Telah Terbit: Oct 23, 2023 18:00
On October 23, the State Energy Administration's Comprehensive Department issued a notice on further strengthening the safety production of power generation. According to the notice, since this year, safety accidents have occurred in the power generation field, the number of accidents has increased year-on-year, exposing some power companies still have problems such as inadequate implementation of main responsibility, inadequate rectification of hidden risks, and serious management of equipment operation and maintenance. The power generation safety situation is still severe. At present, it is the peak period of unit autumn inspection and the preparation period for peak winter. There are many inspection sites, operation links, outsourcing teams and participants, and the safety risks are high. In order to further strengthen the safety production of power generation and prevent and control all kinds of accidents, the following requirements are hereby notified: 1. Strict implementation of corporate main responsibility; 2. Strengthening the control of production operation process; 3. Strengthening the management of key parts; 4. Strengthening the safety management of outsourcing; 5. Strengthening safety supervision.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
8 jam yang lalu
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
Baca Selengkapnya
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.
Baru-baru ini, PLTS Luobusha Fase I berkapasitas 850 MW di Kabupaten Qusum, Tibet, yang dibangun oleh PowerChina, berhasil lolos uji terima penyelesaian, memberikan dukungan penting untuk meredakan ketegangan pasokan-permintaan listrik regional dan memperkuat benteng pasokan energi dataran tinggi. PLTS Luobusha di Kabupaten Qusum, Tibet, mencakup area sekitar 4.289,59 mu, dengan total kapasitas terpasang 850 MW. Ini merupakan gelombang pertama proyek PLTS komersial utama di Basis Energi Bersih Yazhong di Tibet dan proyek pembangkit listrik bersih PLTS terbesar di bagian tengah dan hilir Sungai Yajiang. Proyek ini dikembangkan dalam empat fase, dengan Fase I berkapasitas 200 MW dan elevasi rata-rata 4.700 meter. Chengdu Engineering Corporation di bawah PowerChina melaksanakan pembangunan stasiun penguat 220 kV, area PLTS 50 MW, jalur transmisi 20,74 km, dan perluasan gardu induk di sisi berlawanan; Sinohydro Bureau 9 melaksanakan pembangunan area ladang PLTS 150 MW, memasang total 348.000 modul PLTS, beserta 64 transformator tipe kotak dan 704 inverter.
8 jam yang lalu
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
8 jam yang lalu
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
Baca Selengkapnya
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa
Pada 31 Agustus, Departemen Energi AS (DOE) mengumumkan peluang pendanaan riset dan pengembangan PV luar angkasa baru dengan total hingga $12 juta. Pengumuman tersebut menyatakan tujuannya secara jelas: menurunkan biaya sel surya dan modul untuk aplikasi luar angkasa, memperluas kapasitas manufaktur domestik di AS, dan memajukan prototipe menuju validasi pihak ketiga di lingkungan luar angkasa atau dekat luar angkasa.
8 jam yang lalu
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
8 jam yang lalu
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
Baca Selengkapnya
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan
Baru-baru ini, Xin Hengyuan Energy resmi meluncurkan proyek benchmark dukungan pelacakan 221 MW. Proyek ini merupakan proyek tunggal utama yang dikerjakan oleh perusahaan di kawasan Eropa, menandai terobosan penting dalam ekspansi strategis perusahaan ke pasar di luar Tiongkok. Hal ini secara signifikan memajukan pengembangan energi rendah karbon setempat dan memberikan dorongan kuat bagi transisi energi hijau di kawasan tersebut.
8 jam yang lalu