[SMM zinc morning comment] The upside space for SHFE zinc may be limited

Telah Terbit: Mar 8, 2024 10:00
Overnight, LME zinc opened at $2496/mt, hitting a low and high of $2486.5/mt and $2540/mt respectively, and closed at $2529/mt, up $38.5/mt or 1.55%. Trading volume increased to 15249 lots, and open interest decreased 2905 lots to 229,000 lots.

Overnight, LME zinc opened at $2496/mt, hitting a low and high of $2486.5/mt and $2540/mt respectively, and closed at $2529/mt, up $38.5/mt or 1.55%. Trading volume increased to 15249 lots, and open interest decreased 2905 lots to 229,000 lots. LME zinc inventory dropped by 2325 or 0.85% to 272575 mt. Federal Reserve official Powell's dovish speech boosted the market's confidence in interest rate cuts, the US dollar continued to weaken, and the early market optimism has not been fully digested, and the macro boost led to another rise in zinc.

Overnight, the most active SHFE 2404 zinc contract opened higher at 21,210 yuan/ton.It touched a high of 21,235 yuan/ton and a low of 21,135 yuan/ton, and finally closed up at 21,165 yuan/ton, up 205 yuan/ton, or 0.98%. The trading volume decreased to 48,273 lots, and the open interest decreased by 2,372 lots to 91,652 lots. Recently, downstream spot consumption has been poor, and imported zinc ingots continue to flow in, which may make up for the output reduction in maintenance and production shutdowns of some domestic smelters. It is expected that SHFE zinc will have little upside room.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
48 menit yang lalu
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
Baca Selengkapnya
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
SHFE Menyetujui Penyesuaian Kapasitas Gudang untuk Kontrak Berjangka Tembaga, Aluminium, dan Seng di Shanghai
Pada 2 September, Shanghai Futures Exchange (SHFE) mengumumkan telah menyetujui Shanghai Yuqiang Supply Chain Management Co., Ltd. untuk menyesuaikan kapasitas gudang yang ditunjuk untuk kontrak berjangka tembaga, aluminium, dan seng. Di lokasi penyimpanan di No. 3501 Gonghe New Road, Shanghai, perusahaan akan mencabut kualifikasi penyimpanan kontrak berjangka tembaga dan aluminium, sementara kapasitas gudang kontrak berjangka seng yang disetujui tetap tidak berubah pada 20.000 ton. Di lokasi di No. 2222 Jichuan Road, Distrik Minhang, Shanghai, kualifikasi penyimpanan kontrak berjangka seng akan dicabut, sementara kapasitas yang disetujui akan disesuaikan menjadi 45.000 ton tembaga dan 5.000 ton aluminium.
48 menit yang lalu
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
48 menit yang lalu
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
Baca Selengkapnya
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
Tambang Yinman milik Xingye Silver & Tin Akan Kembali Beroperasi Setelah Kecelakaan Fatal dan Inspeksi Keselamatan
Pada 2 September, Xingye Silver & Tin mengumumkan bahwa kecelakaan terjadi di anak perusahaan yang sepenuhnya dimilikinya, Yinman Mining, di West Ujimqin Banner, Mongolia Dalam, sekitar pukul 15.30 pada 26 Juli 2026, mengakibatkan satu korban jiwa dan tidak ada korban luka. Setelah kecelakaan tersebut, Yinman Mining melakukan inspeksi keselamatan menyeluruh dan menerapkan langkah-langkah perbaikan. Baru-baru ini, perusahaan menerima persetujuan dari Biro Manajemen Darurat West Ujimqin Banner untuk melanjutkan operasi pada sistem tailing pemrosesan bijihnya. Pabrik pemrosesan dijadwalkan untuk melanjutkan operasi pada 3 September 2026. Sementara itu, Yinman Mining melanjutkan pekerjaan perbaikan di area pertambangan dan bertujuan untuk melanjutkan operasi penambangan sesegera mungkin.
48 menit yang lalu
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
48 menit yang lalu
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
Baca Selengkapnya
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
Anak Perusahaan Shengda Resources Menyelesaikan Konsolidasi Hak Tambang, Memperluas Area Pertambangan dan Potensi Jangka Panjang
Pada 2 September, Shengda Resources mengumumkan bahwa anak perusahaannya yang sepenuhnya dimiliki, Chifeng Jindu Mining Co., Ltd., telah menyelesaikan konsolidasi hak penambangan untuk Tambang Perak-Timbal-Seng Shidi dan hak eksplorasi untuk Tambang Polimetalik Timbal-Seng di Sekitar Shidi. Jindu Mining telah menerima Sertifikat Kepemilikan Properti (Hak Penambangan) dan Izin Penambangan yang diterbitkan oleh Biro Sumber Daya Alam Kota Chifeng. Setelah konsolidasi, area penambangan meningkat dari 4,4750 km persegi menjadi 5,2397 km persegi. Perubahan ini diperkirakan tidak akan berdampak material terhadap hasil operasional perusahaan dalam jangka pendek, tetapi diharapkan dapat meningkatkan sumber daya yang dapat ditambang, memperpanjang umur tambang, dan memberikan dukungan sumber daya untuk pengembangan jangka panjang perusahaan.
48 menit yang lalu
[SMM zinc morning comment] The upside space for SHFE zinc may be limited - Shanghai Metals Market (SMM)