Recently, at the construction site of the first large-scale photovoltaic monocrystalline silicon project in Shuozhou City - the Sanyi Shuozhou 5GW monocrystalline silicon construction project, the first batch of 20 sets of monocrystalline furnaces have entered the factory and started installation. The construction personnel are rushing to the construction period and catching up with the schedule. It is planned to ignite around September 20 and enter the trial production stage.
The project has a total investment of 1.2 billion yuan. Since the cooperation intention was reached on May 8, it will continue to produce N-type high-efficiency monocrystalline products with high minority life, low carbon content and concentrated resistance.
![[SMM Berita PV] Di ketinggian 4.700 meter! Proyek PV terbesar di bagian tengah dan hilir Sungai Yarlung Zangbo di Tibet telah selesai dibangun.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Berita PV] Departemen Energi AS (DOE) Investasikan $12 Juta untuk Mengembangkan Teknologi PV Luar Angkasa](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM Berita PV] Membangun Patokan Eropa | Proyek Sistem Pelacak 221 MW Chiko Solar Energy di Italia Resmi Diluncurkan](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
