SMM Evening Comments (Mar 18): Shanghai Nonferrous Metals Mostly Closed in the Positive Territory on Disturbed Supplies on Repeating COVID

Telah Terbit: Mar 18, 2022 19:00 (GMT+8)
Shanghai nonferrous metals mostly closed with gains today with nickel being the only exception, but nickel still had strong support. While the market supply has been tightened due to repeating COVID that disturbed the logistics to some extent.

SHANGHAI, Mar 18 (SMM) – Shanghai nonferrous metals mostly closed with gains today with nickel being the only exception, but nickel still had strong support. While the market supply has been tightened due to repeating COVID that disturbed the logistics to some extent.

Shanghai copper rose 0.77%, aluminium added 3.26%, lead jumped 0.46%, zinc advanced 0.63%, tin advanced 3.69%, and nickel fell 0.82%.

Copper: The most-traded SHFE 2204 copper closed up 0.77% or 560 yuan/mt at 72,830 yuan/mt, with open interest down 3,279 lots to 99,282 lots.

On the macro front, Bank of England raise the benchmark interest rate by 25 basis points to pre-pandemic level, and warned that if energy prices remain high, inflation could reach double-digit level by the end of the year. Knot, European Central Bank Governor, also suggested the possibility of raising the rate twice this year. President Xi Jinping will have a conference call with Mr. Joe Biden concerning Sino-US relationship as well as other issues with key concern on March 18 as scheduled.

Aluminium: The most-traded SHFE 2205 aluminium closed up 3.26% or 720 yuan/mt to 22,830 yuan/mt, with open interest up 34,350 lots to 216,466 lots.

Aluminium prices rose on low inventory which has been falling. The recently resurging pandemic also disturbed the logistics in Shandong.

On the fundamentals, downstream demand was suppressed by high prices. On the supply side, new capacities are being put into production intensively.

Lead: The most-traded SHFE 2205 lead closed up 0.46% or 70 yuan/mt at 15,265 yuan/mt, with open interest up 2,405 lots to 57,815 lots.

Downstream companies mostly purchased on demand amid low lead prices in the past week, while secondary lead prices were even once higher than that of primary lead due to tight supplies, in which case downstream rigid demand flowed back to primary lead. In addition, repeating pandemic disturbed the logistics of lead ingot, tightening the supplies to some extent.

Zinc: The most-traded SHFE 2205 zinc closed up 0.63% or 160 yuan/mt at 25,545 yuan/mt, with open interest up 3,944 lots to 84,271 lots.

On the fundamentals, the consumption side was sluggish due to falling terminal orders, and the situation deteriorated amid disturbed transportation and work from home. In the spot market, social inventory across seven regions dropped 9,500 mt from a week ago due to delayed shipments on spreading COVID, and relatively sound transactions in the first half of the week.

Tin: The most-traded SHFE 2205 tin closed up 3.69% or 12,090 yuan/mt at 339,900 yuan/mt, with open interest up 3,115 lots to 32,613 lots.

In the spot market, most upstream companies quoted mostly with premiums of 8,000-10,000 yuan/mt over SHFE 2205 in morning trade, and held firm to the prices. But the premiums dropped to some extend amid falling SHFE tin prices in intraday trading. And upstream participants’ willingness to hold prices firm also weakened marginally after the prices reached desired level.

SHFE warrants inventory dropped 168 mt to 2,098 mt, down 550 mt or 20.77% in the past week. According to SMM research, refined tin social inventory dropped 1,630 mt to 3,201 mt, down 33.74% on a weekly basis. Both inventories recorded low after the Chinese New Year, underpinning tin prices.

Nickel: The most-traded SHFE 2204 nickel closed down 0.82% or 1,810 yuan/mt at 219,620 yuan/mt, with open interest down 3,816 lots to 53,010 lots.

On the fundamentals, NORNICKEL nickel, Sumitomo, NIKKELVERK nickel as well as nickel briquette could not declare customs due to great import losses, tightening the supply of pure nickel. For NPI, the prices gained strong support amid rising nickel ore prices.

On the demand side, downstream demand was suppressed by high pure nickel prices, and is waiting for the prices to return to normal. According to SMM research, both nickel sulphate and precursor plants were curtailing their production.

