[SMM Daily Review] Nonferrous Platinum fell by more than 2%, lead by more than 2%, zinc and tin by more than 1%, crude oil fell by more than 1%, gold and silver rebounded.

Telah Terbit: Sep 10, 2020 16:49 (GMT+8)

SMM9 March 10: today, all non-ferrous metals are floating green. By the end of the day, Shanghai lead fell 2.28%, Shanghai zinc fell 1.6%, Shanghai tin fell 1.01%, Shanghai nickel fell 0.8%, Shanghai copper fell 0.37%, and Shanghai aluminum fell 0.28%. In terms of nickel, macro factors triggered market panic, affecting not only safe-haven assets such as gold and silver, but also basic metals. From a fundamental point of view, the peak of stainless steel prices and increased profit pressure are the factors restricting the upward rise of nickel prices, but they are not the decisive factors in the near future. spot nickel prices are strong, and nickel pig iron has little room to fall. There is still a gap between the supply and demand of primary nickel in the third quarter, so the decline in nickel prices may not be a long-term trend. at present, macro sentiment and bears have the upper hand, making it difficult for nickel prices to rebound quickly. It is expected that the near-term nickel price in the current position near the shock consolidation is mainly, or can look forward to later repair.

In terms of copper, today's Shanghai copper gave up yesterday's gains and closed negative, KDJ opening expansion, the lower by the 20-day moving average support. In the evening, we will pay attention to the number of people in the United States who have applied for unemployment benefits in the week up to September 5 to test whether Shanghai Copper can hold the support of 51500 yuan on the Brin middle rail line.

[brief Review of SMM Copper Futures] Macro-mood is not as expected. Shanghai Copper receives negative results.

In terms of lead, Shanghai lead closed triple negative, k line center of gravity further moved down, k line entity pressure for 5 days and 60 days average, KDJ index downward exposure expanded, technical side shows that Shanghai lead has entered the downward channel, at the same time, the fundamentals downstream consumption has not improved much, macro need to pay attention to China's August social finance data, night attention to whether bears can continue to break through the previous support of 14800 yuan / ton first line.

[brief Review of lead in SMM period] Shanghai lead fell three times in a row and focused on the first line of 14800 at night.

In terms of black, thread fell 1.6%, hot coil 1.76%, stainless steel 2.18%, coke 2%, coking coal 1.46%, iron ore 2.26%. Affected by the accident on Sept. 7, Novolipietsk Steel (NLMK), Russia's largest steelmaker, has suspended iron ore concentrate production at its Stoilensky mine. According to sources, all of NLMK Group's iron ore concentrate comes from the project, so the company's pig iron and steel production is under threat. On 7 September, the conveyor belt corridor used to transport further processed ore at the Stoilensky mine collapsed. Production of related products has been suspended, but quarrying operations are continuing. "

Russia's NLMK Group faces risks in suspending iron ore concentrate production, pig iron and steel production.

Crude oil fell 1.78% in the previous period, and crude oil inventories rose 2.97 million barrels to about 504.1 million barrels in the week to September 4, according to data released on Wednesday by the American Petroleum Institute ((API)), while analysts expected a decline of 1.075 million barrels. In addition, EIA cut its forecast for global crude oil demand growth by 210000 b / d to-8.32 million b / d in 2020.

In terms of precious metals, Shanghai gold rose 0.97%, Shanghai silver rose 1.69%, and the US dollar fell, and investors worried that the development of a du vaccine for coronary heart disease would be delayed, enhancing gold's safe-haven attractiveness. Analysts point out that gold prices remain bullish in the medium and long term against the backdrop of generally loose monetary policy by central banks around the world.

As of today's day close:

Today's capital flow

Capital is favored by the differentiation of various plates, and the total outflow of Mandarin commodities is only 169 million yuan. Of which 365 million left the market from the black chain, coke monopolized 310 million yuan, the chemical and crude oil sectors also lost more than 300 million yuan, while coal and soft commodities outflowed less than 200 million yuan. Feed sector received 600 million financial support, corn won 355 million yuan, 371 million yuan returned to non-ferrous metals, and oil chain absorbed more than 300 million yuan. In addition, 858 million yuan was re-entered for precious metals, and Shanghai Silver won 575 million. Yesterday, the funds of the stock index fled quickly, with outflows of 3.908 billion yuan from IF and 1.528 billion yuan from IC.

