[SMM Analysis] N-type polysilicon inventory rises and prices for orders fell

Telah Terbit: Mar 20, 2024 17:06
In late March, a new round of polysilicon order signing begins. Different from last month, the price of N-type material, which has always been in short supply, began to fell in this round.

In late March, a new round of polysilicon order signing begins. Different from last month, the price of N-type material, which has always been in short supply, began to fell in this round.

According to SMM, in the previous rounds of polysilicon order signing, N-type material inventory has always been in a relatively tight state, and tight shipments schedules from major manufacturers caused silicon material prices to remain high.

As the price of silicon wafers continued to fall in March, N-type silicon wafers were in losses even in terms of cash costs, and the pace of crystal pull-out plants slowed down. At the same time, some crystal pull-out plants stopped purchasing P-type materials and even cauliflower materials. The increase in usage ratio has led to a decrease in the demand for N-type silicon materials. Due to the increase in the supply of N-type silicon materials and the ramp-up of capacity newly put into production, N-type silicon material inventories have gradually begun to accumulate, which in turn led to the declines of silicon material prices.

At present, N-type silicon material quotations are as low as 68 yuan/kg, but it should be noted that these quotations are currently mainly concentrated in the quotations of second- and third-tier manufacturers. The top three companies kept prices firm at 72 yuan/kg.

SMM learned from the market that the current attitude of crystal pullers towards the current price reduction of silicon materials is relatively consistent, and believes that the decline in price will occur this week.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
14 jam yang lalu
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
Baca Selengkapnya
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
Baru-baru ini, PLTS Luobusha Fase I berkapasitas 850 MW di Kabupaten Qusum, Tibet, yang dibangun oleh PowerChina, berhasil lolos uji terima penyelesaian, memberikan dukungan penting untuk meredakan ketegangan pasokan-permintaan listrik regional dan memperkuat benteng pasokan energi dataran tinggi. PLTS Luobusha di Kabupaten Qusum, Tibet, mencakup area sekitar 4.289,59 mu, dengan total kapasitas terpasang 850 MW. Ini merupakan gelombang pertama proyek PLTS komersial utama di Basis Energi Bersih Yazhong di Tibet dan proyek pembangkit listrik bersih PLTS terbesar di bagian tengah dan hilir Sungai Yajiang. Proyek ini dikembangkan dalam empat fase, dengan Fase I berkapasitas 200 MW dan elevasi rata-rata 4.700 meter. Chengdu Engineering Corporation di bawah PowerChina melaksanakan pembangunan stasiun penguat 220 kV, area PLTS 50 MW, jalur transmisi 20,74 km, dan perluasan gardu induk di sisi berlawanan; Sinohydro Bureau 9 melaksanakan pembangunan area ladang PLTS 150 MW, memasang total 348.000 modul PLTS, beserta 64 transformator tipe kotak dan 704 inverter.
14 jam yang lalu
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
14 jam yang lalu
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
Baca Selengkapnya
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
Pada 31 Agustus, Departemen Energi AS (DOE) mengumumkan peluang pendanaan riset dan pengembangan PV luar angkasa baru dengan total hingga $12 juta. Pengumuman tersebut menyatakan tujuannya secara jelas: menurunkan biaya sel surya dan modul untuk aplikasi luar angkasa, memperluas kapasitas manufaktur domestik di AS, dan memajukan prototipe menuju validasi pihak ketiga di lingkungan luar angkasa atau dekat luar angkasa.
14 jam yang lalu
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
14 jam yang lalu
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
Baca Selengkapnya
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
Baru-baru ini, Xin Hengyuan Energy resmi meluncurkan proyek benchmark dukungan pelacakan 221 MW. Proyek ini merupakan proyek tunggal utama yang dikerjakan oleh perusahaan di kawasan Eropa, menandai terobosan penting dalam ekspansi strategis perusahaan ke pasar di luar Tiongkok. Hal ini secara signifikan memajukan pengembangan energi rendah karbon setempat dan memberikan dorongan kuat bagi transisi energi hijau di kawasan tersebut.
14 jam yang lalu