Copper Scrap Shortages Eased

Telah Terbit: Jun 6, 2023 11:38
Sumber: SMM
At the beginning of the week, the copper price fluctuated around 65,000 yuan/mt. The suppliers of copper scrap were reluctant to sell, but some traders of copper scrap sold a small amount of copper scrap to withdraw funds. The supply growth of copper scrap was limited. In the middle of the week, copper futures rose above 66,000 yuan/mt, and the suppliers of copper scrap were less reluctant to sell their goods. Therefore, the supply of copper scrap last week increased from the previous week.

At the beginning of the week, the copper price fluctuated around 65,000 yuan/mt. The suppliers of copper scrap were reluctant to sell, but some traders of copper scrap sold a small amount of copper scrap to withdraw funds. The supply growth of copper scrap was limited. In the middle of the week, copper futures rose above 66,000 yuan/mt, and the suppliers of copper scrap were less reluctant to sell their goods. Therefore, the supply of copper scrap last week increased from the previous week.

On the demand side, due to the recent shortage of copper scrap and the narrow price difference between copper cathode and copper scrap, copper anode plate plants that used copper scrap as raw materials cut output due to losses. As a result, available copper anode in the market decreased, and RCs of blister copper in south China fell. In addition, due to the difficulty in purchasing raw materials and weak downstream demand, some copper rod factories that used copper scrap as raw materials halted production during the week. Overall, the demand for copper scrap has decreased. This combined with the increase in supply slightly eased the tight supply of copper scrap last week.

More popular news:

Commodity Price Bubble Finally Burst, but Metals Demand Will Surge

Glencore to Massively Expand Copper Capacity

SMM Daily Comments (Jun 2): All Metals Closed Higher with SHFE Nickel Leading Gains, Coke Surged

SMM Daily Comments (Jun 1): Base Metals Mostly Rose with SHFE Aluminium Surging, Ferrous Metals Rose across the board, Iron Ore Skyrocketed

SMM Daily Comments (Jun 5): Base Metals Mostly Fell, Ferrous Metals Bucked the Trend to Surge, Oil Gained Further on Saudi Arabia Output Cuts in July

SMM Indonesia Nickel and Cobalt Industry Chain Conference: Global Nickel & Cobalt Supply and Demand Prospect, Impact from NEV Development

Commerzbank Lowers Price Forecast for Copper, Aluminium, Zinc and Nickel for 2023 and 2024

Rumours Say Glencore Will Raise Takeover Bid for Teck Resources, but Another Big Obstacle Lies Ahead

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
10 jam yang lalu
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
Baca Selengkapnya
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Ekspansi Sulfida Gediktepe Menghasilkan Konsentrat Tembaga dan Seng Pertama; Produksi Penuh Ditargetkan Akhir 2026
ACG Metals mengumumkan pada 1 September bahwa tambang Gediktepe di Türkiye memproduksi konsentrat tembaga pertamanya pada 31 Agustus, menandai dimulainya fase peningkatan produksi. Perusahaan akan meningkatkan throughput secara bertahap dan mengoptimalkan kinerja pabrik, dengan target produksi penuh pada akhir 2026. Target produksi tahunan kondisi tunak Gediktepe adalah 20.000–25.000 ton setara tembaga. Pengumuman lengkap tersebut juga mengonfirmasi bahwa tambang itu memproduksi konsentrat seng pertamanya pada Agustus 2026, meskipun tanggal spesifik dan volumenya tidak diungkapkan. SMM memperkirakan produksi seng dalam konsentrat tambang tersebut sekitar 10.000–15.000 ton seng terkandung pada 2026.
10 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
11 jam yang lalu
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
Baca Selengkapnya
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
[ Analisis SMM ] Panduan Visual Laporan Semester 2026 dari 19 Pabrik Peleburan Tembaga
11 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
12 jam yang lalu
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Baca Selengkapnya
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
MMG Pesan Peralatan Senilai US$64 Juta untuk Mendukung Ekspansi Khoemacau di Botswana
Epiroc telah mendapatkan pesanan sekitar SEK610 juta (US$64 juta) dari MMG Limited dan kontraktor pertambangannya, China Huaye dan 23MCC, untuk peralatan tambang bawah tanah guna mendukung perluasan Tambang Tembaga Khoemacau di Botswana. Pesanan ini mencakup rig pengeboran permuka, rig pengeboran produksi, rig pemasangan baut kabel, loader, dan truk tambang bawah tanah, beserta sistem kendali jarak jauh, suku cadang, pelatihan, dan dukungan teknis di lokasi. Peralatan tersebut akan mendukung perluasan Khoemacau yang sedang berlangsung oleh MMG, yang dirancang untuk meningkatkan kapasitas produksi tahunan dari sekitar 60.000 ton menjadi 130.000 ton logam tembaga dalam konsentrat. Proyek ini mencakup pembangunan pabrik pengolahan baru berkapasitas 4,5 Mt/tahun, yang akan meningkatkan total kapasitas penggilingan menjadi lebih dari 8 Mt/tahun, bersamaan dengan pengembangan Zone 5 North, Mango, dan Zeta North-East. Konsentrat tembaga pertama dari perluasan ini diharapkan pada H1 2028. Epiroc menyatakan pengiriman armada bawah tanah baru akan dimulai pada Q4 2026 dan diperkirakan selesai pada Q2 2028, secara garis besar sejalan dengan jadwal perluasan. Armada yang dipesan mencakup rig pengeboran permuka Boomer, rig pengeboran produksi Simba, rig pemasangan baut kabel Cabletec, loader Scooptram, dan truk bawah tanah Minetruck, dengan beberapa unit dilengkapi untuk operasi otomatisasi dan kendali jarak jauh. Pesanan peralatan ini merupakan tonggak eksekusi lain untuk perluasan Khoemacau yang telah disetujui, bukan target produksi baru. Dengan pengadaan yang terus berjalan dan pengiriman peralatan dijadwalkan hingga Q2 2028, proyek ini terus maju menuju rencana peningkatan kapasitas tembaga dalam konsentrat MMG menjadi 130.000 ton per tahun. Perluasan ini merupakan peningkatan signifikan yang direncanakan pada kapasitas produksi tembaga Khoemacau di Sabuk Tembaga Kalahari, Botswana.
12 jam yang lalu