SMM Evening Comments (Sep 14): Shanghai nonferrous metals rose across the board

Telah Terbit: Sep 14, 2020 17:49 (GMT+8)
SHFE nonferrous metals closed higher across the board on Monday September 14 as China’s social financing for August exceeded expectations to boost market confidence.

SHANGHAI, Sep 14 (SMM) — SHFE nonferrous metals closed higher across the board on Monday September 14 as China’s social financing for August exceeded expectations to boost market confidence.

 

The People's Bank of China (PBOC) injected 80 billion yuan (about 11.7 billion U.S. dollars) into the market through seven-day reverse repos at an interest rate of 2.2 percent, according to a statement on the website of the central bank.

 

Zinc was the best performer with a rise of 2.59%. Cooper advanced 0.97%, aluminium edged up 0.73%, tin climbed 1.51%, lead increased 1.01% and nickel went up 2.48%.

 

SMM data showed that social inventories of refined zinc ingots across Shanghai, Tianjin, Guangdong, Jiangsu, Zhejiang, Shandong and Hebei decreased 4,800 mt from September 11 to 154,000 mt as of September 14. The stocks were down 17,200 mt from last Monday September 7.

 

The ferrous complex also traded higher. Iron ore increased 2.41%, rebar rose 0.47%, and hot-rolled coil gained 0. 8%.

 

Copper: The most-traded SHFE 2010 copper contract surged to an intraday high of 52,530 yuan/mt, before giving some gains to end 0.97% higher at 52,120 yuan/mt today. China's credit growth rate announced on Friday exceeded expectations in August, relatively easing the market's worries about marginal tightening of monetary policy. The People's Bank of China (PBOC) is injecting 80 billion yuan through seven-day reverse bond repurchase agreements to maintain liquidity, supporting copper prices above 52,000 yuan/mt. Whether the contract could remain above 52,000 yuan/mt will come under scrutiny tonight.

 

Aluminium: The most-liquid SHFE 2010 aluminium contract climbed to an intraday high of 14,540 yuan/mt after opening and finished the day 0.73% higher at 14,515 yuan/mt. Open interest fell 980 lots to 126,000 lots. The change of the basis and the flow of the fund will come under scrutiny.

 

Zinc: The most-active SHFE 2010 zinc contract finished the day 2.59% higher at 19,770 yuan/mt today. Open interest fell 3,365 lots to 83,843 lots. Downstream purchase improved at low prices this week, and social inventories continued to decline. The contract is expected to break through the above moving average tonight.

 

Nickel: The most-traded SHFE 2011 nickel contract closed up 2.48% at 118,820 yuan/mt today. Open interest rose 8,512 lots to 118,820 lots. The trend of the US crude oil will be monitored tonight.

 

Lead: The most-traded SHFE 2010 lead contract slipped to a session low of 14,830 yuan/mt, before closing 1.01% higher at an intraday high of 15,075 yuan/mt. Open interest fell 871 lots to 26,285 lots. Fundamental scrap battery prices are unlikely to drop, as secondary lead is reluctant to sell, improving the downstream purchasing sentiment compared with the previous period. Whether the contract could remain above 15,000 yuan/mt will be watched tonight.

 

Tin: The most-liquid SHFE 2011 tin contract rose to an intraday high of 145,240 yuan/mt and ended 1.51% higher at 144,820 yuan/mt today. Open interest fell 1,528 lots to 21,749 lots. Pressure above is expected to around 10-day moving average of 145,500 yuan/mt.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
2 jam yang lalu
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Baca Selengkapnya
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Kobrea Exploration Corp. mengumumkan persetujuan program eksplorasi 2026/27 senilai US$4 juta untuk Distrik Pertambangan Malargüe Barat di Provinsi Mendoza, Argentina, yang sepenuhnya didanai oleh BHP. Program ini mencakup pengeboran inti di target porfiri tembaga-emas-molibdenum El Destino, survei polarisasi terinduksi di El Destino dan KBX-17, serta pemetaan geologi, pengambilan sampel geokimia, dan pekerjaan hiperspektral. Aliansi eksplorasi ini mencakup tujuh proyek dengan total luas sekitar 733 kilometer persegi, tempat anomali geokimia tembaga, emas, dan molibdenum telah teridentifikasi. Analisis SMM: persetujuan anggaran baru mengubah kemitraan BHP-Kobrea dari kerangka aliansi menjadi fase pengeboran aktif. Namun, properti tersebut masih berada pada tahap eksplorasi awal, tanpa molibden
2 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
2 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Baca Selengkapnya
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Glencore berencana menyerahkan laporan dampak lingkungan untuk proyek tembaga-molibdenum El Pachón di Argentina pada kuartal I 2027 dan menargetkan persetujuan di bawah Rezim Insentif untuk Investasi Besar, atau RIGI, sebelum Juli 2027. Glencore sebelumnya melaporkan sekitar 6 miliar ton sumber daya mineral dengan kadar rata-rata 0,43% tembaga, 2,2 g/t perak, dan 130 g/t molibdenum, setara dengan sekitar 0,013% Mo. Berdasarkan tonase dan kadar rata-rata yang diungkapkan, sumber daya tersebut mengandung sekitar 780.000 ton molibdenum in-situ, meskipun ini tidak mewakili cadangan, logam yang dapat diperoleh kembali, atau produksi di masa depan. Selama musim eksplorasi 2025/26, proyek ini menyelesaikan 53 lubang bor dengan total 21.246 meter dan memajukan infrastruktur awal jalan dan jembatan.
2 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
2 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Baca Selengkapnya
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Glencore mengumumkan bahwa proyek Agua Rica, yang dikenal sebagai MARA, telah menerima persetujuan di bawah Rezim Insentif untuk Investasi Besar Argentina, atau RIGI. Deposit tembaga-emas-perak-molibdenum skala besar ini mengandung sekitar 1,2 miliar ton sumber daya mineral terukur dan terindikasi dengan kadar rata-rata 0,03% molibdenum. Berdasarkan tonase dan kadar yang diungkapkan, sumber daya tersebut mengandung sekitar 360.000 ton molibdenum in-situ; namun, ini tidak mewakili cadangan, logam yang dapat dipulihkan, atau produksi molibdenum di masa depan. Glencore juga memajukan perkiraan produksi pertama dari restart Alumbrera menjadi H2 2027 dari sebelumnya H1 2028. Infrastruktur pemrosesan, logistik, dan tenaga kerja Alumbrera diharapkan dapat mendukung pengembangan MARA di masa depan. Analisis SMM: Persetujuan RIGI meningkatkan kepastian fiskal dan regulasi proyek, tetapi belum ada keputusan investasi final, rencana pemulihan molibdenum, atau panduan produksi molibdenum yang diumumkan, sehingga tidak ada dampak langsung dalam jangka pendek terhadap pasokan molibdenum.
2 jam yang lalu