In terms of stainless steel, spot transactions and logistics were both affected by the spreading pandemic.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
02 Oct 2026 16:31 (GMT+8)
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
Baca Selengkapnya
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 telah memulai pembangunan jalur penggilingan keempat di tambang tembaga-molibdenum Sierra Gorda di wilayah Atacama, Chili. Ekspansi senilai US$725 juta ini berlangsung selama tiga tahun mulai Januari 2027, dengan penyelesaian pada akhir 2029 dan produksi penuh pada paruh kedua 2030. Kapasitas pemrosesan bijih meningkat 26%, dari 131.000 ton per hari menjadi 165.000 ton per hari. Produksi tembaga tahunan diproyeksikan naik dari 165.000 ton pada 2025 menjadi 195.000 ton, dengan produk sampingan 6.000 ton molibdenum, 58.000 ons emas, dan 1,7 juta ons perak. Proyek ini menciptakan lebih dari 900 lapangan kerja langsung dan didanai dari arus kas operasional serta utang. Biaya operasional per unit diperkirakan turun sekitar 10%.
02 Oct 2026 16:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
02 Oct 2026 15:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Baca Selengkapnya
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Resources memberikan perkembangan terbaru mengenai Studi Kelayakan Awal (PFS) untuk proyek polimetalik Iberian Belt West di Spanyol, menyatakan bahwa studi tersebut telah berjalan jauh namun masih dalam tinjauan teknis akhir. Perusahaan menyampaikan bahwa proses tinjauan telah diperluas untuk mencakup pengawasan teknis dan jaminan kualitas tambahan sebelum dipublikasikan. Akibatnya, Emerita kini memperkirakan PFS akan dirilis dalam beberapa minggu mendatang, bukan dalam jangka waktu yang sebelumnya diindikasikan. Iberian Belt West memiliki mineralisasi tembaga, seng, timbal, emas, dan perak serta merupakan salah satu aset utama Emerita pada tahap pengembangan di Spanyol. PFS diharapkan memberikan rincian terbaru mengenai rencana tambang yang diusulkan, konfigurasi pemrosesan, kebutuhan modal, biaya operasional, dan keekonomian proyek. Emerita menyatakan bahwa pekerjaan tinjauan tambahan dimaksudkan untuk memastikan konsistensi dan kelengkapan di seluruh disiplin teknis yang berkontribusi pada studi tersebut sebelum difinalisasi. Perusahaan tidak mengumumkan tanggal publikasi spesifik yang direvisi, dan tidak ada angka produksi, modal, atau keekonomian baru yang diungkapkan dalam pembaruan terbaru. Perpanjangan tinjauan menunda tonggak teknis utama berikutnya untuk Iberian Belt West, tetapi perusahaan terus mengindikasikan bahwa PFS hampir selesai. Bagi pasar tembaga, signifikansi studi tersebut akan bergantung pada profil produksi dan keekonomian proyek yang akhirnya diungkapkan, terutama kontribusi tembaga relatif terhadap logam berbayar lainnya dalam proyek. Oleh karena itu, perhatian akan tetap tertuju pada waktu rilis PFS dan apakah studi akhir secara material mengubah prospek pengembangan proyek.
02 Oct 2026 15:31 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
02 Oct 2026 15:27 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Baca Selengkapnya
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Minerals telah melaporkan hasil pengeboran tambahan dari program eksplorasi 2026 di proyek tembaga-emas Carmacks di Yukon, Kanada, dengan pengeboran step-out baru yang memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral yang ada. Lubang bor CD-26-058 menghasilkan 75,55 meter dengan kadar 1,19% tembaga, 0,97 g/t emas, 10,4 g/t perak, dan 335 ppm molibdenum, setara dengan 2,18% ekuivalen tembaga. Interval tersebut mencakup 48,66 meter dengan kadar 1,61% tembaga, 1,39 g/t emas, 15,1 g/t perak, dan 475 ppm molibdenum, setara dengan 3,03% CuEq. Di dalam lubang yang sama, interval berkadar lebih tinggi sepanjang 14,50 meter menghasilkan 2,30% tembaga, 2,68 g/t emas, 29,5 g/t perak, dan 1.015 ppm molibdenum, setara dengan 5,08% CuEq. Lubang kedua, CD-26-059, memotong 93,99 meter dengan kadar 0,96% tembaga, 0,70 g/t emas, 4,6 g/t perak, dan 919 ppm molibdenum, setara dengan 1,94% CuEq. Ini mencakup 63,97 meter dengan kadar 1,26% tembaga, 0,96 g/t emas, 6,3 g/t perak, dan 1.049 ppm molibdenum, setara dengan 2,52% CuEq. Cascadia menyatakan bahwa hasil terbaru terus memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral saat ini dan menyoroti sifat berkadar lebih tinggi dari perluasan tersebut. Interval pengeboran yang dilaporkan merupakan ketebalan hasil pengeboran, dengan lebar sebenarnya diperkirakan sekitar 60–70%. Hasil step-out terbaru menunjukkan bahwa mineralisasi tembaga-emas di Zona 2000S meluas melampaui batas Sumber Daya Mineral Carmacks saat ini. Interval yang lebar dan zona internal berkadar lebih tinggi dapat mendukung perluasan sumber daya di masa depan jika pengeboran tambahan mengonfirmasi kontinuitasnya. Namun, perpotongan baru ini belum dimasukkan ke dalam Estimasi Sumber Daya Mineral yang diperbarui, sehingga dampak akhirnya terhadap skala proyek dan perencanaan tambang masih harus ditentukan.
02 Oct 2026 15:27 (GMT+8)