SMM Copper Morning Comment:Copper prices rose overnight

Telah Terbit: Mar 7, 2024 10:00
LME copper prices opened at $8530/mt and closed at $8546/mt in last evening trading, a gain of 0.67%, with the low-end of $8512.5/mt and the high-end of $8590/mt. Trading volume was 18,000 lots, and open interest stood at 282,000 lots.

LME copper prices opened at $8530/mt and closed at $8546/mt in last evening trading, a gain of 0.67%, with the low-end of $8512.5/mt and the high-end of $8590/mt. Trading volume was 18,000 lots, and open interest stood at 282,000 lots. The most active SHFE 2404 copper contract prices opened at 69200 yuan/mt and closed at 69420 yuan/mt last evening, up 0.55%, with the high-end of 69580 yuan/mt and the low-end of 69110 yuan/mt. Trading volumes stood at 28,000 lots and open interest stood at 152,000 lots. On the macro front, as Powell said on Capitol Hill that he would cut interest rates later this year, the U.S. dollar index fell, bolstering copper prices. In addition, Pan Gongsheng, governor of the PBOC, said that the current average statutory reserve requirement ratio is 7%, and there is still room for subsequent RRR cuts. In terms of fundamentals, from the supply side, the supply of copper in the spot market remains abundant. Some refineries have accumulated inventory due to the recent slow shipments, and their enthusiasm for low-price shipments has increased. On the consumption side, downstream demand has not been fully released, and only some downstream companies are replenishing goods at low prices, and the overall demand is still weak. Due to the influence of macro sentiment, copper prices will move at highs in the near future.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
9 jam yang lalu
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
Baca Selengkapnya
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Metals mengumumkan pada 1 September bahwa tambang Gediktepe di Türkiye memproduksi konsentrat tembaga pertamanya pada 31 Agustus, menandai dimulainya fase peningkatan produksi. Perusahaan akan meningkatkan throughput secara bertahap dan mengoptimalkan kinerja pabrik, dengan target produksi penuh pada akhir 2026. Target produksi tahunan kondisi tunak Gediktepe adalah 20.000–25.000 ton setara tembaga. Pengumuman lengkap tersebut juga mengonfirmasi bahwa tambang itu memproduksi konsentrat seng pertamanya pada Agustus 2026, meskipun tanggal spesifik dan volumenya tidak diungkapkan. SMM memperkirakan produksi seng dalam konsentrat tambang tersebut sekitar 10.000–15.000 ton seng terkandung pada 2026.
9 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
9 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
Baca Selengkapnya
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
9 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
11 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Baca Selengkapnya
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Epiroc telah mendapatkan pesanan sekitar SEK610 juta (US$64 juta) dari MMG Limited dan kontraktor pertambangannya, China Huaye dan 23MCC, untuk peralatan tambang bawah tanah guna mendukung perluasan Tambang Tembaga Khoemacau di Botswana. Pesanan ini mencakup rig pengeboran permuka, rig pengeboran produksi, rig pemasangan baut kabel, loader, dan truk tambang bawah tanah, beserta sistem kendali jarak jauh, suku cadang, pelatihan, dan dukungan teknis di lokasi. Peralatan tersebut akan mendukung perluasan Khoemacau yang sedang berlangsung oleh MMG, yang dirancang untuk meningkatkan kapasitas produksi tahunan dari sekitar 60.000 ton menjadi 130.000 ton logam tembaga dalam konsentrat. Proyek ini mencakup pembangunan pabrik pengolahan baru berkapasitas 4,5 Mt/tahun, yang akan meningkatkan total kapasitas penggilingan menjadi lebih dari 8 Mt/tahun, bersamaan dengan pengembangan Zone 5 North, Mango, dan Zeta North-East. Konsentrat tembaga pertama dari perluasan ini diharapkan pada H1 2028. Epiroc menyatakan pengiriman armada bawah tanah baru akan dimulai pada Q4 2026 dan diperkirakan selesai pada Q2 2028, secara garis besar sejalan dengan jadwal perluasan. Armada yang dipesan mencakup rig pengeboran permuka Boomer, rig pengeboran produksi Simba, rig pemasangan baut kabel Cabletec, loader Scooptram, dan truk bawah tanah Minetruck, dengan beberapa unit dilengkapi untuk operasi otomatisasi dan kendali jarak jauh. Pesanan peralatan ini merupakan tonggak eksekusi lain untuk perluasan Khoemacau yang telah disetujui, bukan target produksi baru. Dengan pengadaan yang terus berjalan dan pengiriman peralatan dijadwalkan hingga Q2 2028, proyek ini terus maju menuju rencana peningkatan kapasitas tembaga dalam konsentrat MMG menjadi 130.000 ton per tahun. Perluasan ini merupakan peningkatan signifikan yang direncanakan pada kapasitas produksi tembaga Khoemacau di Sabuk Tembaga Kalahari, Botswana.
11 jam yang lalu