Dressing plants in Dai County shut down on mine accident and the 100th Anniversary of the founding of CPC

Telah Terbit: Jun 29, 2021 09:58 (GMT+8)
The Daixian County Bureau of Industry and Information Technology issued a notice on June 23 that would cut off power for 84 dressing plants, 83 iron ore fines processing plants, and 19 metallurgical industry and trade enterprises.

SHANGHAI, Jun 29 (SMM) — The Daixian County Bureau of Industry and Information Technology issued a notice on June 23 that would cut off power for 84 dressing plants, 83 iron ore fines processing plants, and 19 metallurgical industry and trade enterprises.

According to SMM survey, iron ore dressing plants in Daixian County, including state-owned ones, have received notice and halted production. There is only one state-owned iron ore enterprise in Dai County, which is an integrated enterprise of mine-concentrator's pellet plant. The open-pit mine was unaffected when other mines in the county shut down in the wake of a mine accident, but the open-pit mine has already suspended production. Its dressing plant and pellet plant have also closed due to the power outage, prompting this company to undertake annual maintenance ahead of schedule.

According to SMM estimate, the production of iron ore concentrates in Daixian County was 10.14 million mt in 2020. Driven by high profit, iron ore concentrate production from January to May this year was higher than the same period last year. However, all underground mines ceased production following the accident at the Dahongcai iron ore mine on June 10. A few dressing plants reported lower output of iron ore concentrate due to ROM shortfall. All dressing plants in the county have shut down by June 24. Hence, it is expected that the output of iron ore concentrates in the county will drop from 903,000 mt to 688,000 mt in June.

Local mines said that it is unclear when power supply will restore. Some expect power supply to restore on July 10, while others believe that power supply will not return to normal until the end of July. However, even if power supply is restored, dressing plants are unable to maintain normal production if mines remain closed. This is because many dressing plants are about to run out of ROM.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Proyek AS Senilai $7,4 Miliar Korea Zinc Lolos Kajian Lingkungan, Siap Uji Coba Operasi 2029
2 jam yang lalu
Proyek AS Senilai $7,4 Miliar Korea Zinc Lolos Kajian Lingkungan, Siap Uji Coba Operasi 2029
Baca Selengkapnya
Proyek AS Senilai $7,4 Miliar Korea Zinc Lolos Kajian Lingkungan, Siap Uji Coba Operasi 2029
Proyek AS Senilai $7,4 Miliar Korea Zinc Lolos Kajian Lingkungan, Siap Uji Coba Operasi 2029
Pada 21 September, Korea Zinc mengumumkan bahwa proyek manufakturnya di AS senilai 7,4 miliar dolar AS telah lolos kajian dampak lingkungan. Fasilitas tersebut dijadwalkan memulai uji coba operasi pada 2029 dan produksi komersial pada tahun berikutnya, memproduksi 11 mineral penting, 12 logam non-besi, dan asam sulfat tingkat semikonduktor. Pada April, Korea Zinc menyatakan telah menyelesaikan akuisisi pabrik peleburan seng lokal dan perusahaan terkait lainnya. Perusahaan berencana melaksanakan proyek tersebut dengan memperluas dan meningkatkan fasilitas yang ada.
2 jam yang lalu
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
11 Sep 2026 18:30 (GMT+8)
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
Baca Selengkapnya
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
Pada 9 September 2026, Australia memulai peninjauan sunset kedua atas tindakan antidumping terhadap baja lembaran galvanis dari India, Malaysia, dan Vietnam, serta secara terpisah meluncurkan peninjauan sunset atas tindakan imbalan terhadap impor dari India. Peninjauan ini mencakup periode Juli 2025–Juni 2026, dengan laporan akhir diperkirakan pada 11 Februari 2027. Karena baja galvanis merupakan sektor penggunaan akhir terbesar untuk seng, tindakan ini secara langsung memengaruhi biaya ekspor dan daya saing, yang berpotensi berdampak pada permintaan seng domestik dan rantai pasok Australia. Mempertahankan bea masuk akan memberikan perlindungan bagi kapasitas baja dan pelapisan domestik, sementara penghentian dapat meningkatkan impor berharga murah dan memengaruhi konsumsi seng regional. Hasil akhir tetap bergantung pada penetapan otoritas.
11 Sep 2026 18:30 (GMT+8)
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
07 Sep 2026 15:43 (GMT+8)
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Baca Selengkapnya
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Proyek perluasan katoda tembaga 300.000 ton/tahun milik JCC Hongyuan Copper, anak perusahaan Jiangxi Copper Corporation, memasuki tahap pengumuman publik pra-persetujuan penilaian dampak lingkungan pada 4 September, dengan total investasi sekitar 1,416 miliar yuan. Proyek ini direncanakan mulai dibangun pada September 2026 dan selesai pada Desember 2027. Setelah selesai, total kapasitas JCC Hongyuan akan melonjak dari 250.000 ton menjadi 550.000 ton.
07 Sep 2026 15:43 (GMT+8)