Telah Terbit: Jan 12, 2024 19:31
SMM Analysis: What is the culprit for the disturbance of enterprise production? A recent overview of reduced production capacity for alumina. According to SMM, a certain alumina enterprise in Shanxi Province reduced production due to insufficient ore supply this week. Some alumina enterprises in the southwest region have planned to stop production and take a holiday due to previous mine safety issues, with the initial planned production stoppage period lasting for up to a month. In addition, heavy pollution weather has been frequent in the northern region since the winter, and various places have issued heavy pollution weather warnings. According to SMM research, heavy pollution weather has returned to Henan Province this week, and some enterprises have stopped part of their calcination capacity due to local environmental protection production restriction policies. SMM has compiled an overview of the reduced production capacity of domestic alumina enterprises in the past month. Please refer to the specific contents in the table below.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
10 jam yang lalu
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
Baca Selengkapnya
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
A00 sedikit terkoreksi, scrap aluminium tetap stabil secara keseluruhan [Tinjauan Harian Scrap Aluminium]
10 jam yang lalu
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
10 jam yang lalu
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Baca Selengkapnya
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Xinjiang Boyuan Aluminum Memajukan Proyek Kapasitas Tahunan 150.000 MT di Zona Ekonomi Zhundong
Xinjiang Boyuan Aluminum Co., Ltd. sedang mengupayakan penuh percepatan pembangunan proyek produk aluminium setengah jadi tipe baru dengan kapasitas tahunan 150.000 ton. Berlokasi di Taman Industri Hilir Aluminium Huoshaoshan, Zona Pengembangan Ekonomi dan Teknologi Zhundong Xinjiang, proyek ini memiliki total investasi 180 juta yuan dan mencakup area seluas 64 mu. Direncanakan akan dibangun dua bengkel produksi terstandar dengan total luas lantai 23.000 m². Dari segi konfigurasi lini produksi, proyek ini akan dilengkapi dengan dua lini produksi batang aluminium, delapan lini produksi gulungan dan strip aluminium cor-giling, serta satu lini produksi gulungan dan strip aluminium canai dingin. Setelah sepenuhnya selesai dan beroperasi, proyek ini diharapkan mencapai kapasitas produksi tahunan sebesar 60.000 ton kawat aluminium dan 90.000 ton gulungan aluminium.
10 jam yang lalu
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
10 jam yang lalu
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
Baca Selengkapnya
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
[Tinjauan Harian Harga ADC12] Harga aluminium berjangka berfluktuasi di level tinggi; ADC12 spot menguat
[Komentar Harian Harga ADC12: Futures Aluminium Konsolidasi di Level Tinggi, Spot ADC12 Konsolidasi Menguat] Kontrak aluminium paduan 2611 dibuka pada 23.430 yuan/mt hari ini, turun ke level terendah intraday 23.320 yuan/mt di mana ia menemukan dukungan sebelum berangsur pulih, berfluktuasi dalam kisaran 23.320-23.560 yuan/mt sepanjang hari, dan ditutup pada 23.435 yuan/mt, naik 0,11%.
10 jam yang lalu