Capacity replacement measures for ferrous industry to be in place from June 1

Telah Terbit: May 10, 2021 08:00
The Ministry of Industry and Information Technology issued the revised "Implementation Measures for Capacity Replacement in the Iron and Steel Industry” on May 6, which will come into force on June 1, 2021.

SHANGHAI, May 10 (SMM) — The Ministry of Industry and Information Technology issued the revised "Implementation Measures for Capacity Replacement in the Iron and Steel Industry” on May 6, which will come into force on June 1, 2021.

What type of capacity can be used for replacement?

The provincial people's governments and the State-owned Assets Supervision and Administration Commission of the State Council reported to the State Council the implementation plan of capacity reduction in 2016, which listed the list of smelting equipment and corresponding capacity of existing steel enterprises in the region. The production capacity in the filing list and the legally compliant production capacity built in 2016 and later can be used for replacement, and the production capacity not in the filing list shall not be used for replacement. At the same time, for the capacity range that cannot be used for replacement, based on the original "1 required, 6 not allowed" (that is, the smelting equipment used for capacity replacement must be in the filing list, and six types of situations cannot be used for replacement), "unreorganised or unliquidated 'zombie company' production capacity" and "ferroalloy production capacity" are included in the capacity range that cannot be used for replacement.

What must the capacity replacement plan include?

Firstly, the public announcement of supporting facilities has been added, that is, the model, quantity and production capacity of pre treatment and refining facilities must be publicized and announced together for construction projects. Refining facilities include supporting de-phosphorization and desulfurization pre treatment equipment, LF furnace, RH furnace, etc. The second plan is to fully retain the exit project information including the area where the exit project is located, the name of the company, the model, quantity and capacity of the smelting equipment exited, as well as the dismantling schedule, etc. When it involves cross-provincial (regional, municipal) capacity replacement, a capacity transfer announcement must be attached. The third plan is to increase the requirement that "the same smelting equipment shall not be split and sold in principle". If it is necessary to split, the reason for the split must be clarified, and no more than two transferees must be made. At the same time, the information of all capacity transferees should be clarified in the capacity transfer announcement and capacity replacement announcement. It is necessary to explain the reason for the temporarily unclear capacity of the transferee.

How to connect the commissioning of new projects and the withdrawal of replacement capacity?

In order to ensure that capacity replacement does not add new steel production capacity, the Measures continue to insist that “the transferor must remove the exit equipment for replacement before the construction project is put into production, and make it unsuitable for resuming production”. At the same time, for the "one furnace with multiple enterprises" situation, it is clear that the time for the construction project to be put into operation is subject to the time of the first completed and put into operation, and the corresponding equipment must be dismantled in place as required.

What are the requirements for capacity replacement?

It is strictly forbidden to increase the total steel production capacity in key areas for the prevention and control of air pollution. Provinces (autonomous regions, municipalities) that have not completed the total steel production capacity control target shall not accept the steel production capacity transferred from other regions. The Yangtze River Economic Belt region prohibits new or expanded steel smelting projects outside the compliance zone.

The replacement ratio in key areas for air pollution prevention and control shall not be less than 1.5:1, and the replacement ratio in other areas shall not be less than 1.25:1. In order to encourage corporate mergers and reorganisations and increase industry concentration, the replacement ratio in key areas for pollution prevention and control can be no less than 1.25:1, and replacement in other areas can be no less than 1.1:1 when the compliant production capacity obtained after the completion of substantive mergers and reorganisations (realising actual holdings and completing legal or legal person affiliation, equity relationships, articles of association, etc.) is used for project construction.

