Will Polysilicon Achieve Supply-Demand Balance in the Long Run amid Government Restrictions on Deliberate Price Inflation

Telah Terbit: Aug 25, 2022 11:15 (GMT+8)
It is specially highlighted in the Notice that in order to promote the stability of the industrial chain, relevant enterprises and public trading institutions are encouraged to reasonably build stocks of materials such as polysilicon and batteries, while hoarding is strictly prohibited.

SHANGHAI, Aug 25 (SMM) - The Ministry of Industry and Information Technology, the State Administration for Market Regulation and the National Energy Administration jointly issued the Notice on Promoting the Coordinated Development of the PV Industry Chain and Supply Chain. It is specially highlighted in the Notice that in order to promote the stability of the industrial chain, relevant enterprises and public trading institutions are encouraged to reasonably build stocks of materials such as polysilicon and batteries, while hoarding is strictly prohibited. Local market supervisors shall strengthen the supervision and management, enhance cross-departmental law enforcement, and severely crack down on illegal activities such as price gouging, monopoly, and production and sale of fake and shoddy products in the photovoltaic industry.

A veteran in the photovoltaic industry said that the Notice has given the industry a solid warning at the moment when capital is "madly" pouring into the photovoltaic field. It could help to avoid repeated investment as well as waste of resources after investment in outdated production capacity. At the same time, it also reminds companies to pay attention to the win-win situation of the entire industry while focusing to their own economic profits.

Hu Qimu, chief researcher of Sinosteel Economic Research Institute, also said that since the pandemic outbreak, the prices of raw materials have continued to rise sharply. Among them, there are not only the problem of insufficient operating rates of raw materials, but also the factors of hoarding and speculation in the market. The rapid growth of upstream raw material prices is not conducive to the sustainable operation of photovoltaic enterprises. Therefore, it is necessary to promote the coordinated resumption of production in the industrial chain, in-depth cooperation between upstream and downstream entities, restore the order of market circulation, avoid bottlenecks in the industrial chain that reduce operational efficiency.

As we all know, the prices of polysilicon, the upstream material in the photovoltaic industry chain, have been on the upward trend after entering 2022 due to the occupied supply under long-term orders as well as the imbalance of supply and demand as a result of the mismatch of production capacity. According to SMM prices, as of August 24, the spot price of recharging polysilicon was 300-310 yuan/kg, wth an average of 305 yuan/kg, up 79 yuan/kg or 34.96% from 226 yuan/kg at the beginning of the year.

Recently, the power rationing in Sichuan province has aroused strong concerns in the industry. After all, Sichuan, as the "important hub" of the photovoltaic industry, is one of the main producing regions of polysilicon. According to SMM survey, although the power cut in Sichuan has led to the shutdown of many local polysilicon enterprises, which has escalated the supply tension in the polysilicon market, the recent increase in polysilicon prices has not been obvious.

It is partly because of limited transactions in the market amid few sources available in the market when it is not time for the intensive signing of long-term orders. On the other hand, the market players are generally pessimistic towards the third and fourth quarters, and high downstream cost also made the buyers say no to high prices. Therefore, it is unlikely that polysilicon prices will rise significantly.

Compared with the widely rumoured shortage of polysilicon in the market, Lv Jinbiao, deputy director of the Expert Committee of Silicon Industry Branch of China Nonferrous Metals Industry Association, once said that he prefers to define the current supply and demand environment of polysilicon as "tightly balanced". He believes that the overall supply of polysilicon in 2021 was not in short supply, but balanced.

He believes that the seasonal supply tightness and structural tension are the reasons of polysilicon price hike. For example, high-quality dense polysilicon was tight in supply, while non-dense polysilicon was able to meet the demand.

On August 24, Lin Ruhai, executive vice president of the Silicon Industry Branch and president of the Institute of Nonferrous Metals Technology and Economics, also said that the existing expansion plan can meet the long-term demand for photovoltaic installations. It is estimated that the domestic polysilicon capacity will reach 1.19 million mt/year in 2022, and its global proportion will increase to 88.3%; the output will reach 810,000 mt, taking up 85.3% of the global total.

By the end of 2025, China's polysilicon capacity will exceed 5 million mt per year. If overseas supply is counted, the capacity scale can meet the global installed capacity demand of about 1,500GW.

