Telah Terbit: Jan 5, 2024 19:59

SMM Research: Multiple Regions' Secondary Lead Smelters Reduce Production, Four Provinces' Operating Rates Dropped Sharply This Week | Attached 2024 Secondary Lead Weekly Research Sample Adjustment Explanation

SMM News on January 5th: According to Shanghai Nonferrous Network (SMM) research, this week (December 30th - January 5th), SMM's weekly operating rate for secondary lead smelters in four provinces was 16.06% based on the old sample, a decrease of 11.81% compared to the previous period; the new sample... some smelters in Inner Mongolia reduced production due to equipment malfunctions...

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
5 menit yang lalu
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Baca Selengkapnya
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Bunker Hill Mining announced on September 1 that its Bunker Hill lead-zinc mine in Idaho, USA, produced its first lead and zinc concentrates in late June 2026. The operation is currently ramping up, with ongoing optimisation of underground mining and processing operations. The processing plant has a design capacity of 1,800 tonnes per day, with planned combined annual output of approximately 85,000 tonnes of zinc concentrate and silver-bearing lead concentrate. The company plans to supplement working capital through standby financing and concentrate prepayment arrangements, targeting full commercial production by the end of 2026. SMM forecasts the mine’s 2026 output at approximately 25,000 tonnes of zinc in concentrate and 10,000–15,000 tonnes of lead in concentrate, both on a contained-metal basis. Meanwhile, recent underground drilling at the Cate-8 mineralised zone returned maximum sample grades of 41.1% lead and 7.41% zinc. The company is assessing the feasibility of incorporating the zone into its near-term mine plan. As production ramps up, the mine is expected to provide incremental lead and zinc supply to North America.
5 menit yang lalu
SHFE timbal turun tipis 0,03% dengan bayangan atas panjang, konsolidasi di level tinggi tetap utuh [Komentar Singkat Futures Timbal]
4 jam yang lalu
SHFE timbal turun tipis 0,03% dengan bayangan atas panjang, konsolidasi di level tinggi tetap utuh [Komentar Singkat Futures Timbal]
Baca Selengkapnya
SHFE timbal turun tipis 0,03% dengan bayangan atas panjang, konsolidasi di level tinggi tetap utuh [Komentar Singkat Futures Timbal]
SHFE timbal turun tipis 0,03% dengan bayangan atas panjang, konsolidasi di level tinggi tetap utuh [Komentar Singkat Futures Timbal]
4 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (02 Sep)
6 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (02 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (02 Sep)
Data: Pergerakan pasar SHFE, DCE (02 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan nonbesi di SHFE dan DCE pada 2 September 2026
6 jam yang lalu
SMM Research: Multiple Regions' Secondary Lead Smelters Reduce Product - Shanghai Metals Market (SMM)