For more information on the China steel scrap and EAF sector please subscribe to China Steel Scrap and EAF Monthly.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Baja] Pasar Baja Domestik India Sepi karena Libur Janmashtami
1 jam yang lalu
[SMM Baja] Pasar Baja Domestik India Sepi karena Libur Janmashtami
Baca Selengkapnya
[SMM Baja] Pasar Baja Domestik India Sepi karena Libur Janmashtami
[SMM Baja] Pasar Baja Domestik India Sepi karena Libur Janmashtami
[India Domestik] Pasar baja domestik India sebagian besar tetap sepi pada hari Jumat karena festival Janmashtami membuat sebagian besar pelaku pasar tidak aktif, dengan aktivitas perdagangan terbatas dan harga sebagian besar tetap stabil. Billet Mandi Gobindgarh datar di 492,14 USD/ton (46.500 INR/ton) delivered Mandi. Billet Raipur turun 4,23 USD/ton (400 INR/ton) menjadi 444,52 USD/ton (42.000 INR/ton) EXW Raipur. Harga rebar naik 1,05 USD/ton (100 INR/ton) menjadi 530,24 USD/ton (50.100 INR/ton) EXW Mumbai. Ingot Mandi tidak berubah di 492,17 USD/ton (46.500 INR/ton) EXW Mandi. Besi spons PDRI tidak berubah di 315,41 USD/ton (29.800 INR/ton) EXW Bellary. Harga besi spons PDRI turun 3,17 USD/ton (300 INR/ton) menjadi 309,06 USD/ton (29.200 INR/ton) EXW Raipur. Harga scrap lebur datar di 388,43 USD/ton (36.700 INR/ton) ex-yard Alang.
1 jam yang lalu
[SMM Tinjauan Mingguan Pasar Domestik India] Pasar Baja Domestik Tetap Campuran di Tengah Pembelian yang Hati-hati
1 jam yang lalu
[SMM Tinjauan Mingguan Pasar Domestik India] Pasar Baja Domestik Tetap Campuran di Tengah Pembelian yang Hati-hati
Baca Selengkapnya
[SMM Tinjauan Mingguan Pasar Domestik India] Pasar Baja Domestik Tetap Campuran di Tengah Pembelian yang Hati-hati
[SMM Tinjauan Mingguan Pasar Domestik India] Pasar Baja Domestik Tetap Campuran di Tengah Pembelian yang Hati-hati
Pasar baja domestik India tetap beragam selama sepekan (31 Agustus–4 September), dengan harga menunjukkan pergerakan naik dan turun pada baja setengah jadi maupun baja jadi. Secara keseluruhan, aktivitas pembeli tetap berhati-hati dan berdasarkan kebutuhan dengan permintaan yang moderat. Billet Mandi Gobindgarh naik 1,05 USD/ton (100 INR/ton) menjadi 492,14 USD/ton (46.500 INR/ton) delivered Mandi. Billet Raipur turun 9,52 USD/ton (900 INR/ton) menjadi 444,52 USD/ton (42.000 INR/ton) EXW Raipur. Harga rebar naik 5,29 USD/ton (500 INR/ton) menjadi 530,24 USD/ton (50.100 INR/ton) EXW Mumbai. Rebar Durgapur turun 10,58 USD/ton (1.000 INR/ton) menjadi 478,38 USD/ton (45.200 INR/ton) EXW Durgapur. Ingot Mandi naik 1,05 USD/ton (100 INR/ton) menjadi 492,17 USD/ton (46.500 INR/ton) EXW Mandi. Harga sponge iron PDRI naik 6,35 USD/ton (600 INR/ton) menjadi 315,41 USD/ton (29.800 INR/ton) EXW Bellary. Harga sponge iron PDRI turun 5,29 USD/ton (500 INR/ton) menjadi 309,06 USD/ton (29.200 INR/ton) EXW Raipur. Harga scrap lebur naik 6,35 USD/ton (600 INR/ton) menjadi 388,43 USD/ton (36.700 INR/ton) ex-yard Alang. 8Ani (12mm) tidak berubah di 445 USD/ton (42.100 INR/ton) ex-yard Alang. HMS 1&2 (80:20) naik 1,05 USD/ton (100 INR/ton) menjadi 401,13 USD/ton (37.900 INR/ton) delivered Mandi.
1 jam yang lalu
Dukungan Biaya dan Kekhawatiran Tersembunyi Hadir Bersamaan; Logam Besi Mungkin Terus Berkonsolidasi dengan Catatan Kuat Minggu Depan [Laporan Mingguan Rantai Industri Baja SMM]
2 jam yang lalu
Dukungan Biaya dan Kekhawatiran Tersembunyi Hadir Bersamaan; Logam Besi Mungkin Terus Berkonsolidasi dengan Catatan Kuat Minggu Depan [Laporan Mingguan Rantai Industri Baja SMM]
Baca Selengkapnya
Dukungan Biaya dan Kekhawatiran Tersembunyi Hadir Bersamaan; Logam Besi Mungkin Terus Berkonsolidasi dengan Catatan Kuat Minggu Depan [Laporan Mingguan Rantai Industri Baja SMM]
Dukungan Biaya dan Kekhawatiran Tersembunyi Hadir Bersamaan; Logam Besi Mungkin Terus Berkonsolidasi dengan Catatan Kuat Minggu Depan [Laporan Mingguan Rantai Industri Baja SMM]
Pekan ini, logam besi sebagian besar menunjukkan tren naik lalu turun, namun tetap mencatat kenaikan bulanan tertentu pada akhirnya, dengan batu bara kokas dan kokas memimpin kenaikan dan baja jadi mengikuti lebih tinggi. Pendorong utama reli ini adalah resonansi dari beberapa faktor bullish: pertama, gangguan sisi pasokan pada batu bara kokas mendominasi, karena pemulihan produksi Shanxi jauh di bawah ekspektasi dan pasokan tetap ketat, dengan tambang menahan penjualan dan lelang ditutup pada premi tinggi, dengan cepat mewujudkan logika dorongan biaya; kedua, dukungan biaya naik bertahap, karena kenaikan harga kokas putaran keempat diterapkan pada 3 September, bijih besi kasar mengalami pengurangan stok selama dua minggu berturut-turut, dan berita penangguhan tambang Minas mengganggu pasokan, mendorong harga bijih besi lebih tinggi. Ditambah dengan logam panas yang pulih ke rata-rata harian 2,408 juta ton, dukungan sisi permintaan untuk bahan baku tetap utuh......
2 jam yang lalu
Capacity replacement measures for ferrous industry to be in place from June 1 - Shanghai Metals Market (SMM)