Global mineral resources reserves: lithium ore 128 million tons cobalt ore 6.68 million tons nickel ore 90.63 million tons

Telah Terbit: Oct 25, 2021 10:29
[global mineral resources reserves: lithium ore 128 million tons cobalt ore 6.68 million tons nickel ore 90.63 million tons] by 2020, the global lithium ore (lithium carbonate) reserves 128 million tons, resources 349 million tons, mainly distributed in Chile, Australia, Argentina, Bolivia and other countries. Cobalt ore reserves of 6.68 million tons, resources of 23.44 million tons, Congo (Kinshasa), Indonesia, Australia and other countries are the most enriched. Nickel reserves are 90.63 million tons and resources are 260 million tons. Indonesia ranks first in the world in reserves, while Australia, Russia and other countries are rich in resources.

On October 22nd, the Global Mineral Resources Strategy Research Center of China Geological Survey released the Evaluation report of Global Lithium, Cobalt, Nickel, Tin and Potash Mineral Resources reserves (2021).

Data show that by 2020, the global lithium ore (lithium carbonate) reserves of 128 million tons, resources of 349 million tons, mainly distributed in Chile, Australia, Argentina, Bolivia and other countries. Cobalt ore reserves of 6.68 million tons, resources of 23.44 million tons, Congo (Kinshasa), Indonesia, Australia and other countries are the most enriched. Nickel reserves are 90.63 million tons and resources are 260 million tons. Indonesia ranks first in the world in reserves, while Australia, Russia and other countries are rich in resources. Tin reserves are 3.27 million tons and resources are 8.07 million tons. China, Russia, Southeast Asia and other countries and regions are the main producing areas of tin deposits. The global potash (potassium chloride) reserves are 12.9 billion tons and the resources are 43 billion tons. Russia, Canada, Belarus and Turkmenistan account for 80 percent of the world's reserves. Russia has surpassed Canada to become the largest potash reserve country.

From the consumer side, the global consumption of lithium (lithium carbonate) in 2020 is about 400000 tons, cobalt about 170000 tons, nickel about 2.4 million tons, tin about 380000 tons, potash (potassium chloride) about 54 million tons. Compared with the existing reserves, the protection degree of global lithium, nickel and potash resources is higher, while that of cobalt and tin is relatively low.

In the next step, the China Geological Survey of the Ministry of Natural Resources will speed up the establishment and improvement of the global mineral resources reserves data system and evaluation mechanism, plan to complete the dynamic assessment of the world's 40 important mineral resources reserves in five years, and release services in a timely manner. We will actively contribute China's wisdom and strength to the promotion of global mining cooperation and the building of a global mining community with a shared future.

On the same day, the International Mining Research Center of the China Geological Survey also released the Global Mining Development report (2020-2021). The report shows that since the outbreak of the COVID-19 epidemic, the overall global demand for energy resources has shrunk, the structure has been divided, the consumption of energy and bulk minerals has declined, and the consumption of new energy minerals has increased rapidly. In 2020, total global energy consumption fell by 4.5 per cent, the largest decline since World War II; oil, coal and natural gas fell by 9.5 per cent, 3.9 per cent and 2.1 per cent respectively, and renewable energy such as wind power, hydropower and solar energy increased by 9.7 per cent. Iron and aluminum decreased by 0.2% and 0.7% respectively, while copper, lithium and cobalt increased by 6.2%, 15.3% and 7.3%, respectively.

