SMM Evening Comments (Sep 8): Shanghai nonferrous metals closed mostly higher, zinc fell 0.3%

Telah Terbit: Sep 08, 2020 17:51 (GMT+8)
SHFE nonferrous metals rose for the most part on Tuesday September 8 as overseas demand rebounded under the dual support of economy stimulus and strictly controlled pandemic.

SHANGHAI, Sep 8 (SMM) – SHFE nonferrous metals rose for the most part on Tuesday September 8 as overseas demand rebounded under the dual support of economy stimulus and strictly controlled pandemic.

 

Copper, the best performer, rose 0.63%, aluminium advanced 0.35%, lead climbed 0.35%, nickel went up 0.13% and tin gained 0.59%, while zinc edged down 0.3%.

 

A total of 93 vessels carrying 14.1 million mt of iron ore arrived at major Chinese ports during August 30-September 5, SMM estimates. This was up 520,000 mt from the prior week and 3.25 million mt from the same period last year.

 

The ferrous complex fell across the board. Hot-rolled coil fell 1.36%, rebar shed 0.85% and iron ore went down 1.63%.

 

Copper: The most-traded SHFE 2010 copper contract fell to a session low of 52,320 yuan/mt after the opening bell, and closed 0.63% higher at 52,590 yuan/mt today. Chile will conduct labor bargaining in September, leading to worries about the tight supply and bolstering copper prices. LME inventories hit a new low in recent years, less than 80,000 mt, which also supported copper prices at highs. Whether the contract could maintain its upward trend will come under scrutiny tonight.

 

Aluminium: The most-liquid SHFE 2010 aluminium contract slipped to a session low of 14,460 yuan/mt and closed up 0.35% at 14,485 yuan/mt today. Open interest fell 944 lots to 121,000 lots.

 

Zinc: The most-active SHFE 2010 zinc contract failed to break through 19,910 yuan/mt and ended the day 0.3% lower at 19,800 yuan/mt. Open interest fell 1,102 lots to 94,076 lots. The contract is expected to fluctuate rangebound tonight.

 

Nickel: The most-traded SHFE 2011 nickel contract rose to an intraday high of 120,050 yuan/mt in afternoon trading and closed up 0.13% at 119,610 yuan/mt today. The contract generated a V-shaped movement on Tuesday. Open interest fell 1,265 lots to 146,827 lots. The contract is expected to move below 120,000 yuan/mt tonight.

 

Lead: The most-traded SHFE 2010 lead contract fell rapidly to a session low of 15,530 yuan/mt after opening, and finished the day 0.35% higher at 15,595 yuan/mt. Open interest fell 1,543 lots to 24,903 lots. Battery scrap prices declined and the cost of secondary lead fell amid sluggish fundamental consumption, weighing on the lead prices. Whether the contract could move above 15,550 yuan/mt will be monitored tonight.

 

Tin: The most-liquid SHFE 2011 tin contract climbed to an intraday high of 148,150 yuan/mt and closed 0.59% higher at 147,220 yuan/mt today. Open interest rose 978 lots to 23,050 lots. Pressure above is expected to around 148,500 yuan/mt.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
1 jam yang lalu
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Baca Selengkapnya
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Kobrea Exploration Corp. mengumumkan persetujuan program eksplorasi 2026/27 senilai US$4 juta untuk Distrik Pertambangan Malargüe Barat di Provinsi Mendoza, Argentina, yang sepenuhnya didanai oleh BHP. Program ini mencakup pengeboran inti di target porfiri tembaga-emas-molibdenum El Destino, survei polarisasi terinduksi di El Destino dan KBX-17, serta pemetaan geologi, pengambilan sampel geokimia, dan pekerjaan hiperspektral. Aliansi eksplorasi ini mencakup tujuh proyek dengan total luas sekitar 733 kilometer persegi, tempat anomali geokimia tembaga, emas, dan molibdenum telah teridentifikasi. Analisis SMM: persetujuan anggaran baru mengubah kemitraan BHP-Kobrea dari kerangka aliansi menjadi fase pengeboran aktif. Namun, properti tersebut masih berada pada tahap eksplorasi awal, tanpa molibden
1 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
1 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Baca Selengkapnya
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Glencore berencana menyerahkan laporan dampak lingkungan untuk proyek tembaga-molibdenum El Pachón di Argentina pada kuartal I 2027 dan menargetkan persetujuan di bawah Rezim Insentif untuk Investasi Besar, atau RIGI, sebelum Juli 2027. Glencore sebelumnya melaporkan sekitar 6 miliar ton sumber daya mineral dengan kadar rata-rata 0,43% tembaga, 2,2 g/t perak, dan 130 g/t molibdenum, setara dengan sekitar 0,013% Mo. Berdasarkan tonase dan kadar rata-rata yang diungkapkan, sumber daya tersebut mengandung sekitar 780.000 ton molibdenum in-situ, meskipun ini tidak mewakili cadangan, logam yang dapat diperoleh kembali, atau produksi di masa depan. Selama musim eksplorasi 2025/26, proyek ini menyelesaikan 53 lubang bor dengan total 21.246 meter dan memajukan infrastruktur awal jalan dan jembatan.
1 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
1 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Baca Selengkapnya
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Glencore mengumumkan bahwa proyek Agua Rica, yang dikenal sebagai MARA, telah menerima persetujuan di bawah Rezim Insentif untuk Investasi Besar Argentina, atau RIGI. Deposit tembaga-emas-perak-molibdenum skala besar ini mengandung sekitar 1,2 miliar ton sumber daya mineral terukur dan terindikasi dengan kadar rata-rata 0,03% molibdenum. Berdasarkan tonase dan kadar yang diungkapkan, sumber daya tersebut mengandung sekitar 360.000 ton molibdenum in-situ; namun, ini tidak mewakili cadangan, logam yang dapat dipulihkan, atau produksi molibdenum di masa depan. Glencore juga memajukan perkiraan produksi pertama dari restart Alumbrera menjadi H2 2027 dari sebelumnya H1 2028. Infrastruktur pemrosesan, logistik, dan tenaga kerja Alumbrera diharapkan dapat mendukung pengembangan MARA di masa depan. Analisis SMM: Persetujuan RIGI meningkatkan kepastian fiskal dan regulasi proyek, tetapi belum ada keputusan investasi final, rencana pemulihan molibdenum, atau panduan produksi molibdenum yang diumumkan, sehingga tidak ada dampak langsung dalam jangka pendek terhadap pasokan molibdenum.
1 jam yang lalu
SMM Evening Comments (Sep 8): Shanghai nonferrous metals closed mostly higher, zinc fell 0.3% - Shanghai Metals Market (SMM)