Inner Mongolia intends to control total capacity of steel and refined aluminium industries

Telah Terbit: Dec 29, 2020 16:17 (GMT+8)
Recently, the Development and Reform Commission of Inner Mongolia Autonomous Region, in conjunction with the Industry and Information Technology Bureau and the Energy Bureau, drafted the Several Measures for Ensuring Energy Consumption Control Targets in the "14th Five-Year Plan" (draft for comments).

SHANGHAI, Dec 29 (SMM)—Recently, the Development and Reform Commission of Inner Mongolia Autonomous Region, in conjunction with the Industry and Information Technology Bureau and the Energy Bureau, drafted the Several Measures for Ensuring Energy Consumption Control Targets in the "14th Five-Year Plan" (draft for comments). 

The draft requires to accelerate energy-saving technological transformation in key high-energy-consuming industries. From 2021 to 2023, focus should be on transformation of key energy-consuming enterprises in high-energy-consuming industries such as thermal power, iron and steel, aluminium, ferroalloy, calcium carbide, copper, lead, zinc, chemical and building materials, and unit product energy consumption after transformation better reach national standards. Comprehensively promote comprehensive energy-saving transformation of coal-fired power plants. All leagues and cities should complete all transformation tasks at least in accordance with the progress of 40%, 40%, and 20%. Increase support for energy-saving technological transformation projects.

Control capacity of some high-energy-consuming industries. From January 1, 2021, new capacity projects of ferroalloys, calcium carbide, calcium carbide method polyvinyl chloride (PVC), and cement (clinker) will no longer be approved. All projects that have been approved before the end of 2020 but have not yet started construction will be suspended or postponed. Total capacity of steel and refined aluminium industries will be controlled. Except for projects that have completed or are in the process of capacity replacement and projects that use fly ash to extract alumina to produce refined aluminum, no additional capacity projects will be approved. Strictly control new coke capacity. Wuhai City, Ordos City, and Alxa League will replace capacity on the basis of not breaking the existing capacity (including projects that have started construction before the end of 2020). 

Implement the green electricity price policy. Starting from January 1, 2021, the preferential electricity prices for high-energy-consuming industries in West Inner Mongolia will be cancelled, and policy-based cross-subsidies will be imposed on self-provided power plants. Power trading plans will be improved and trading modes will be adjusted.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Data: Pergerakan pasar SHFE, DCE (29 Sep)
43 menit yang lalu
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 29 Sep 2026.
43 menit yang lalu
Indonesia Perketat Aturan Pertambangan, Prioritaskan Kontraktor Lokal di Atas Afiliasi
1 jam yang lalu
Indonesia Perketat Aturan Pertambangan, Prioritaskan Kontraktor Lokal di Atas Afiliasi
Baca Selengkapnya
Indonesia Perketat Aturan Pertambangan, Prioritaskan Kontraktor Lokal di Atas Afiliasi
Indonesia Perketat Aturan Pertambangan, Prioritaskan Kontraktor Lokal di Atas Afiliasi
[SMM Berita Kilat Aluminium] Indonesia memperketat aturan kontraktor pertambangan afiliasi, memprioritaskan penyedia jasa lokal. Kementerian Energi dan Sumber Daya Mineral (ESDM) telah menerbitkan Kepmen ESDM No. 365.K/MB.01/MEM.B/2026, efektif 18 September, yang mewajibkan pemegang IUP dan IUPK untuk memprioritaskan perusahaan jasa pertambangan berlisensi yang berlokasi di kabupaten atau kota di sekitar wilayah tambangnya. Perusahaan tambang juga dilarang menunjuk langsung anak perusahaan atau perusahaan jasa pertambangan afiliasi tanpa persetujuan Menteri ESDM, termasuk jika perusahaan-perusahaan tersebut memiliki pemilik manfaat akhir yang sama. Anak perusahaan dan afiliasi tetap dapat digunakan dengan persetujuan pemerintah dalam keadaan tertentu, termasuk Proyek Strategis Nasional, pembangunan fasilitas pengolahan atau pemurnian mineral, dan pemenuhan kebutuhan mineral dalam negeri. Direktur Jenderal Mineral dan Batu Bara ESDM Tri Winarno mengklarifikasi pada 29 September bahwa regulasi tersebut tidak sepenuhnya melarang penggunaan kontraktor afiliasi, tetapi memperkenalkan mekanisme persetujuan sekaligus meningkatkan peluang bagi perusahaan jasa pertambangan lokal.
1 jam yang lalu
Biaya Pemrosesan Billet Aluminium Nanchang Tidak Berubah pada 29 September
2 jam yang lalu
Biaya Pemrosesan Billet Aluminium Nanchang Tidak Berubah pada 29 September
Baca Selengkapnya
Biaya Pemrosesan Billet Aluminium Nanchang Tidak Berubah pada 29 September
Biaya Pemrosesan Billet Aluminium Nanchang Tidak Berubah pada 29 September
Pada 29 September, billet aluminium Nanchang Φ90 dihargai RMB 24.340/ton, dengan biaya pemrosesan RMB 230/ton (tidak berubah dari hari perdagangan sebelumnya); Φ120 dihargai RMB 24.260/ton, dengan biaya pemrosesan RMB 150/ton (tidak berubah); Φ178 dihargai RMB 24.260/ton, dengan biaya pemrosesan RMB 150/ton (tidak berubah). Aluminium spot SMM A00 berada di RMB 24.110/ton.
2 jam yang lalu