Spot Transactions and Mine Bidding Are Active, With Continuous Increase in spot TCs

Telah Terbit: Jul 26, 2023 11:12
Sumber: SMM
As of last Friday (July 21), the SMM imported copper concentrate index (weekly) reported $93.05/mt, marking an increase of $0.31/mt compared to the previous index on July 14. According to SMM market research, the spot market transactions and mine bidding activities for copper concentrate have been quite active recently. The pricing coefficient for domestic trade mines with a grade of 20% is between 88.5% and 89.5%.

As of last Friday (July 21), the SMM imported copper concentrate index (weekly) reported $93.05/mt, marking an increase of $0.31/mt compared to the previous index on July 14. According to SMM market research, the spot market transactions and mine bidding activities for copper concentrate have been quite active recently. The pricing coefficient for domestic trade mines with a grade of 20% is between 88.5% and 89.5%.

Regarding mine bidding: In Chile, a certain mine concluded a tender for 40,000 mt of clean ore with a scheduled delivery period in September. Among them, 30,000 mt were transacted between smelters and the mine, with TC at a high level of above $88/mt. Additionally, 10,000 mt were transacted between traders and the mine, with a high-level TC at over $78/mt. Codelco conducted spot tenders for Andina and El Teniente copper mines, with a TC settlement between the mining companies and two trading firms at a low level of $81-82/mt, with scheduled delivery periods in August to October. The Carmen copper mine in the Philippines conducted a spot tender for 30,000 mt, with TC settlements between three trading firms and the mining company at a high level of over $78/mt.

In the spot market: In order to make up for the previous shortfall of 30,000 mt of copper concentrate due to arsenic exceeding the standard and being rejected by customs, a smelter in Central China has procured a portion of port spot goods from traders. The smelter purchased 10,000 mt of clean ore, scheduled for June shipment and arrival in mid-July, from traders at over $88/mt. They also purchased another 10,000 mt of clean ore, scheduled for June shipment and arrival in mid-July, from traders at a high TC price of over $88/mt. Finally, they procured 10,000 mt of oceanic clean ore, scheduled for August shipment, from traders at a low TC price of $91-92/mt. Recently, there have been transactions between traders and smelters for Las Bambas copper concentrate and other oceanic clean ores, with a settlement price ranging from $93-94/mt.

 

More popular news:

Shenzhen Released 24 Measures To Support High-Quality Development Of Foreign Trade

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

SMM Daily Comments (Jul 3): SHFE Base Metals Rose across the Board with Tin Surging, Ferrous Metals Prices Closed Mixed

SMM Daily Comments (Jul 5): Base and Ferrous Metals Prices Mostly Fell, WTI Soared despite Lingering Concerns over Global Economic Downturn

SMM Daily Comments (Jul 6): SHFE, LME Base Metals Diverged with SHFE Nickel and Tin Skyrocketing, Ferrous Metals Rose across the Board

China Commodity Supply and Demand Boomed in June

China Vows To Increase Macro-Control Efforts, Expand Consumption And Stabilise Investment

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

Copper Inventories in China Bonded Zones Plunged This Week

SAIC: Car Sales in June Rose to Highest for The Year


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
11 jam yang lalu
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
Baca Selengkapnya
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Metals mengumumkan pada 1 September bahwa tambang Gediktepe di Türkiye memproduksi konsentrat tembaga pertamanya pada 31 Agustus, menandai dimulainya fase peningkatan produksi. Perusahaan akan meningkatkan throughput secara bertahap dan mengoptimalkan kinerja pabrik, dengan target produksi penuh pada akhir 2026. Target produksi tahunan kondisi tunak Gediktepe adalah 20.000–25.000 ton setara tembaga. Pengumuman lengkap tersebut juga mengonfirmasi bahwa tambang itu memproduksi konsentrat seng pertamanya pada Agustus 2026, meskipun tanggal spesifik dan volumenya tidak diungkapkan. SMM memperkirakan produksi seng dalam konsentrat tambang tersebut sekitar 10.000–15.000 ton seng terkandung pada 2026.
11 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
11 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
Baca Selengkapnya
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
11 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
13 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Baca Selengkapnya
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Epiroc telah mendapatkan pesanan sekitar SEK610 juta (US$64 juta) dari MMG Limited dan kontraktor pertambangannya, China Huaye dan 23MCC, untuk peralatan tambang bawah tanah guna mendukung perluasan Tambang Tembaga Khoemacau di Botswana. Pesanan ini mencakup rig pengeboran permuka, rig pengeboran produksi, rig pemasangan baut kabel, loader, dan truk tambang bawah tanah, beserta sistem kendali jarak jauh, suku cadang, pelatihan, dan dukungan teknis di lokasi. Peralatan tersebut akan mendukung perluasan Khoemacau yang sedang berlangsung oleh MMG, yang dirancang untuk meningkatkan kapasitas produksi tahunan dari sekitar 60.000 ton menjadi 130.000 ton logam tembaga dalam konsentrat. Proyek ini mencakup pembangunan pabrik pengolahan baru berkapasitas 4,5 Mt/tahun, yang akan meningkatkan total kapasitas penggilingan menjadi lebih dari 8 Mt/tahun, bersamaan dengan pengembangan Zone 5 North, Mango, dan Zeta North-East. Konsentrat tembaga pertama dari perluasan ini diharapkan pada H1 2028. Epiroc menyatakan pengiriman armada bawah tanah baru akan dimulai pada Q4 2026 dan diperkirakan selesai pada Q2 2028, secara garis besar sejalan dengan jadwal perluasan. Armada yang dipesan mencakup rig pengeboran permuka Boomer, rig pengeboran produksi Simba, rig pemasangan baut kabel Cabletec, loader Scooptram, dan truk bawah tanah Minetruck, dengan beberapa unit dilengkapi untuk operasi otomatisasi dan kendali jarak jauh. Pesanan peralatan ini merupakan tonggak eksekusi lain untuk perluasan Khoemacau yang telah disetujui, bukan target produksi baru. Dengan pengadaan yang terus berjalan dan pengiriman peralatan dijadwalkan hingga Q2 2028, proyek ini terus maju menuju rencana peningkatan kapasitas tembaga dalam konsentrat MMG menjadi 130.000 ton per tahun. Perluasan ini merupakan peningkatan signifikan yang direncanakan pada kapasitas produksi tembaga Khoemacau di Sabuk Tembaga Kalahari, Botswana.
13 jam yang lalu