capacity comes 2-3 months ahead of the normal rainy season.

Consequently, local smelters are "hastening slowly" with their restart plans. AZ Global Managing Director Monte Zhang says that in his chats with the local industry, leaders have expressed some fear that the authorities may revoke the decision. It would only take for Guangzhou She, Shenzhen, and surrounding cities to gain an increase in economic activity, and Yunnan would have no choice but to return the power units to its biggest customer. Remember, too, that these decisions are not the principal realm of the local government - China Southern Grid decides on the power allocation.

China does not need additional primary metal right now. The market has just emerged from the holiday break, which saw inventory levels slowly rise through February and March. Russian metal continues to arrive in the country, and demand has not yet returned to prime levels. (We are approaching the peak season for demand, and there are some signs of improvement, but those signs are insufficient to say that we are back to good demand levels).

The last thing the local smelters need is yet another forced exit. The costs involved in restarting cold pots are enormous—you have to take every pot from room temperature to 950c, and that's done by injecting enormous amounts of electricity into each pot. They have already been ordered to shut down twice in the last two years. Will it happen again this year?

The market dropped slightly following this news. Monte Zhang says that 500,000 tonnes is not enough to make a big difference, especially if it is curtailed again.

Source:https://www.alcircle.com/press-release/yunnan-restarts-with-a-twist-110260

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
12 jam yang lalu
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
Baca Selengkapnya
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
12 jam yang lalu
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
12 jam yang lalu
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Baca Selengkapnya
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Xinjiang Boyuan Aluminum Co., Ltd. sedang mengupayakan penuh percepatan pembangunan proyek produk aluminium setengah jadi tipe baru dengan kapasitas tahunan 150.000 ton. Berlokasi di Taman Industri Hilir Aluminium Huoshaoshan, Zona Pengembangan Ekonomi dan Teknologi Zhundong Xinjiang, proyek ini memiliki total investasi 180 juta yuan dan mencakup area seluas 64 mu. Direncanakan akan dibangun dua bengkel produksi terstandar dengan total luas lantai 23.000 m². Dari segi konfigurasi lini produksi, proyek ini akan dilengkapi dengan dua lini produksi batang aluminium, delapan lini produksi gulungan dan strip aluminium cor-giling, serta satu lini produksi gulungan dan strip aluminium canai dingin. Setelah sepenuhnya selesai dan beroperasi, proyek ini diharapkan mencapai kapasitas produksi tahunan sebesar 60.000 ton kawat aluminium dan 90.000 ton gulungan aluminium.
12 jam yang lalu
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
12 jam yang lalu
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
Baca Selengkapnya
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
[Komentar Harian Harga ADC12: Futures Aluminium Konsolidasi di Level Tinggi, Spot ADC12 Konsolidasi Menguat] Kontrak aluminium paduan 2611 dibuka pada 23.430 yuan/mt hari ini, turun ke level terendah intraday 23.320 yuan/mt di mana ia menemukan dukungan sebelum berangsur pulih, berfluktuasi dalam kisaran 23.320-23.560 yuan/mt sepanjang hari, dan ditutup pada 23.435 yuan/mt, naik 0,11%.
12 jam yang lalu
Yunnan restarts - with a twist - Shanghai Metals Market (SMM)