Telah Terbit: Nov 14, 2023 13:50

Recently, the No.2 unit of Shouyang Mingtai 2×350MW low-calorific coal-fired power plant designed by China Energy Engineering Group Shanxi Branch has successfully completed 168 hours full-load trial operation and entered the dual-machine commercial operation stage.

The project newly builds two 350MW ultra-supercritical circulating fluidized bed direct air-cooled heating extraction type generating units, synchronously constructs a fully enclosed coal yard and efficient desulfurization, denitrification and dust removal facilities, and the main pollutant emissions meet the ultra-low emission standards of Shanxi Province.

After the project is put into operation, it is expected to generate 3.5 billion kilowatt-hours of electricity, 3 million tons of heat and 3 million tons of low-calorific coal per year, which can meet the heating demand of 8 million square meters in Shouyang County.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn