The largest IPO in the power industry! New energy power giant listed wind power & photovoltaic ushered in rapid development

Telah Terbit: Jun 25, 2021 14:20 (GMT+8)

On June 10, 2021, the largest IPO in the power industry, three Gorges Energy, was listed. The IPO issued 8.571 billion new shares at a price of 2.65 yuan per share, with a total fund-raising amount of 22.71315 billion yuan. After deducting the issuance expenses, the net amount raised was 22.49963 billion yuan, the post-issue EPS was 0.0918 yuan, and the BPS was 2.2270 yuan. On the first day of listing, three Gorges Energy rose 44%, and rose continuously for the next few days, falling back after reaching a high on June 24.

It is reported that the main business of the three Gorges Energy is the development, investment and operation of wind and solar energy. According to the company's prospectus, the installed scale of the company's power generation projects has increased rapidly from 143000 kilowatts at the end of 2008 to 11.898 million kilowatts at the end of September 2020, with an average compound annual growth rate of 45.69 percent. As of September 30, 2020, the installed capacity of the power generation project controlled by the company is 11.898 million kilowatts. With the commissioning of the project under construction, the installed scale of the company will be further increased. Specifically:

In terms of offshore wind power business, as of September 30, 2020, the company's offshore wind power project has been put into operation with a scale of 1.04 million kilowatts, the scale under construction is 2.93 million kilowatts, and the approved scale to be built is 5.3 million kilowatts, which is in the forefront of the industry. By the end of 2020, the company expects to put into production and install offshore wind power under construction to reach 4.27 million kilowatts. After all these projects are put into production, it is estimated that the annual generating capacity will reach 12.1 billion kilowatt-hours.

In terms of onshore wind power business, by the end of September 2020, the three Gorges new energy project has been put into production in 22 provinces and regions, including Inner Mongolia, Xinjiang, Yunnan and so on. Among them, Siziwang Banner in Inner Mongolia has built the largest land wind power project in China and even in Asia (400000 kilowatts). The completion of the project plays a positive role in promoting the large-scale development and management of onshore wind power. The first high-altitude megawatt wind power project has been built in Xitieshan, Qinghai, which plays a positive role in demonstrating and promoting the utilization of wind energy resources in high-altitude areas of China.

In terms of photovoltaic business, by the end of September 2020, the three Gorges new energy projects have been put into production in 18 provinces and regions, including Gansu, Qinghai and Hebei. Among them, the surface floating photovoltaic project in the world's largest coal mining subsidence area (150000 kilowatts) was built in Huainan, Anhui Province, and the largest mountain photovoltaic project in China (200000 kilowatts) was built in Quyang, Hebei Province. the first large-scale low-price grid photovoltaic demonstration project was built in Golmud, Qinghai (500000 kilowatts).

The market capitalization of three Gorges Energy, the largest IPO, in the power industry, exceeded 100 billion on the first day of listing. Northeast Securities pointed out that the company is the main body of the new energy strategy of the three Gorges Group, the largest clean energy group in China, and one of the large new energy operators that are scarce in the A-share market. This IPO is the largest IPO, fund-raising in the history of China's power industry, with a fund-raising amount of more than 22.7 billion yuan. The company's shares rose 44.15% on the first day of listing, hitting the daily limit, with a total market capitalization of 109.1 billion yuan, surpassing Longyuan Electric Power to become the listed company with the highest market capitalization of A-shares and H-shares.

At present, under the background of carbon neutralization, the power plate may become the largest innovation plate, while wind power and photovoltaic are bound to usher in rapid development. Soochow Securities pointed out that electrification is the core of carbon neutralization, while wind power and photovoltaic are highly expected in renewable energy generation. At present, electric energy is the lowest cost and most mature technology path to achieve carbon neutralization, through the improvement of the electric level of terminal energy use sectors such as transportation (popularization of electric vehicles), industry (artificial intelligence) and building (building intelligence). Traditional electricity replaces the use of fossil energy such as coal and oil. Compared with the global industrial carbon emission structure, China's share of power generation and heating industry and industrial production is significantly higher than the global level, which also reflects China's high energy consumption and extensive economic structure development model in the past. we expect the power generation and manufacturing industry with the highest carbon emissions in the carbon neutralization process to usher in the greatest innovation.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
DRC Coltan in 2025: What Production and Export Data Reveal
7 menit yang lalu
DRC Coltan in 2025: What Production and Export Data Reveal
Baca Selengkapnya
DRC Coltan in 2025: What Production and Export Data Reveal
DRC Coltan in 2025: What Production and Export Data Reveal
The Democratic Republic of the Congo remains the world’s leading tantalum producer. The harmonised 2025 statistics used for this analysis report 1,434.17 tonnes of coltan, with 88.1% attributed to artisanal mining. They also reveal a supply chain concentrated in a few provinces and firms, wide export unit-value differences and official totals that do not fully agree. The central issue is therefore not only how much Congo produces, but how well each tonne is recorded from mine to export.
7 menit yang lalu
[SMM Flash Kromium] Ancaman Blokade Odisha atas Undang-Undang Pertambangan Membahayakan Pusat Kromit India
2 jam yang lalu
[SMM Flash Kromium] Ancaman Blokade Odisha atas Undang-Undang Pertambangan Membahayakan Pusat Kromit India
Baca Selengkapnya
[SMM Flash Kromium] Ancaman Blokade Odisha atas Undang-Undang Pertambangan Membahayakan Pusat Kromit India
[SMM Flash Kromium] Ancaman Blokade Odisha atas Undang-Undang Pertambangan Membahayakan Pusat Kromit India
Negara bagian Odisha di India, produsen mineral terbesar di negara itu dan sumber utama bijih kromit, menghadapi potensi gangguan transportasi mineral setelah partai-partai oposisi mengumumkan rencana blokade ekonomi sebagai respons terhadap Undang-Undang Amandemen Mines and Minerals (Development and Regulation) (MMDR) 2026. Biju Janata Dal (BJD), partai oposisi utama di Odisha, menggelar demonstrasi publik di Bhubaneswar pada 28 September dan menyatakan akan meluncurkan kampanye tingkat distrik, yang kemudian diikuti blokade ekonomi untuk menghentikan transportasi mineral, jika undang-undang hasil amandemen tersebut tidak dicabut. Partai Kongres secara terpisah mengumumkan blokade ekonomi selama tujuh hari dan penutupan seluruh negara bagian yang direncanakan setelah festival Dussehra, serta menyerukan agar penambangan, ekstraksi, dan transportasi mineral dihentikan selama periode tersebut. Pokok persoalannya adalah pembagian kewenangan perpajakan atas hak mineral antara pemerintah negara bagian dan pemerintah pusat. Menyusul putusan Mahkamah Agung pada 2024 yang menegaskan kewenangan negara bagian untuk mengenakan pajak atas hak mineral dan lahan yang mengandung mineral, dengan kewajiban terkait dibayarkan secara cicilan mulai April 2026, partai-partai oposisi Odisha menyatakan bahwa UU MMDR yang baru diamandemen mengubah kerangka yang diharapkan tersebut dan dapat mengurangi penerimaan pajak negara bagian terkait mineral. Seorang legislator BJD memperkirakan negara bagian dapat kehilangan sekitar ₹12.000 crore per tahun dari pendapatan terkait mineral, dengan potensi kekurangan tambahan yang melebihi ₹1 triliun dari kewajiban yang sebelumnya diharapkan dapat dipulihkan negara bagian. Pendapatan mineral Odisha mencapai ₹51.127 crore pada tahun fiskal 2025-26, setara sekitar 75–80% dari pendapatan asli daerah nonpajak, dibandingkan target 2026-27 sekitar ₹53.000 crore. Bagi pasar kromium, relevansinya terletak pada posisi Odisha sebagai negara bagian penghasil kromit dominan di India. Menurut Direktorat Pertambangan negara bagian, Odisha memproduksi 474,17 juta mt mineral pada 2024-25, sekitar 43,7% dari total produksi mineral utama India, termasuk 3,19 juta mt kromit. Lembah Sukinda di negara bagian tersebut menampung porsi signifikan cadangan kromit India dan menjadi lokasi tambang bijih krom milik sendiri Indian Metals & Ferro Alloys (IMFA) serta operasi peleburan ferokrom di Therubali, Choudwar, dan Kalinganagar, lokasi ekspansi kapasitas IMFA yang sedang berlangsung. Jika blokade yang diancamkan benar-benar terjadi dan meluas hingga transportasi mineral sebagaimana diumumkan, pergerakan bijih krom dan produksi ferokrom di Odisha dapat terganggu, menambah sumber baru ketidakpastian sisi pasokan bagi sektor ferokrom India pada saat kapasitas domestik sedang aktif bertambah. Belum ada tanggal yang dikonfirmasi mengenai kapan blokade, jika dilaksanakan, akan dimulai selain kerangka waktu pasca-Dussehra yang dirujuk oleh Partai Kongres
2 jam yang lalu
[Kilas | Centinela Antofagasta Terancam Mogok Akibat Sengketa Buruh]
3 jam yang lalu
[Kilas | Centinela Antofagasta Terancam Mogok Akibat Sengketa Buruh]
Baca Selengkapnya
[Kilas | Centinela Antofagasta Terancam Mogok Akibat Sengketa Buruh]
[Kilas | Centinela Antofagasta Terancam Mogok Akibat Sengketa Buruh]
Baru-baru ini, Centinela, tambang inti Antofagasta, menghadapi tantangan ketenagakerjaan yang berat. Pada 28 September, serikat pekerja Minera Esperanza dan Distrito Centinela memberikan suara 98,73% mendukung mogok kerja terkait kesenjangan kompensasi, menolak tawaran kontrak manajemen. Sebagai sumber molibdenum terkait yang penting, produksi molibdenum Centinela pada H1 2026 turun sekitar 17,6% year-on-year menjadi 1.400 ton. Pemungutan suara mogok ini mengancam stabilitas pasokan lebih lanjut. Meskipun produksi tetap berlanjut sambil menunggu hasil mediasi, dampak potensial terhadap operasi dan kemajuan proyek jangka panjang memerlukan pemantauan ketat.
3 jam yang lalu