Telah Terbit: Oct 9, 2023 09:46
Recently, the first set of tower cylinders of the Fanchenggang Tanying Phase I Wind Power Project undertaken by China Hydropower Yunnan Branch was successfully shipped. The site of the Fanchenggang Tanying Phase I Project is located in Tanying Township, Fancheng District, Fangchenggang City, Guangxi Zhuang Autonomous Region. The total installed capacity of the project is 15GW, and Yunnan Branch undertakes the production and production of all 24 sets of tower cylinders, including 21 Goldwind 6.25GW 110m tower cylinders and 3 Goldwind 6.25GW 140m segmented tower cylinders, with a total project volume of 9457.87 tons. After the project is put into production, it is expected to generate 350 million kWh of electricity per year. As a clean energy development and utilization project, the energy saving and emission reduction effect is significant, saving about 96,000 tons of standard coal per year, with good social benefits.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Recently, the first set of tower cylinders of the Fanchenggang Tanying - Shanghai Metals Market (SMM)