Notice on the production capacity replacement Plan of the 47000 ton Electrolytic Aluminum Construction Project of Inner Mongolia Jinlian Aluminum Co., Ltd.

[announcement on capacity replacement Plan of 47000 ton Electrolytic Aluminum Construction Project of Inner Mongolia Jinlian Aluminum Co., Ltd.] Inner Mongolia Industry and Information Department issued "notice on capacity replacement Plan of 47000 ton Electrolytic Aluminum Construction Project of Inner Mongolia Jinlian Aluminum Co., Ltd." the capacity replacement of the 47000 ton electrolytic aluminum construction project involved in 34 500KA electrolytic cells of Inner Mongolia Jinlian Aluminum Co., Ltd. Production is expected to start in May 2022.

Notice on the production capacity replacement Plan of the 47000 ton Electrolytic Aluminum Construction Project of Inner Mongolia Jinlian Aluminum Co., Ltd.

In accordance with the guiding opinions of the General Office of the State Council on creating a good Market Environment to promote the structural Adjustment of Nonferrous Metals Industry to promote Transformation and increase benefits (State Office issued (2016) No. 42) and the relevant requirements of the Ministry of Industry and Information Technology on the implementation of capacity replacement by means of merger and reorganization of Electrolytic Aluminum Enterprises Inner Mongolia Autonomous region Department of Industry and Information Technology announced the capacity replacement plan of 47000 tons of electrolytic aluminum construction project of Inner Mongolia Jinlian Aluminum Co., Ltd., there is no objection during the publicity period, it is hereby announced. The public is welcome to supervise.

April 8, 2022

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Notice on the production capacity replacement Plan of the 47000 ton Electrolytic Aluminum Construction Project of Inner Mongolia Jinlian Aluminum Co., Ltd. - Shanghai Metals Market (SMM)