"Click to sign up: 2020 Tin Industry chain Trading Summit

Scan the code to participate in the meeting or apply to join the SMM tin industry exchange group

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
2 jam yang lalu
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
Baca Selengkapnya
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
[SMM PGM Flash] Generation Mining telah memulai konstruksi awal di proyek tembaga–paladium Marathon di barat laut Ontario. Pekerjaan dimulai setelah perusahaan menyerahkan jaminan sebesar C$6,5 juta yang mencakup rehabilitasi lokasi tahap konstruksi. Program pekerjaan awal yang lebih luas direncanakan mencakup peningkatan jalan akses, struktur pengelolaan air, dan pasokan listrik sementara hingga akhir 2026 dan berlanjut ke 2027. Dimulainya pekerjaan ini membawa sumber paladium dan platinum potensial di Amerika Utara ke tahap pekerjaan fisik di lokasi. Studi kelayakan Generation memperkirakan sekitar 2,16 juta ons paladium yang dapat dibayarkan dan 488.000 ons platinum selama umur tambang 13 tahun; ini adalah proyeksi, bukan produksi. Perusahaan juga memperkirakan akan melakukan pembayaran peralatan awal sekitar C$30 juta, tergantung pada kontrak final dan persetujuan.
2 jam yang lalu
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
02 Oct 2026 15:48 (GMT+8)
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
Baca Selengkapnya
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
[SMM PGM Flash] Platinum Group Metals menyatakan pada 1 Oktober bahwa pengujian independen oleh Battery Innovation Center telah memvalidasi elektroda berbasis platinum dan paladium milik anak perusahaannya, Lion Battery, dalam sel prototipe litium-sulfur. Dibandingkan dengan sel tanpa katalis, prototipe tersebut menunjukkan kapasitas dan kemampuan laju yang lebih baik, dengan formulasi kaya paladium berkinerja terbaik secara keseluruhan. Platinum Group dan Valterra Platinum, yang masing-masing memiliki 52% dan 48% saham Lion, telah menyetujui pendanaan untuk tahap berikutnya. Hasil ini menawarkan kemungkinan penggunaan baru untuk PGM di luar katalis knalpot kendaraan, tetapi masih merupakan tonggak prototipe. Lion berencana membuat dan menguji sel kantong, menyempurnakan katalis, dan menilai aplikasi termasuk drone. Kinerja komersial dan permintaan untuk volume PGM yang signifikan belum terbukti. Pekerjaan ini relevan bagi pemasok Afrika Selatan: Valterra memproduksi PGM di Afrika Selatan dan Zimbabwe, sementara Platinum Group sedang mengembangkan proyek Waterberg di Afrika Selatan.
02 Oct 2026 15:48 (GMT+8)
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
01 Oct 2026 16:45 (GMT+8)
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
Baca Selengkapnya
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
[SMM PGM Flash] Sibanye-Stillwater mengumumkan pada 30 September bahwa para pekerja di tambang platinum dan paladium East Boulder miliknya di Montana telah meratifikasi perjanjian kerja bersama dengan United Steelworkers. Kesepakatan tersebut berlaku surut sejak 1 Agustus 2026 hingga 31 Juli 2029, dengan kenaikan upah 4,5% pada tahun pertama, mana yang lebih besar antara 3,5% atau IHK pada tahun kedua, dan mana yang lebih besar antara 3,0% atau IHK pada tahun ketiga. Aksi mogok di tambang Stillwater East yang terpisah dan fasilitas metalurgi Columbus masih berlanjut, kata perusahaan tersebut. Penyelesaian di East Boulder menetapkan sebagian jalur biaya tenaga kerja untuk bisnis PGM Sibanye di AS dan mendukung rencana peralihannya menuju penambangan yang lebih termekanisasi dan insentif berbasis tim. Hal ini tidak menyelesaikan pemogokan lainnya atau menunjukkan pemulihan produksi; perusahaan tidak mengungkapkan revisi panduan produksi dalam rilis ini.
01 Oct 2026 16:45 (GMT+8)