On September 21, the 100,000-ton capacity of Xinhuan Silicon Energy Technology Co., Ltd. (Hohhot Base) under Xunxin Technology has officially put into production, and the output quality fully meets the production requirements of N-type products, which is a great gift to the 74th anniversary of the National Day.
Hohhot Base is the fourth particle silicon production base of Xunxin Technology after Xuzhou, Leshan and Baotou. The project officially started construction on November 21, 2022, with a construction period of 10 months, setting a "world's fastest" construction speed for the 100,000-ton multi-crystalline silicon project. With the continuous optimization and improvement of the particle silicon modular system, the capacity of the Hohhot Base project will reach 120,000 tons after it is put into production, and the upper limit of the effective capacity of the stock project base will continue to increase. This also means that the total capacity of Xunxin Technology's four particle silicon bases will exceed 400,000 tons.
![[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
