Jingke Energy subsidiary plans to be internally reorganized and listed on Kechuang Board in the next three years.

Telah Terbit: Sep 22, 2020 15:26 (GMT+8)
[Jingke Energy subsidiary plans to restructure internally and return to Kechuang Board to be listed in the next three years] recently, Jingke Energy announced that it is considering an internal restructuring so that its main subsidiary, Jiangxi Jingke, will be listed on the Shanghai Stock Exchange Kechuang Board in the next three years.

SMM9 March 22: recently, Jingke Energy announced that it is considering an internal restructuring to make its main subsidiary Jiangxi Jingke listed on the Shanghai Jiaotong Stock Exchange in the next three years. In order to make Jiangxi Jingke qualified for listing and financing in Science and Technology Innovation Board, the board of directors also approved equity financing for Jiangxi Jingke, domestic third-party investment institutions, and Jingke Energy founders Li Xiande, Chen Kangping and Li Xianhua. And the company's senior management will invest a total of 3.1 billion yuan ($458 million) in Jiangxi Jingke, accounting for 26.7 percent of Jiangxi Jingke's stake.

Chen Kangping, CEO of Jingke Energy, said that Jiangxi Jingke's listing in Science and Technology Innovation Board will enable it to obtain new growth capital, which we believe will strengthen our leading position in the photovoltaic industry and support our long-term business growth. We believe that the listing of Jingke Energy on the New York Stock Exchange and the listing of Jiangxi Jingke on Science and Technology Innovation Board will enhance our visibility among Chinese and global investors and bring long-term sustainable returns to our shareholders.

Jingke Energy is one of the leading solar photovoltaic enterprises in the world. As of March 31, 2020, the production capacity of monocrystalline silicon wafers has reached about 17.5 gigawatts, the production capacity of battery wafers has reached about 10.6 gigawatts, and the module production capacity has reached about 16 gigawatts. On the performance side, revenue in the first quarter was 8.484 billion yuan ($1.198 billion), exceeding market expectations by 16.31 per cent and up 45.72 per cent from 5.822 billion yuan in the same period last year.

Jingke Energy expects that the total shipments of solar modules in 2020 will achieve 18GW-20GW. By the end of 2020, the annual production capacity of single wafers, solar cells and solar modules will reach 20GW, 11GW (including 9 million kilowatt n-type cells) and 25GW, respectively.

It is reported that as the world's largest supplier of photovoltaic modules, Jingke Energy has made great efforts to expand production, and plans to invest 11 billion yuan, 13.5 billion yuan and 10.5 billion yuan respectively in three production bases in Yiwu, Jiangxi Shangrao, and Haining, Zhejiang Province. it is used to expand the production capacity of silicon wafers, batteries and components.

Appendix: Jingke Energy subsidiary returns to domestic Internal Medicine Entrepreneurship Board announcement

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
26 Sep 2026 01:38 (GMT+8)
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
Baca Selengkapnya
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
Peru melihat peningkatan produksi tembaga 1 juta ton per tahun dalam lima hingga enam tahun
Menteri Energi dan Pertambangan Peru Guillermo Shinno mengatakan negaranya berharap dapat menambah sekitar 1 juta ton produksi tembaga tahunan dalam lima hingga enam tahun ke depan melalui proyek-proyek pertambangan baru. Produsen tembaga terbesar ketiga di dunia itu memperkirakan produksi 2026 sebesar 2,5 hingga 2,7 juta ton, hampir tidak berubah dari 2023 karena menurunnya kadar bijih dan konflik sosial yang berulang membebani pasokan. Pemerintah yang baru terpilih berupaya membalikkan stagnasi itu dengan memangkas birokrasi; dalam dua bulan sejak menjabat, perusahaan-perusahaan pertambangan telah meningkatkan keterlibatan dengan kementerian tersebut. Shinno mengatakan para pejabat telah mengidentifikasi 27 izin yang dapat dihapus dari sekitar 100 persyaratan sektor pertambangan, tanpa menurunkan standar lingkungan
26 Sep 2026 01:38 (GMT+8)
SMM Kilas Berita
24 Sep 2026 17:24 (GMT+8)
SMM Kilas Berita
Baca Selengkapnya
SMM Kilas Berita
SMM Kilas Berita
【SMM Sekilas】Hassett mengkritik komentar terbaru pejabat Fed yang mendukung kenaikan suku bunga lebih lanjut, menyerukan pemulihan “independensi” Fed.
24 Sep 2026 17:24 (GMT+8)
Data: Pergerakan pasar SHFE, DCE (24 Sep)
24 Sep 2026 15:54 (GMT+8)
Data: Pergerakan pasar SHFE, DCE (24 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (24 Sep)
Data: Pergerakan pasar SHFE, DCE (24 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan nonbesi di SHFE dan DCE pada 24 Sep 2026.
24 Sep 2026 15:54 (GMT+8)