Most active contract of industrial silicon futures fluctuated and fell to close down 0.26%

Telah Terbit: Feb 28, 2024 16:28
Today the most active industrial silicon contract (2404) opened at 13,370 yuan/ton and closed at 13,275 yuan/ton, down 35 yuan/ton from the previous trading day, a decrease of 0.26%; the highest price was 13,385 yuan/ton, the lowest price was 13,260 yuan/ton; 54,886 lots were traded, an increase of 19,218 lots from the previous trading day; open interest was 90,751 lots, an increase of 48,380 lots from the previous trading day.

Today the most active industrial silicon contract (2404) opened at 13,370 yuan/ton and closed at 13,275 yuan/ton, down 35 yuan/ton from the previous trading day, a decrease of 0.26%; the highest price was 13,385 yuan/ton, the lowest price was 13,260 yuan/ton; 54,886 lots were traded, an increase of 19,218 lots from the previous trading day; open interest was 90,751 lots, an increase of 48,380 lots from the previous trading day.

Spot: The spot price of industrial silicon fell by 50-100 yuan/ton in most areas today. Today, the average spot price of above-standard #553 in East China is 14,800 yuan/ton, which is 1,525 yuan/ton higher than the closing price of the most active contract, an increase of 3.39%; the average spot price of #421 in East China is 15,300 yuan/ton, and the spot price is 25 yuan/ton higher than the closing price of the most active contract, narrowing by 133.33%.

Fundamentals: Transactions in the industrial silicon market were light, and traders and terminal purchasers were increasingly keen to lower prices. Although upstream silicon factories want to raise prices, some silicon factories lowered prices to incentivise transactions. This round of silicon powder bidding has been launched one after another, and the bid price of some 99 silicon powder has dropped by about 300-500 yuan/ton compared with before the CNY holiday.

The most active industrial silicon contract has fluctuated around 13,300 yuan/ton in recent days, and is expected to continue to fluctuate at this level in the short term.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
3 jam yang lalu
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
Baca Selengkapnya
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
3 jam yang lalu
[SMM PV Flash]
5 jam yang lalu
[SMM PV Flash]
Baca Selengkapnya
[SMM PV Flash]
[SMM PV Flash]
Pabrik petrokimia terkemuka menghentikan satu lini produksi yang akan diaktifkan kembali kemarin, dan hari ini lini lain mulai memproduksi LDPE. Dalam jangka pendek, jadwal produksi perusahaan akan mempertahankan produksi paralel satu lini material tekanan tinggi dan satu lini material PV. Setelah penyesuaian lini ini, skala output material PV pabrik sedikit menyusut.
5 jam yang lalu
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
5 jam yang lalu
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
Baca Selengkapnya
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
Pada 31 Agustus 2026, proyek pembangkit listrik PV Huaneng Shaanxi Shenmu 100.000 kW berhasil terhubung ke jaringan listrik dengan kapasitas penuh, menandai bahwa kapasitas terpasang Cabang Energi Baru Huaneng Shaanxi melampaui 3 juta kW. Sejak dimulainya proyek Shenmu, menghadapi berbagai tantangan seperti cuaca berangin dan berpasir yang sering terjadi di Shaanxi utara, medan dan bentuk lahan yang kompleks, kondisi konstruksi yang terbatas, serta jadwal yang ketat, seluruh pekerja konstruksi bersatu, mengatasi kesulitan, dan mengejar keunggulan. Mereka secara ketat menerapkan persyaratan keselamatan produksi dan pengendalian mutu, mengoordinasikan rencana konstruksi secara ilmiah, mengoptimalkan alur proses konstruksi, dan secara tertib memajukan tugas-tugas utama termasuk pembangunan stasiun penguat tegangan, pemasangan rangka penyangga panel surya, peletakan modul, pemasangan jalur pengumpul, serta pengujian dan kalibrasi peralatan. Melalui manajemen yang terperinci, konstruksi yang terstandarisasi, dan penyelesaian masalah yang terjadwal, mereka secara efisien menyelesaikan berbagai kesulitan dan hambatan selama proses konstruksi, memajukan kemajuan proyek secara stabil, dan berhasil menyelesaikan kesimpulan sempurna dari koneksi jaringan pertama hingga koneksi jaringan kapasitas penuh, sepenuhnya menunjukkan kecepatan Huaneng, tanggung jawab Huaneng, dan kualitas Huaneng.
5 jam yang lalu