Capacity replacement measures for ferrous industry to be in place from June 1

Telah Terbit: May 10, 2021 08:00 (GMT+8)
The Ministry of Industry and Information Technology issued the revised "Implementation Measures for Capacity Replacement in the Iron and Steel Industry” on May 6, which will come into force on June 1, 2021.

SHANGHAI, May 10 (SMM) — The Ministry of Industry and Information Technology issued the revised "Implementation Measures for Capacity Replacement in the Iron and Steel Industry” on May 6, which will come into force on June 1, 2021.

What type of capacity can be used for replacement?

The provincial people's governments and the State-owned Assets Supervision and Administration Commission of the State Council reported to the State Council the implementation plan of capacity reduction in 2016, which listed the list of smelting equipment and corresponding capacity of existing steel enterprises in the region. The production capacity in the filing list and the legally compliant production capacity built in 2016 and later can be used for replacement, and the production capacity not in the filing list shall not be used for replacement. At the same time, for the capacity range that cannot be used for replacement, based on the original "1 required, 6 not allowed" (that is, the smelting equipment used for capacity replacement must be in the filing list, and six types of situations cannot be used for replacement), "unreorganised or unliquidated 'zombie company' production capacity" and "ferroalloy production capacity" are included in the capacity range that cannot be used for replacement.

What must the capacity replacement plan include?

Firstly, the public announcement of supporting facilities has been added, that is, the model, quantity and production capacity of pre treatment and refining facilities must be publicized and announced together for construction projects. Refining facilities include supporting de-phosphorization and desulfurization pre treatment equipment, LF furnace, RH furnace, etc. The second plan is to fully retain the exit project information including the area where the exit project is located, the name of the company, the model, quantity and capacity of the smelting equipment exited, as well as the dismantling schedule, etc. When it involves cross-provincial (regional, municipal) capacity replacement, a capacity transfer announcement must be attached. The third plan is to increase the requirement that "the same smelting equipment shall not be split and sold in principle". If it is necessary to split, the reason for the split must be clarified, and no more than two transferees must be made. At the same time, the information of all capacity transferees should be clarified in the capacity transfer announcement and capacity replacement announcement. It is necessary to explain the reason for the temporarily unclear capacity of the transferee.

How to connect the commissioning of new projects and the withdrawal of replacement capacity?

In order to ensure that capacity replacement does not add new steel production capacity, the Measures continue to insist that “the transferor must remove the exit equipment for replacement before the construction project is put into production, and make it unsuitable for resuming production”. At the same time, for the "one furnace with multiple enterprises" situation, it is clear that the time for the construction project to be put into operation is subject to the time of the first completed and put into operation, and the corresponding equipment must be dismantled in place as required.

What are the requirements for capacity replacement?

It is strictly forbidden to increase the total steel production capacity in key areas for the prevention and control of air pollution. Provinces (autonomous regions, municipalities) that have not completed the total steel production capacity control target shall not accept the steel production capacity transferred from other regions. The Yangtze River Economic Belt region prohibits new or expanded steel smelting projects outside the compliance zone.

The replacement ratio in key areas for air pollution prevention and control shall not be less than 1.5:1, and the replacement ratio in other areas shall not be less than 1.25:1. In order to encourage corporate mergers and reorganisations and increase industry concentration, the replacement ratio in key areas for pollution prevention and control can be no less than 1.25:1, and replacement in other areas can be no less than 1.1:1 when the compliant production capacity obtained after the completion of substantive mergers and reorganisations (realising actual holdings and completing legal or legal person affiliation, equity relationships, articles of association, etc.) is used for project construction.

For more information on the China steel scrap and EAF sector please subscribe to China Steel Scrap and EAF Monthly.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Baja] Harga Baja Domestik India Melemah karena Permintaan Lesu
10 jam yang lalu
[SMM Baja] Harga Baja Domestik India Melemah karena Permintaan Lesu
Baca Selengkapnya
[SMM Baja] Harga Baja Domestik India Melemah karena Permintaan Lesu
[SMM Baja] Harga Baja Domestik India Melemah karena Permintaan Lesu
[India Domestik] Harga baja dan skrap domestik India sebagian besar turun pada 3 November. Aktivitas pembelian tetap lemah di tengah permintaan yang lambat dan minat perdagangan yang terbatas. Aktivitas pasar kemungkinan akan meningkat setelah festival Diwali. Rebar Raipur turun 3 USD/ton (300 INR/ton) menjadi 520 USD/ton (49.300 INR/ton) EXW Raipur. Rebar Mumbai tidak berubah 547 USD/ton (51.900 INR/ton) EXW Mumbai. Ingot Ludhiana turun 1 USD/ton (100 INR/ton) menjadi 489 USD/ton (46.300 INR/ton) EXW Ludhiana. Billet Raipur turun 2 USD/ton (200 INR/ton) menjadi 443 USD/ton (42.000 INR/ton) EXW Raipur. Besi spons PDRI Raipur datar 291 USD/ton (27.600 INR/ton) EXW Raipur. Mandi HMS 1&2 (80:20) turun 3 USD/ton (300 INR/ton) menjadi 383 USD/ton (36.300 INR/ton) delivered Mandi.
10 jam yang lalu
Harga Paduan Aluminium Melemah, Pasar Berjangka dan Spot Menunjukkan Pelemahan
11 jam yang lalu
Harga Paduan Aluminium Melemah, Pasar Berjangka dan Spot Menunjukkan Pelemahan
Baca Selengkapnya
Harga Paduan Aluminium Melemah, Pasar Berjangka dan Spot Menunjukkan Pelemahan
Harga Paduan Aluminium Melemah, Pasar Berjangka dan Spot Menunjukkan Pelemahan
[SMM Ulasan Harian Paduan Aluminium] Futures: Kontrak paduan aluminium cor AD2701 yang paling banyak diperdagangkan dibuka pada 22.870 yuan/mt hari ini, dengan harga pembukaan menandai level tertinggi hari ini. Kemudian bergerak melemah, ditutup pada 22.645 yuan/mt pada sesi pagi, turun 95 yuan/mt atau 0,42% dari harga penyelesaian kemarin. Spot: Pasar ADC12 menunjukkan pelemahan secara keseluruhan hari ini. Sentimen menunggu dan melihat masih kuat di pasar ADC12, dan diperkirakan akan terkonsolidasi dengan nada tenang dalam kisaran sempit dalam jangka pendek. Perhatian harus diberikan pada tren harga aluminium dan pembelian aktual di hilir.
11 jam yang lalu
Ringkasan Transaksi Pasar Baterai Bekas 3 Nov [Tinjauan Harian SMM]
12 jam yang lalu
Ringkasan Transaksi Pasar Baterai Bekas 3 Nov [Tinjauan Harian SMM]
Baca Selengkapnya
Ringkasan Transaksi Pasar Baterai Bekas 3 Nov [Tinjauan Harian SMM]
Ringkasan Transaksi Pasar Baterai Bekas 3 Nov [Tinjauan Harian SMM]
12 jam yang lalu