"【18MW Offshore Wind Turbines, Received the First Domestic Bulk Order】Recently, the bidding for the purchase of wind turbines for the 700MW offshore wind farm project in the waters outside of Lianjiang, by the China Resources Lianjiang, was opened. Orient Wind Power is the expected winning bidder. According to the announcement, the scope of this tender includes: the survey and design from the offshore wind farm project in the waters outside of Lianjiang to the overall completion acceptance (including the warranty period) of the survey design, the purchase and service of the wind turbine units (including the tower), commissioning, trial operation, handover of production, and warranty period, and all other related work.
In terms of wind turbine equipment, the requirements are for no more than 49 wind turbine units, with a single unit capacity of 12MW ≤ capacity ≤ 18MW, hub center height not exceeding 165m, no more than 2 types of models, and from the same wind turbine equipment manufacturer."

![[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga](https://imgqn.smm.cn/usercenter/gCNEi20251217171715.jpeg)

