SHANGHAI, Mar 31 (SMM) – Wuhan Iron and Steel (Group) Co. began to overhaul the No. 2 hot-rolling production line on March 30. The overhaul is expected to last for a week, with an average daily output of about 6,000 mt to be affected.
SHANGHAI, Mar 31 (SMM) – Wuhan Iron and Steel (Group) Co. began to overhaul the No. 2 hot-rolling production line on March 30. The overhaul is expected to last for a week, with an average daily output of about 6,000 mt to be affected.
Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.