Lead Ingot Social Inventory Down 10,600 mt on Week

Telah Terbit: Nov 05, 2021 15:20 (GMT+8)
Social inventories of lead ingots across Shanghai, Guangdong, Zhejiang, Jiangsu and Tianjin decreased 10,600 mt from October 29 and 7,800 mt from November 1 to 170,000 mt as of November 5.

SHANGHAI, Nov 5 (SMM) – Social inventories of lead ingots across Shanghai, Guangdong, Zhejiang, Jiangsu and Tianjin decreased 10,600 mt from October 29 and 7,800 mt from November 1 to 170,000 mt as of November 5.

According to SMM survey, the power rationing in Henan was lifted this week, but major secondary lead smelters in Anhui are forced to suspend production due to the temporary power outage on the line transformation. At the same time, Hebei suspended production due to the air pollution control, reducing lead ingot transportation to surrounding consumption areas. Downstream companies turn to consume social stocks. In addition, the delivery is about to undergo next week. On the one hand, the temporary power outage in Anhui was eased, and the air pollution control in Hebei is about to be lifted. Lead ingot supply is expected to recover. The decline of lead ingots is likely to slow as some to-be-delivered cargoes will arrive at the delivery warehouses approaching the delivery date.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Lumentum Komitmen $87 Juta untuk Mengamankan Kapasitas Wafer InP AXT hingga 2031】
10 jam yang lalu
【Flash | Lumentum Komitmen $87 Juta untuk Mengamankan Kapasitas Wafer InP AXT hingga 2031】
Baca Selengkapnya
【Flash | Lumentum Komitmen $87 Juta untuk Mengamankan Kapasitas Wafer InP AXT hingga 2031】
【Flash | Lumentum Komitmen $87 Juta untuk Mengamankan Kapasitas Wafer InP AXT hingga 2031】
AXT dan Lumentum menandatangani perjanjian reservasi kapasitas yang mengikat untuk substrat wafer Indium Fosfida (InP) hingga 31 Desember 2031. AXT akan mencadangkan kapasitas produk minimum tahunan dan mendukung kapasitas tambahan, sementara Lumentum akan memberikan dua setoran masing-masing sebesar $43,5 juta, dengan total $87 juta, yang akan diterapkan sebagai kredit pengiriman. Lumentum bertanggung jawab atas kekurangan pembelian tahunan, dengan pengecualian tertentu, sementara kegagalan AXT untuk mengirimkan kapasitas minimum merupakan pelanggaran material. SMM memandang komitmen enam tahun ini sebagai sinyal permintaan yang kuat untuk substrat InP dan indium kemurnian tinggi. Volume wafer, campuran diameter, dan konsumsi indium terkait tidak diungkapkan.
10 jam yang lalu
【Flash | Semtech Tambah Ruang Cleanroom Seiring Meningkatnya Permintaan Fotonik InP】
14 jam yang lalu
【Flash | Semtech Tambah Ruang Cleanroom Seiring Meningkatnya Permintaan Fotonik InP】
Baca Selengkapnya
【Flash | Semtech Tambah Ruang Cleanroom Seiring Meningkatnya Permintaan Fotonik InP】
【Flash | Semtech Tambah Ruang Cleanroom Seiring Meningkatnya Permintaan Fotonik InP】
Semtech menyatakan dalam presentasi laba 25 Agustus bahwa portofolio fotonik pusat datanya mencakup chip gain, laser CW daya tinggi, SOA, dan fotodioda berkecepatan tinggi, sementara perusahaan telah mengamankan pengiriman peralatan untuk tahun fiskal 2027 dan menambah ruang bersih. Semtech mengakuisisi HieFo pada bulan Maret, menambah manufaktur chip gain InP dan laser DFB berbasis di AS. Penjualan pusat data kuartal kedua tahun fiskal 2027 mencapai $100 juta, naik 39% kuartal-ke-kuartal dan 91% tahun-ke-tahun; penjualan kuartal ketiga ditargetkan naik 45% kuartal-ke-kuartal dan 160% tahun-ke-tahun. SMM meyakini pembangunan ini mendukung permintaan jangka menengah untuk InP dan indium kemurnian tinggi, meskipun tidak ada kapasitas terpasang atau konsumsi indium yang diungkapkan.
14 jam yang lalu
【SMM Berita Kilat】Bunker Hill Menambahkan Kriteria Pemulihan Logam ke Target Produksi Komersial Akhir Tahunnya
14 jam yang lalu
【SMM Berita Kilat】Bunker Hill Menambahkan Kriteria Pemulihan Logam ke Target Produksi Komersial Akhir Tahunnya
Baca Selengkapnya
【SMM Berita Kilat】Bunker Hill Menambahkan Kriteria Pemulihan Logam ke Target Produksi Komersial Akhir Tahunnya
【SMM Berita Kilat】Bunker Hill Menambahkan Kriteria Pemulihan Logam ke Target Produksi Komersial Akhir Tahunnya
Bunker Hill menyatakan pada 5 Oktober bahwa tambang seng-timbal-peraknya di Idaho tetap berada di jalur untuk mencapai produksi komersial pada akhir 2026. Kriteria yang direvisi mensyaratkan throughput minimal 65% dari kapasitas terpasang pabrik sebesar 1.800 ton per hari, disertai perolehan seng, timbal, dan perak minimal 70%, selama 60 hari berturut-turut. Program pengeboran permukaan 10 lubang sepanjang 975 meter juga telah dimulai di Page.
14 jam yang lalu