Recently, Huaneng released the "Public Notice of Candidates for Bidding of Outsourcing Maintenance and Inspection of 133 Sets of Huarui Wind Turbines in Gailiban Wind Farm of Huaneng Mendong Branch and 199 Sets of Huarui Wind Turbines" , showing that the first bidder of the project is Jingneng Technology Co., Ltd. with a bidding price of 19,667,700 yuan.
Project Brief: Huaneng New Energy Co., Ltd. Mendong Branch Gailiban Wind Farm has a total of 132 Huarui wind turbines, with a single unit capacity of 1.5MW, wind turbine model: Huarui SL1500 unit, installed capacity of 198MW. At present, all 132 Huarui wind turbines are grid-connected and running. Kaifu Wind Farm has a total of 67 Huarui wind turbines, with a single unit capacity of 1.5MW, wind turbine model: Huarui SL1500 unit, installed capacity of 100MW. At present, all 67 Huarui wind turbines are grid-connected and running.
![[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
