Secondary lead smelters operating rates dropped 1.3% this week

Telah Terbit: Jan 29, 2021 16:11 (GMT+8)
Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 46.2% in the week, down 1.3 percentage points from the previous week, an SMM survey showed.

SHANGHAI, Jan 29 (SMM) — Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 46.2% in the week, down 1.3 percentage points from the previous week, an SMM survey showed.

The average operating rates remained unchanged on the week at 47.1%, 70.2%, and 33.3% in Anhui, Henan and Jiangsu respectively.

The operating rate in Guizhou dropped 7.3 percentage points on the week to 37.8%, mainly due to Yongxin’s production suspension for holiday.

The alert for the heavy air pollution in Henan was lifted this week. Xincheng Power, Jinhui and other smelters resumed production, but Hebei Shichang and Henan Jiayi suspended production for holidays. Guizhou Dingxin and Cenxiang will enter the holiday next week, and Guizhou Huoqilin will also stop the refining production line. The operating rates are expected to drop further next week.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
2 menit yang lalu
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Baca Selengkapnya
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
2 menit yang lalu
Masivo Menembus 32,5 Meter Mineralisasi Polimetalik di Cerro Colorado dengan Kadar 0,271% Seng dan 0,141% Timbal
10 menit yang lalu
Masivo Menembus 32,5 Meter Mineralisasi Polimetalik di Cerro Colorado dengan Kadar 0,271% Seng dan 0,141% Timbal
Baca Selengkapnya
Masivo Menembus 32,5 Meter Mineralisasi Polimetalik di Cerro Colorado dengan Kadar 0,271% Seng dan 0,141% Timbal
Masivo Menembus 32,5 Meter Mineralisasi Polimetalik di Cerro Colorado dengan Kadar 0,271% Seng dan 0,141% Timbal
Masivo Silver melaporkan hasil uji dari CC-26-001, lubang pertama dari program pengeboran 2026 di proyek Cerro Colorado di Sonora, Meksiko. Lubang tersebut memotong 32,50 meter dari 226,30 hingga 258,80 meter dengan kadar 0,271% seng, 0,141% timbal, 7,0 g/t perak, 0,025% tembaga, dan 0,010 g/t emas. Interval terpisah sepanjang 5,10 meter dari 215,10 meter memiliki kadar 0,611% seng, 0,121% timbal, dan 24,0 g/t perak. Lubang tersebut dihentikan pada kedalaman 259,5 meter karena kesulitan teknis pengeboran saat masih berada dalam batuan teralterasi dan termineralisasi. Masivo berencana mengintegrasikan hasil uji tersebut dengan informasi geologi, struktur, alterasi, dan geofisika untuk memandu pengeboran lanjutan guna menguji kontinuitas lateral dan vertikal. Perusahaan menyatakan bahwa semua interval yang dilaporkan merupakan panjang hasil pengeboran dan lebar sebenarnya belum ditentukan.
10 menit yang lalu
【Flash | 5N Plus Perluas Fasilitas Utah untuk Menangani Indium Antimonida】
16 menit yang lalu
【Flash | 5N Plus Perluas Fasilitas Utah untuk Menangani Indium Antimonida】
Baca Selengkapnya
【Flash | 5N Plus Perluas Fasilitas Utah untuk Menangani Indium Antimonida】
【Flash | 5N Plus Perluas Fasilitas Utah untuk Menangani Indium Antimonida】
5N Plus berencana memperluas fasilitasnya di St. George, Utah sekitar 50%, dengan target penyelesaian pada H2 2027. Situs ini mengubah indium antimonida dan bahan khusus lainnya menjadi bahan semikonduktor, wafer, substrat, dan komponen tertentu, dengan kemampuan pemulihan, pemurnian, dan pertumbuhan kristal. Peralatan baru akan dipasang secara bertahap, tetapi kapasitas khusus InSb tidak diungkapkan; angka 50% mengacu pada perluasan fasilitas, bukan permintaan indium.
16 menit yang lalu