In terms of silicon wafers, Lin predicts that the domestic silicon wafer capacity will reach 580GW in 2022, and its global proportion will increase to 99.1%; the output will reach 340GW, taking up 99.4% of the world’s total.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM PV Flash] Modul Jinko Solar Tiger Neo 3 Diteken untuk Proyek PV Terbesar di Kirgistan
13 jam yang lalu
[SMM PV Flash] Modul Jinko Solar Tiger Neo 3 Diteken untuk Proyek PV Terbesar di Kirgistan
Baca Selengkapnya
[SMM PV Flash] Modul Jinko Solar Tiger Neo 3 Diteken untuk Proyek PV Terbesar di Kirgistan
[SMM PV Flash] Modul Jinko Solar Tiger Neo 3 Diteken untuk Proyek PV Terbesar di Kirgistan
Baru-baru ini, Jinko Solar, perusahaan PV terkemuka global, mengumumkan penandatanganan pembangkit listrik tenaga surya terbesar di Kirgistan berkapasitas 325 MW, mencapai kesepakatan pasokan untuk modul efisiensi tinggi Tiger Neo 3.0. Proyek ini akan secara eksklusif menggunakan modul Jinko Tiger Neo 3.0, dan setelah selesai, akan menjadi pembangkit listrik tenaga surya terbesar di Kirgistan hingga saat ini, membuka terobosan penting bagi diversifikasi energi terbarukan di negara Asia Tengah yang telah lama mengandalkan tenaga air sebagai pilar utamanya.
13 jam yang lalu
[SMM PV Flash] Proyek pembangkit listrik PV komplementer perikanan-surya China Datang Zhangpu 150 MW mencapai commissioning kapasitas penuh
13 jam yang lalu
[SMM PV Flash] Proyek pembangkit listrik PV komplementer perikanan-surya China Datang Zhangpu 150 MW mencapai commissioning kapasitas penuh
Baca Selengkapnya
[SMM PV Flash] Proyek pembangkit listrik PV komplementer perikanan-surya China Datang Zhangpu 150 MW mencapai commissioning kapasitas penuh
[SMM PV Flash] Proyek pembangkit listrik PV komplementer perikanan-surya China Datang Zhangpu 150 MW mencapai commissioning kapasitas penuh
Pada 30 Oktober, PLTS komplementer perikanan-solar Zhangpu 150MW milik China Datang berhasil mencapai commissioning kapasitas penuh, menandai langkah maju yang solid bagi Divisi Energi Baru China Datang Corporation Limited Cabang Fujian di bidang pengembangan energi hijau dan menyuntikkan momentum kuat ke dalam transformasi hijau dan rendah karbon perusahaan.
13 jam yang lalu
[SMM PV Flash] Beijing Energy Group: Amankan kuota proyek angin dan surya 4GW untuk inisiatif pendukung Jilin Power-to-Beijing!
13 jam yang lalu
[SMM PV Flash] Beijing Energy Group: Amankan kuota proyek angin dan surya 4GW untuk inisiatif pendukung Jilin Power-to-Beijing!
Baca Selengkapnya
[SMM PV Flash] Beijing Energy Group: Amankan kuota proyek angin dan surya 4GW untuk inisiatif pendukung Jilin Power-to-Beijing!
[SMM PV Flash] Beijing Energy Group: Amankan kuota proyek angin dan surya 4GW untuk inisiatif pendukung Jilin Power-to-Beijing!
Pada 3 November, Biro Energi Provinsi Jilin menerbitkan Pemberitahuan tentang Penetapan Indikator Pembangunan Proyek Pendukung Energi Baru untuk Proyek Transmisi Listrik ke Tiongkok Utara dari Basis Energi Bersih Songliao Timur Laut, yang menegaskan bahwa Beijing Energy Group memperoleh indikator pembangunan energi baru sebesar 4 juta kW. Proyek "Listrik Jilin ke Beijing" mengandalkan koridor transmisi arus searah tegangan ultra-tinggi ±800 kV, dengan total panjang jalur melebihi 1.000 kilometer, melintasi Jilin, Mongolia Dalam, Liaoning, Hebei, Tianjin, dan Beijing. Proyek ini diharapkan selesai sepenuhnya dan beroperasi pada tahun 2029, memungkinkan listrik hijau bersih dari Jilin dan Heilongjiang dipasok langsung ke Beijing. Proyek ini merencanakan 3,35 juta kW proyek tenaga angin dan 650.000 kW proyek PLTS, termasuk: 2,35 juta kW proyek tenaga angin dan 650.000 kW proyek pembangkit listrik tenaga surya di Baicheng, serta proyek pembangkit listrik tenaga surya 1 juta kW di Songyuan, menciptakan pola pembangunan yang menampilkan komplementaritas angin-surya dan koordinasi multi-energi. Proyek ini juga mengoordinasikan perencanaan dan pembangunan pekerjaan pendukung seperti integrasi jaringan listrik, penyimpanan energi pendukung, dan koridor transmisi, memastikan agregasi yang efisien serta penyaluran energi bersih yang aman dan stabil.
13 jam yang lalu