The project of Jiang Copper Kazakhstan Tungsten Mine has started!

Telah Terbit: Nov 13, 2020 08:25
At 10:00 (local time) on November 11, at the scene of the Bakuta tungsten mine in Kazakhstan, the sun was shining, colorful flags were flying and the atmosphere was warm. The simple and grand opening ceremony of the early project of the Bakuta tungsten mine in Kazakhstan was held here. After more than a year of unremitting efforts to overcome the adverse effects of novel coronavirus's global pandemic, the Bakuta tungsten mine project, one of the 56 key projects within the framework of production capacity cooperation between China and Kazakhstan, has officially started construction. it marks a milestone in the construction of the project.

SMM Network News:

At 10:00 (local time) on November 11, at the scene of the Bakuta tungsten mine in Kazakhstan, the sun was shining, colorful flags were flying and the atmosphere was warm. The simple and grand opening ceremony of the early project of the Bakuta tungsten mine in Kazakhstan was held here. After more than a year of unremitting efforts to overcome the adverse effects of novel coronavirus's global pandemic, the Bakuta tungsten mine project, one of the 56 key projects within the framework of production capacity cooperation between China and Kazakhstan, has officially started construction. it marks a milestone in the construction of the project.

Almaty Deputy Governor Tuldarif Cerek Merisovich and Nazar Terrica, deputy general manager of Jiaxin International Resources Investment Co., Ltd., jointly cut the ribbon for the project.

Jiang Copper cooperates with (Hong Kong) Hengzhao International Co., Ltd. to invest in Kazakhstan Jetsu Tungsten Company to jointly develop the Bakuta extra-large open-pit tungsten mine project, which is not only the need of the company's "three-year innovation doubling" development. It is also a requirement for state-owned enterprises in Jiangxi Province to go abroad.

Zhang Jianhua, general manager of Jiaxin International Resources Investment Co., Ltd., said: Bakuta Tungsten Mine has world-class tungsten resources, and upon completion of the project, it will become one of the single tungsten mines with the largest production capacity in the world. the annual output of tungsten concentrate is expected to exceed 10% of the annual output of tungsten concentrate in the world, which has good economic and social benefits.

The early project of the Bakuta Tungsten Mine in Kazakhstan is undertaken by the Kazakh Branch of China Civil Engineering Group. Construction and construction units promise high standards and strict requirements, carefully organize and scientific construction, ensure safety, environmental protection, and quality, complete the project construction tasks on time, and strive to build an "international first-class project."

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Tungsten West Amankan Investasi £71 Juta dari Dana Kekayaan Nasional Inggris untuk Pengembangan Tambang
20 jam yang lalu
Tungsten West Amankan Investasi £71 Juta dari Dana Kekayaan Nasional Inggris untuk Pengembangan Tambang
Baca Selengkapnya
Tungsten West Amankan Investasi £71 Juta dari Dana Kekayaan Nasional Inggris untuk Pengembangan Tambang
Tungsten West Amankan Investasi £71 Juta dari Dana Kekayaan Nasional Inggris untuk Pengembangan Tambang
[SMM Tungsten Express] Tungsten West telah menyepakati persyaratan dengan National Wealth Fund Inggris untuk investasi hingga £71 juta, termasuk £36 juta dalam bentuk ekuitas, hingga £25 juta dalam bentuk utang berkomitmen, dan fasilitas akordeon non-komitmen sebesar £10 juta. Dana tersebut juga akan memiliki periode terbatas untuk menyelesaikan perjanjian offtake hingga 50% dari produksi tungsten. Perusahaan telah memproduksi konsentrat dan sedang dalam pengujian penyelesaian akhir, menargetkan dimulainya produksi pada Q3 2026 dan peningkatan penuh pada Q1 2027. Perjanjian ini diharapkan menciptakan 350 lapangan kerja langsung.
20 jam yang lalu
31 Aug 2026 13:26
Baca Selengkapnya
[Berita Molibdenum] SMM 31 Agustus: Sebuah pabrik baja di Fujian menetapkan harga tender feromolibdenum sebesar 337.000 yuan/mt pada 31 Agustus, dengan syarat tunai, volume akan dikonfirmasi.
31 Aug 2026 13:26
GEM Melaporkan Lonjakan Penjualan Produk Tungsten 162,37%, Mengapalkan 3.165 Ton pada H1 2026
31 Aug 2026 09:00
GEM Melaporkan Lonjakan Penjualan Produk Tungsten 162,37%, Mengapalkan 3.165 Ton pada H1 2026
Baca Selengkapnya
GEM Melaporkan Lonjakan Penjualan Produk Tungsten 162,37%, Mengapalkan 3.165 Ton pada H1 2026
GEM Melaporkan Lonjakan Penjualan Produk Tungsten 162,37%, Mengapalkan 3.165 Ton pada H1 2026
Menurut laporan tengah tahunan GEM, pada paruh pertama 2026, volume pengiriman produk tungsten hasil daur ulang dan remanufaktur dari sumber daya tungsten oleh perusahaan mencapai 3.165 ton, dengan pendapatan penjualan meningkat 162,37% dibandingkan periode yang sama tahun sebelumnya.
31 Aug 2026 09:00
The project of Jiang Copper Kazakhstan Tungsten Mine has started! - Shanghai Metals Market (SMM)