Telah Terbit: Aug 29, 2023 12:45
Recently, seven departments including the Ministry of Industry and Information Technology, the National Development and Reform Commission, the Ministry of Finance, the Ministry of Natural Resources, the Ministry of Commerce, the General Administration of Customs, and the State Grain and Reserve Bureau jointly issued the "Work Plan for Stable Growth of Non-ferrous Metal Industry", proposing that the main goals of the non-ferrous metal industry for stable growth from 2023 to 2024 are: stable growth of the output of major products such as copper and aluminum, an average annual growth of about 5% for the output of ten non-ferrous metals, positive progress in the domestic development of resources such as copper and lithium, further improvement in the quality of non-ferrous metal deep processing products, and dynamic balance of supply and demand. The business income will maintain growth, fixed asset investment will continue to increase, the trade structure will continue to be optimized, green and intelligent transformation and upgrading will be accelerated, and the unit energy consumption of smelting products such as copper and lead will decrease by more than 2% annually. It is expected that the added value of non-ferrous metal industry will increase by about 5.5% year-on-year in 2023 and more than 5.5% in 2024.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
7 jam yang lalu
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
Baca Selengkapnya
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Metals mengumumkan pada 1 September bahwa tambang Gediktepe di Türkiye memproduksi konsentrat tembaga pertamanya pada 31 Agustus, menandai dimulainya fase peningkatan produksi. Perusahaan akan meningkatkan throughput secara bertahap dan mengoptimalkan kinerja pabrik, dengan target produksi penuh pada akhir 2026. Target produksi tahunan kondisi tunak Gediktepe adalah 20.000–25.000 ton setara tembaga. Pengumuman lengkap tersebut juga mengonfirmasi bahwa tambang itu memproduksi konsentrat seng pertamanya pada Agustus 2026, meskipun tanggal spesifik dan volumenya tidak diungkapkan. SMM memperkirakan produksi seng dalam konsentrat tambang tersebut sekitar 10.000–15.000 ton seng terkandung pada 2026.
7 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
7 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
Baca Selengkapnya
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
7 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
9 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Baca Selengkapnya
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Epiroc telah mendapatkan pesanan sekitar SEK610 juta (US$64 juta) dari MMG Limited dan kontraktor pertambangannya, China Huaye dan 23MCC, untuk peralatan tambang bawah tanah guna mendukung perluasan Tambang Tembaga Khoemacau di Botswana. Pesanan ini mencakup rig pengeboran permuka, rig pengeboran produksi, rig pemasangan baut kabel, loader, dan truk tambang bawah tanah, beserta sistem kendali jarak jauh, suku cadang, pelatihan, dan dukungan teknis di lokasi. Peralatan tersebut akan mendukung perluasan Khoemacau yang sedang berlangsung oleh MMG, yang dirancang untuk meningkatkan kapasitas produksi tahunan dari sekitar 60.000 ton menjadi 130.000 ton logam tembaga dalam konsentrat. Proyek ini mencakup pembangunan pabrik pengolahan baru berkapasitas 4,5 Mt/tahun, yang akan meningkatkan total kapasitas penggilingan menjadi lebih dari 8 Mt/tahun, bersamaan dengan pengembangan Zone 5 North, Mango, dan Zeta North-East. Konsentrat tembaga pertama dari perluasan ini diharapkan pada H1 2028. Epiroc menyatakan pengiriman armada bawah tanah baru akan dimulai pada Q4 2026 dan diperkirakan selesai pada Q2 2028, secara garis besar sejalan dengan jadwal perluasan. Armada yang dipesan mencakup rig pengeboran permuka Boomer, rig pengeboran produksi Simba, rig pemasangan baut kabel Cabletec, loader Scooptram, dan truk bawah tanah Minetruck, dengan beberapa unit dilengkapi untuk operasi otomatisasi dan kendali jarak jauh. Pesanan peralatan ini merupakan tonggak eksekusi lain untuk perluasan Khoemacau yang telah disetujui, bukan target produksi baru. Dengan pengadaan yang terus berjalan dan pengiriman peralatan dijadwalkan hingga Q2 2028, proyek ini terus maju menuju rencana peningkatan kapasitas tembaga dalam konsentrat MMG menjadi 130.000 ton per tahun. Perluasan ini merupakan peningkatan signifikan yang direncanakan pada kapasitas produksi tembaga Khoemacau di Sabuk Tembaga Kalahari, Botswana.
9 jam yang lalu