Qujing German Nano-scale Lithium Iron Phosphate Project with an annual production capacity of 40,000 tons has been officially put into production.

Telah Terbit: Jul 6, 2021 09:40
[Qujing Defang Nano Lithium Iron Phosphate Project with an annual production capacity of 40,000 tons] on July 5, Qujing DeFang Nano Technology Co., Ltd. ushered in the date of commissioning of the project with an annual production capacity of 40,000 tons of Nano Lithium Iron Phosphate. The project started on January 5, 2021 and lasted for 6 months, and was put into production on July 5, 2021. After it was put into production, the project has the capacity to produce 40,000 tons of nanometer lithium iron phosphate per year.

On July 5, Qujing German Nanotechnology Co., Ltd. ushered in the production date of the project with an annual production capacity of 40,000 tons of nanometer lithium iron phosphate. Kong Lingyong, chairman and general manager of German Nano, together with German Nano executives and representatives of excellent suppliers, attended the production ceremony.

The project started on January 5, 2021 and lasted for 6 months, and was put into production on July 5, 2021. After it was put into production, the project has the capacity to produce 40,000 tons of nanometer lithium iron phosphate per year. This is another major strategic measure taken by Germany Nano to thoroughly implement the country's 14th five-year Plan, further speed up the development of clean energy and new energy, and promote the large-scale and standardized development of nanometer lithium iron phosphate. At the same time, thousands of local jobs can be provided.

Yang Haixiang, deputy general manager of the German Nano Infrastructure Center, said in a speech that today's commissioning ceremony marks the smooth transition of the project from the construction period to the production period, and the next step is that the infrastructure center will work with the production center to solve various problems encountered in the process of reaching production and maximize capacity in July. At the same time, we will also sum up the experience, standardize and standardize the good experience, train a capital construction team that can fight as soon as we are called, and win the war, and conquer the German era projects one by one, and make unremitting efforts to advance towards the company's annual production capacity.

Ma Libo, deputy secretary of the party committee and chairman of Yunnan Sijian, said that since the start of construction, CCIC 4 has strictly implemented the goal of "four guarantees, one control and one tree," set up a strong project team, and invested a lot of manpower and material resources. high-quality and efficient completion of the time-tight and heavy task of six months of production and construction. At the same time, we hope to take this project as an opportunity to promote the wider and deeper cooperation between Qujing German Nanotechnology Co., Ltd. and CCIV.

At the commissioning ceremony, Kong Lingyong, chairman and general manager of German Nano, expressed heartfelt thanks to the leaders and guests who cared about, paid attention to, supported and helped the development of German Nano, as well as the construction units, equipment and material suppliers that provided support during the construction of the project. At the same time, it is pointed out that qu Jingde is of great significance for the whole group to increase production capacity and enhance differential competitive advantage. today's formal commissioning has opened a new chapter in the development of German nanoscale, and the production capacity of German nanotechnology has been further enhanced. In the future, it is hoped that every employee of German Nano will show a practical attitude of "scratching iron and leaving imprints", create achievements in practical work, continue to fight, be cautious, and strive to reach a first-class standard in all kinds of work. Qujing Germany will be built into a benchmarking factory area of the whole group.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Tinjauan Mingguan Pasar Sel Baterai Penyimpanan Energi 9.3] Pasokan foil tembaga yang ketat membatasi jadwal produksi September, harga sel baterai penyimpanan energi tetap stabil
35 menit yang lalu
[SMM Tinjauan Mingguan Pasar Sel Baterai Penyimpanan Energi 9.3] Pasokan foil tembaga yang ketat membatasi jadwal produksi September, harga sel baterai penyimpanan energi tetap stabil
Baca Selengkapnya
[SMM Tinjauan Mingguan Pasar Sel Baterai Penyimpanan Energi 9.3] Pasokan foil tembaga yang ketat membatasi jadwal produksi September, harga sel baterai penyimpanan energi tetap stabil
[SMM Tinjauan Mingguan Pasar Sel Baterai Penyimpanan Energi 9.3] Pasokan foil tembaga yang ketat membatasi jadwal produksi September, harga sel baterai penyimpanan energi tetap stabil
[SMM Analysis] Terdampak oleh pasokan copper foil yang ketat dan peningkatan kapasitas sel baterai berkapasitas besar yang lebih lambat dari perkiraan, pertumbuhan produksi sel baterai penyimpanan energi di Tiongkok dan global pada bulan September diperkirakan melambat masing-masing menjadi 4,09% dan 4,25% MoM, tetapi hal ini tidak menunjukkan melemahnya permintaan pengguna akhir. Kondisi pasokan-permintaan untuk sel baterai penyimpanan energi tetap ketat, dengan harga sel baterai 314Ah bertahan stabil. Pengiriman diperkirakan akan meningkat secara stabil ke depannya, dengan harga melanjutkan tren stabil hingga lebih tinggi.
35 menit yang lalu
Ketua CATL: Penjualan NEV Tiongkok Melampaui 7,4 Juta pada Semester I, Menekankan Presisi dalam Produksi Baterai
1 jam yang lalu
Ketua CATL: Penjualan NEV Tiongkok Melampaui 7,4 Juta pada Semester I, Menekankan Presisi dalam Produksi Baterai
Baca Selengkapnya
Ketua CATL: Penjualan NEV Tiongkok Melampaui 7,4 Juta pada Semester I, Menekankan Presisi dalam Produksi Baterai
Ketua CATL: Penjualan NEV Tiongkok Melampaui 7,4 Juta pada Semester I, Menekankan Presisi dalam Produksi Baterai
Ketua CATL Zeng Yuqun, dalam pidato video untuk Konferensi Baterai Daya Dunia 2026, mengatakan bahwa pada paruh pertama tahun ini, penjualan kendaraan energi baru (NEV) Tiongkok melampaui 7,4 juta unit, dengan lebih dari 600 model baru diluncurkan, rata-rata hampir tiga model per hari. Semua pihak bersaing dalam kecepatan, spesifikasi, dan harga, sehingga siklus pengembangan semakin pendek. Ia mencatat bahwa baterai daya menuntut presisi yang sangat tinggi dan memiliki toleransi kesalahan yang sangat rendah. Dalam produksi massal, semua masalah kecil akan berlipat ganda berkali-kali, sehingga setiap proses dan setiap parameter harus dikontrol secara ketat sejak tahap desain, anomali harus diidentifikasi lebih awal, dan tidak boleh ada toleransi terhadap masalah kualitas.
1 jam yang lalu
Tinjauan Mingguan Pasar Litium Karbonat: 8.31-9.3 harga spot litium karbonat naik lalu turun, tren keseluruhan menurun [Tinjauan Mingguan SMM]
1 jam yang lalu
Tinjauan Mingguan Pasar Litium Karbonat: 8.31-9.3 harga spot litium karbonat naik lalu turun, tren keseluruhan menurun [Tinjauan Mingguan SMM]
Baca Selengkapnya
Tinjauan Mingguan Pasar Litium Karbonat: 8.31-9.3 harga spot litium karbonat naik lalu turun, tren keseluruhan menurun [Tinjauan Mingguan SMM]
Tinjauan Mingguan Pasar Litium Karbonat: 8.31-9.3 harga spot litium karbonat naik lalu turun, tren keseluruhan menurun [Tinjauan Mingguan SMM]
1 jam yang lalu
Qujing German Nano-scale Lithium Iron Phosphate Project with an annual production capacity of 40,000 tons has been officially put into production. - Shanghai Metals Market (SMM)