The report shows that the performance of mining companies has generally rebounded since the second half of 2020, and revenue and market capitalization have continued to rise. The combined market capitalization of the world's top 50 mining companies reached 1.47 trillion US dollars, an all-time high. Mining giant comprehensive strength to further enhance, accelerate the layout of copper and lithium, cobalt, nickel and other new energy minerals.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Hak Kobalt Voisey's Bay Ecora Naik 90% YoY pada Semester I seiring Ramp-Up Tambang Bawah Tanah Mendekati Penyelesaian
1 jam yang lalu
Hak Kobalt Voisey's Bay Ecora Naik 90% YoY pada Semester I seiring Ramp-Up Tambang Bawah Tanah Mendekati Penyelesaian
Baca Selengkapnya
Hak Kobalt Voisey's Bay Ecora Naik 90% YoY pada Semester I seiring Ramp-Up Tambang Bawah Tanah Mendekati Penyelesaian
Hak Kobalt Voisey's Bay Ecora Naik 90% YoY pada Semester I seiring Ramp-Up Tambang Bawah Tanah Mendekati Penyelesaian
Menurut hasil interim Ecora Royalties 2026 yang dirilis pada 2 September, perusahaan menerima 266 ton kobalt melalui aliran kobalt Voisey's Bay pada paruh pertama tahun ini, naik sekitar 90% dari 140 ton pada periode yang sama tahun 2025. Ecora menyatakan bahwa peningkatan operasi penambangan bawah tanah di Voisey's Bay kini hampir selesai. Didorong oleh volume kobalt yang lebih tinggi dan harga yang lebih kuat, kontribusi portofolio proyek setelah biaya aliran naik menjadi US$13,5 juta pada paruh pertama, naik 230% dari tahun ke tahun, sementara harga rata-rata kobalt yang direalisasikan meningkat menjadi US$28,4/lb dari US$16,5/lb setahun sebelumnya. Sementara itu, Vale Base Metals sedang mengkaji perluasan kapasitas pemrosesan konsentrator Voisey's Bay dari sekitar 2,8 juta ton per tahun menjadi 3,8 juta ton per tahun. Studi pra-kelayakan terkait masih berlangsung, dengan keputusan investasi akhir ditargetkan sekitar tahun 2028. Proyek ini juga merencanakan pengeboran bawah tanah dan permukaan pada tahun 2026 untuk mengoptimalkan rencana tambang, mendukung perluasan sumber daya, dan berpotensi memperpanjang umur tambang. Ecora juga menyatakan bahwa pemeliharaan terjadwal dijadwalkan di konsentrator Voisey's Bay pada kuartal ketiga dan di kilang Long Harbour pada kuartal keempat.
1 jam yang lalu
Tinjauan Harian SMM: Harga Spot Litium Karbonat Melemah pada 2 September
18 jam yang lalu
Tinjauan Harian SMM: Harga Spot Litium Karbonat Melemah pada 2 September
Baca Selengkapnya
Tinjauan Harian SMM: Harga Spot Litium Karbonat Melemah pada 2 September
Tinjauan Harian SMM: Harga Spot Litium Karbonat Melemah pada 2 September
Hari ini, harga spot baterai lithium karbonat SMM bergerak lebih rendah dibandingkan hari perdagangan sebelumnya. Kontrak lithium karbonat 2701 dibuka lebih rendah di 157.000 yuan/mt hari ini, kemudian berfluktuasi melemah setelah pembukaan. Pada sesi pagi, diperdagangkan lemah di kisaran 156.000-157.000 yuan, dengan tertinggi intraday 157.800 yuan/mt. Menjelang tengah hari, harga turun cepat ke 153.200 yuan/mt, mencapai titik terendah intraday baru. Sekitar tengah hari, harga bergerak naik turun berulang kali di kisaran 154.000-156.000 yuan. Pada sesi sore, pembeli sempat mendorong harga naik tetapi gagal menembus garis harga rata-rata. Harga melemah lagi di akhir perdagangan, akhirnya ditutup turun 3,2% di 154.800 yuan/mt, dengan open interest turun 9.123 lot. Di pasar spot, pembeli hilir melakukan pembelian saat harga turun sesuai kebutuhan. Pada level 155.000 yuan/mt ke bawah, minat beli pesanan spot dari hilir terus pulih. Di sisi pasokan, seiring harga yang bergerak lebih rendah, minat menjual pesanan spot tetap lemah, dengan beberapa pabrik kimia lithium menahan harga dan menahan penjualan. Secara keseluruhan, permintaan pasar dan transaksi aktual relatif aktif.
18 jam yang lalu
[SMM Kilat] Albemarle Selesaikan Lelang Konsentrat Spodumene Wodgina pada US$2.307/dmt CIF Tiongkok
20 jam yang lalu
[SMM Kilat] Albemarle Selesaikan Lelang Konsentrat Spodumene Wodgina pada US$2.307/dmt CIF Tiongkok
Baca Selengkapnya
[SMM Kilat] Albemarle Selesaikan Lelang Konsentrat Spodumene Wodgina pada US$2.307/dmt CIF Tiongkok
[SMM Kilat] Albemarle Selesaikan Lelang Konsentrat Spodumene Wodgina pada US$2.307/dmt CIF Tiongkok
SMM 2 September: Albemarle menyelesaikan putaran lelang baru untuk konsentrat spodumene dari operasi Wodgina hari ini. Volume tender adalah 15.840 ton metrik kering, dengan toleransi kuantitas ±10%. Harga transaksi akhir dilaporkan sebesar US$2.307/dmt CIF Tiongkok, dinormalisasi ke Li₂O 6%. Kargo dihargai berdasarkan CIF Pelabuhan Zhenjiang, Tiongkok, tidak termasuk PPN. Ketentuan pembayaran adalah uang muka tunai, dengan pembayaran harus diterima paling lambat 8 September.
20 jam yang lalu
Global mineral resources reserves: lithium ore 128 million tons cobalt ore 6.68 million tons nickel ore 90.63 million tons - Shanghai Metals Market (SMM)