SMM Morning Comments (Apr 7): Shanghai base metals rose for the most part amid weaker dollar and US Treasury yields

Telah Terbit: Apr 07, 2021 10:00 (GMT+8)
Shanghai nonferrous metals fell for the most part on Wednesday morning, while their counterparts on the LME also declined broadly.

SHANGHAI, Apr 7 (SMM) — Shanghai nonferrous metals fell for the most part on Wednesday morning, while their counterparts on the LME also declined broadly. 

In overnight trading, Shanghai base metals rose for the most part due to weaker dollar and US Treasury yields. 

The LME complex all closed higher on Tuesday. Copper jumped 2.67%, aluminium rose 1.35%, zinc increased 2.2%, nickel surged 3.05%, lead added 0.51% and tin gained 2.71%. 

Copper: Three-month LME copper jumped 2.67% to close at $9,040/mt on Tuesday, while the most-traded SHFE 2105 copper contract ended at 67,370 yuan/mt in overnight trading. The US dollar and US Treasury yields both declined, which supported copper futures.  Sellers of spot copper held prices firm as downstream demand will improve further amid a traditional high season and many copper smelters will conduct maintenance in April. LME copper is expected to trade between $9,010-9,090/mt today, and SHFE copper between 67,200-67,700 yuan/mt, while spot copper will be traded between discounts of 50 yuan/mt and premiums of 20 yuan/mt.

Aluminium: Three-month LME aluminium advanced 1.35% to close at $2,260/mt on Tuesday, and is expected to trade between $2,230-2,280/mt today.

The most-active SHFE 2105 aluminium contract settled at 17,585 yuan/mt in overnight trading, with open interest rising 3,203 lots to 201,000 lots, and is likely to fluctuate between 17,400-17,600 yuan/mt today.

Zinc: Three-month LME zinc settled 2.2% higher at $2,830/mt on Tuesday after hitting a two-week high of $2,849/mt earlier in the session, with open interest adding 1,276 lots to 234,000 lots. Zinc stocks across LME-listed warehouses shrank by 1,850 mt or 0.68% to 268,650 mt. Zinc prices increased amid falling US dollar and US Treasury yields, and the International Monetary Fund on Tuesday raised its 2021 growth outlook for the global economy to 6%, up from January’s forecast of 5.5%, which boosted bullish sentiment. But rising COVID-19 cases globally capped gains. LME zinc is expected to fluctuate between $2,800-2,850/mt today.

The most-traded SHFE 2105 zinc contract added 0.57% to close at an intraday high of 21,915 yuan/mt in overnight trading, with open interest rising 3,297 lots to 75,399 lots. The May contract is likely to move between 21,500-22,000 yuan/mt today, while spot discounts for domestic 0# Shuangyan will be seen at 10-20 yuan/mt against the contract.

Nickel: The most-liquid SHFE 2106 nickel contract advanced 0.53% to end at 126,210 yuan/mt in overnight trading, with open interest rising 6,095 lots to 163,000 lots. Three-month LME nickel surged 3.05% to settle at $16,720/mt on Tuesday.

Lead: Three-month LME lead gained 0.51% to close at $1,968/mt on Tuesday, and whether it could steady above the five-day moving average today will be monitored.  

The most-active SHFE 2105 lead contract edged down 0.1% to end at 14,970 yuan/mt in overnight trading. Support from the 14,900 mark will be watched today.

Tin: Three-month LME tin settled 2.71% firmer at $25,800/mt on Tuesday, with open interest losing 71 lots to 12,220 lots. It is expected to trade between $25,000-26,000/mt today.

