MIIT: Prices In Chinese PV Industry Chain In Persistent Downturn In H2 2023, Low And Mid-End Products At Risk Of Overcapacity  

Telah Terbit: Dec 13, 2023 10:36
On December 12, the Ministry of Industry and Information Technology released the operation status of the national photovoltaic manufacturing industry from September to October 2023.

On December 12, the Ministry of Industry and Information Technology released the operation status of the national photovoltaic manufacturing industry from September to October 2023.

National polysilicon production reached 236,600 mt from September to October, a year-on-year increase of 90%.

National silicon wafer output reached 87.95GW from September to October, a year-on-year increase of 61%.
Ntional crystalline silicon battery production reached 83.81GW from September to October, a year-on-year increase of 78.7%.


National crystalline silicon module output reached 79GW from September to October, a year-on-year increase of 86.7%.

Domestic photovoltaic product prices have kept falling since the second half of the year. From January to October, the prices of polysilicon and module products fell by 60% and 40% respectively. The export growth rate of some photovoltaic products has slowed down. The risk of overcapacity in mid- to low-end PV products requires great attention.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
8 jam yang lalu
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
Baca Selengkapnya
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
Tingkat Operasi Rangka PV Stabil, Ekspektasi Melemah; Destocking Ingot Aluminium Meningkat, Pusat Harga Aluminium Naik [Analisis SMM]
8 jam yang lalu
[SMM PV Flash]
9 jam yang lalu
[SMM PV Flash]
Baca Selengkapnya
[SMM PV Flash]
[SMM PV Flash]
Pabrik petrokimia terkemuka menghentikan satu lini produksi yang akan diaktifkan kembali kemarin, dan hari ini lini lain mulai memproduksi LDPE. Dalam jangka pendek, jadwal produksi perusahaan akan mempertahankan produksi paralel satu lini material tekanan tinggi dan satu lini material PV. Setelah penyesuaian lini ini, skala output material PV pabrik sedikit menyusut.
9 jam yang lalu
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
9 jam yang lalu
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
Baca Selengkapnya
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
[SMM Berita PV] Proyek PV Huaneng Shaanxi Shenmu 100 MW Capai Koneksi Jaringan Kapasitas Penuh
Pada 31 Agustus 2026, proyek pembangkit listrik PV Huaneng Shaanxi Shenmu 100.000 kW berhasil terhubung ke jaringan listrik dengan kapasitas penuh, menandai bahwa kapasitas terpasang Cabang Energi Baru Huaneng Shaanxi melampaui 3 juta kW. Sejak dimulainya proyek Shenmu, menghadapi berbagai tantangan seperti cuaca berangin dan berpasir yang sering terjadi di Shaanxi utara, medan dan bentuk lahan yang kompleks, kondisi konstruksi yang terbatas, serta jadwal yang ketat, seluruh pekerja konstruksi bersatu, mengatasi kesulitan, dan mengejar keunggulan. Mereka secara ketat menerapkan persyaratan keselamatan produksi dan pengendalian mutu, mengoordinasikan rencana konstruksi secara ilmiah, mengoptimalkan alur proses konstruksi, dan secara tertib memajukan tugas-tugas utama termasuk pembangunan stasiun penguat tegangan, pemasangan rangka penyangga panel surya, peletakan modul, pemasangan jalur pengumpul, serta pengujian dan kalibrasi peralatan. Melalui manajemen yang terperinci, konstruksi yang terstandarisasi, dan penyelesaian masalah yang terjadwal, mereka secara efisien menyelesaikan berbagai kesulitan dan hambatan selama proses konstruksi, memajukan kemajuan proyek secara stabil, dan berhasil menyelesaikan kesimpulan sempurna dari koneksi jaringan pertama hingga koneksi jaringan kapasitas penuh, sepenuhnya menunjukkan kecepatan Huaneng, tanggung jawab Huaneng, dan kualitas Huaneng.
9 jam yang lalu
MIIT: Prices In Chinese PV Industry Chain In Persistent Downturn In H2 2023, Low And Mid-End Products At Risk Of Overcapacity   - Shanghai Metals Market (SMM)