SK On Secures Vital Battery Material: A Strategic Agreement with Westwater Resources for Sustainable Energy Growth in North America

Telah Terbit: Feb 18, 2024 11:16 (GMT+8)
South Korean battery company SK On secures a vital supply agreement with US firm Westwater Resources for battery-grade natural graphite, enhancing its North American supply chain and complying with US legislation.

On February 13, South Korean battery company SK On announced a conditional supply agreement with U.S. battery cathode material supplier Westwater Resources to secure battery-grade natural graphite in North America.

Westwater Resources, established in 1977, holds exploration and mining rights in the 17,000-hectare Coosa graphite mining area in Alabama. SK On and Westwater Resources have a joint development agreement to develop environmentally friendly high-performance cathode materials suitable for SK On batteries.

The agreement allows SK On to purchase a total of 34,000 tons of natural graphite cathode products from 2027 to 2031, processed at Westwater Resources' Kellyton Graphite Plant near Kellyton, Alabama.

SK On plans to use these materials for battery production at its U.S. factories.

Currently, SK On operates two power battery factories in Georgia and has formed a joint venture, BlueOval, with Ford to build three battery factories in the United States.

The total capacity of the three SK On and Ford joint-venture factories is 129 GWh, with the Tennessee factory having an annual capacity of 43 GWh, and the two factories in Kentucky having a combined annual capacity of 86 GWh. In addition,

SK On has a joint venture with Hyundai Motor in Georgia, U.S., to build a power battery factory.

SK On believes that the signing of this agreement will strengthen its supply chain in North America and align with the U.S. Inflation Reduction Act (IRA) requirements for the domestic procurement of battery components and critical minerals.

Park Jong-jin, Deputy General Manager responsible for strategic procurement at SK On, stated that the company will continue seeking collaboration with potential battery material companies in North America.

If you have any questions regarding the industry data, or the news (e.g. how this can affect your business). Please feel free to reach out to me:

Robin He

SMM Li-ion Battery Materials Department

E: robinhe@smm.cn | T: +86-21-51595884

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM News] Solis mulai pengeboran litium di Campo Grande
25 Sep 2026 15:16 (GMT+8)
[SMM News] Solis mulai pengeboran litium di Campo Grande
Baca Selengkapnya
[SMM News] Solis mulai pengeboran litium di Campo Grande
[SMM News] Solis mulai pengeboran litium di Campo Grande
Solis Minerals telah memulai pengeboran inti di Proyek Lithium Campo Grande di Lembah Lithium Araçuaí-Salinas, Brasil. Perusahaan merencanakan lima lubang dengan total sekitar 1.000 m, dengan kedalaman yang direncanakan hingga 200 m, untuk menguji pegmatit lithium di sepanjang koridor 500 m. Target tersebut didasarkan pada anomali geokimia multi-elemen yang bertepatan di permukaan dan hasil pengeboran auger historis. Pekerjaan historis oleh Rio Tinto serta pemetaan dan pekerjaan geokimia selanjutnya oleh Solis menentukan target tersebut. Solis juga telah memetakan kawanan pegmatit baru yang terdiri dari tiga zona singkapan koheren di antara lubang yang direncanakan DHCG-001 dan DHCG-004. Program ini akan menguji kontinuitas, geometri, dan potensi lithium pegmatit di bawah permukaan, dimulai dari lokasi pegmatit yang dipetakan bertepatan dengan anomali geokimia. Solis menyatakan bahwa geologi dan geokimia Campo Grande sebanding dengan Proyek Lithium Colina milik PLS Group, sekitar 100 km ke arah barat daya. Secara terpisah, Solis telah menyelesaikan tujuh lubang bor di Proyek Lithium Mandacaru di Brasil, dengan hasil pengujian yang masih menunggu.
25 Sep 2026 15:16 (GMT+8)
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
25 Sep 2026 15:15 (GMT+8)
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
Baca Selengkapnya
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
Charger Metals telah mengerahkan rig pengeboran kedua ke Proyek Lithium Lake Johnston di Australia Barat sebagai bagian dari program 10.000 m yang menargetkan pertumbuhan sumber daya. Rig pengeboran intan dan sirkulasi balik kini beroperasi di deposit lithium Medcalf, dan pengeboran RC dimulai sekitar satu minggu lalu. Program ini akan menggandakan jumlah meter yang dibor di Medcalf. Pengeboran menargetkan perluasan dan pengisian pada estimasi sumber daya mineral tereka Medcalf sebesar 10,6 Mt dengan kadar 1% Li₂O. Pengeboran telah lebih mendefinisikan Target Eksplorasi Medcalf West sebesar 3–5 Mt pada kadar 1–1,4% Li₂O. Program ini juga bertujuan menyediakan inti bor intan untuk pengujian metalurgi dan geoteknik. Setelah peningkatan sumber daya Medcalf baru-baru ini, yang menaikkan Li₂O terkandung sebesar 34%, dewan Charger telah menyetujui Studi Lingkup pada Proyek Lake Johnston. Sumber daya saat ini berada pada grid pengeboran dominan 40 m x 80 m, termasuk 10.936 m pengeboran dengan biaya $32 per ton Li₂O terkandung. Program ini sepenuhnya didanai dari penjualan Proyek Lithium Bynoe oleh Charger kepada Core Lithium sebesar $3,75 juta tunai, yang diterima pada 17 Juli 2026. Lake Johnston terletak 450 km di timur Perth di Provinsi Yilgarn, sekitar 70 km dari Proyek Lithium Earl Grey, tempat Covalent Lithium memulai penambangan dan commissioning pada Maret 2024.
25 Sep 2026 15:15 (GMT+8)
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
25 Sep 2026 15:14 (GMT+8)
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
Baca Selengkapnya
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
Pada 23 September, Savannah Resources mengumpulkan dana US$30 juta untuk Proyek Litium Barroso di Portugal, melalui 408 juta saham pada harga £0,055 per saham, termasuk US$11,2 juta dari perjanjian subskripsi dengan pemegang saham utama. Ditambah kas yang tersedia sebesar US$15,5 juta, dana tersebut digunakan untuk fabrikasi komponen dengan waktu tunggu lama, pembangunan jalan akses, kontrak EPCM, rekayasa pabrik, perizinan, dan hak guna lahan. Studi kelayakan definitif (DFS) fase satu Barroso pada Juli 2026 menguraikan umur tambang 14 tahun dengan produksi 183.000 ton per tahun litium oksida, kadar 5,5%, berdasarkan harga US$1.788 per ton yang menghasilkan EBITDA US$3,2 miliar, arus kas bebas US$1,9 miliar, dan NPV setelah pajak US$913 juta. Deposit tersebut memiliki 39 juta ton pada kadar 1,05% Li2O dengan kandungan 411.900 ton, sumber daya spodumena batuan keras terbesar di Eropa. Pendanaan ini memajukan salah satu dari sedikit sumber litium batuan keras skala besar yang sedang dikembangkan di luar rantai pasok Tiongkok yang terhubung dengan Afrika dan Amerika Selatan, mendukung target diversifikasi bahan baku kritis Uni Eropa.
25 Sep 2026 15:14 (GMT+8)