The most-active SHFE 2106 tin contract increased 0.72% to end at 185,630 yuan/mt in overnight trading, with open interest adding 1,206 lots to 36,132 lots. Market talks that environmental inspection team will come to Yunnan in April stoked concerns on supply of tin raw materials. It is expected to trade between 177,000-190,000 yuan/mt today.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
3 jam yang lalu
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Baca Selengkapnya
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Vedanta telah mengumumkan rencana investasi besar, di mana Vedanta Copper berencana menginvestasikan 2,3 miliar dolar AS di India dan Arab Saudi selama tiga hingga empat tahun ke depan, dengan target produksi tembaga tahunan lebih dari 1 juta ton pada 2030. Perusahaan ini bertujuan memproduksi 500.000 ton per tahun di India dan Arab Saudi, di samping produksi yang sudah berjalan sebesar 100.000 ton di Fujairah, UEA. Sekitar 2 miliar dolar AS akan diinvestasikan pada proyek penambangan, peleburan, dan batang tembaga di Arab Saudi, dengan keputusan investasi untuk usulan smelter tembaga Saudi diperkirakan akan diambil pada kuartal ini. Vedanta juga berupaya menghidupkan kembali smelter tembaga Tuticorin di India, yang telah ditutup sejak 2018. Perusahaan memperkirakan putusan pengadilan akan keluar dalam tiga bulan dan, jika disetujui, berencana menginvestasikan 250 juta dolar AS untuk merenovasi fasilitas tersebut, dengan target pengoperasian kembali dalam delapan hingga sembilan bulan dan produksi tembaga tahunan sebesar 250.000 ton. Sementara itu, fasilitas Silvassa beroperasi pada kapasitas sekitar 95%, dengan produksi katoda tembaga tahunan melebihi 245.000 ton.
3 jam yang lalu
London BTC tandai tembaga dan antimon di Nevada Black Star
5 jam yang lalu
London BTC tandai tembaga dan antimon di Nevada Black Star
Baca Selengkapnya
London BTC tandai tembaga dan antimon di Nevada Black Star
London BTC tandai tembaga dan antimon di Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) mengumumkan pada 5 Oktober 2026 hasil awal pXRF di lapangan dari proyek emas-mineral kritis Black Star di Pershing County, Nevada. Program perdana mengumpulkan 69 sampel chip batuan di sepanjang koridor 2,5 km antara target Western dan Eastern. Pembacaan pXRF menunjukkan antimon hingga 0,44% Sb, tembaga hingga 30,0% Cu, bismut hingga 0,73% Bi, dan perak hingga 811 ppm Ag, dengan asosiasi antimon-tembaga muncul di kedua ujung koridor. Tanda ini mencerminkan sampel historis tahun 1985 yang berjarak 120 m di selatan klaim (>1% Sb, 2% Cu, 700 ppm Ag). Pengambilan sampel uji tuntas sebelumnya menghasilkan hingga 16,23 g/t emas dan 50,5 g/t perak. Sampel kini berada di MSALABS untuk pengujian laboratorium, dengan geokimia multi-elemen lengkap termasuk antimon, tungsten, dan tembaga akan menyusul. Tembaga, sebagai kredit produk sampingan, menambah daya tarik strategis di bawah kebijakan mineral kritis AS, meskipun hasil masih merupakan pembacaan lapangan awal.
5 jam yang lalu
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
5 jam yang lalu
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
Baca Selengkapnya
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
Kantra Copper (ASX:KAN) mengumumkan hasil pengeboran intan di urat Nugent, Tambang Tembaga Kanmantoo: mineralisasi meluas 70 meter lebih dalam dari batas model sumber daya 2025 dan berjarak 370 meter dari level penambangan saat ini. Lubang utama 26KVUG0949 menemukan mineralisasi 70 meter mulai kedalaman 507 meter (1,18% tembaga, 0,24 g/t emas), termasuk interval 38 meter dengan kadar 1,46% tembaga dan 0,18 g/t emas. Nugent terletak di tepi barat daya badan bijih dengan kadar emas lebih tinggi. Hingga akhir Agustus, perusahaan telah menyelesaikan 38.535 meter pengeboran intan tahun ini (Nugent 12.024 meter); pembaruan sumber daya 2026 yang mencakup sekitar 80.000 meter pengeboran diperkirakan akan dirilis pada akhir Oktober. Kanmantoo adalah tambang yang beroperasi, memproduksi 3.170 ton tembaga pada kuartal Juni, dengan panduan 2026 sebesar 12.750–14.000 ton tembaga; perluasan ke kedalaman dapat memanfaatkan terowongan yang ada untuk ekspansi sumber daya dengan biaya modal rendah.
5 jam yang lalu