The Citronen zinc mine project of Ironbark Zinc, an Australian mining company, provided an additional 90, 000 tons of zinc in the first six years of production.

Telah Terbit: Sep 08, 2020 10:36 (GMT+8)

SMM9, March 8 / PRNewswire-FirstCall-Asianet /-- Australian mining company Ironbark Zinc recently announced that it has provided an additional 90, 000 tons of zinc in the first six years of production following a review of the mining plan for the Citronen zinc mine in Greenland.

The review brings the optimal size of the project to 3.3 million tons of zinc per year, and the life of the mine has been determined to be 14 years.

The company said the increase in production could be achieved because new double grooves were installed to approach the main orebody, which would greatly improve metal recovery.

The Citronen project is positioned as a priority investment project in Ironbark's main zinc project because of its long mine life, potential for large-scale exploration, valid mining licences and the support of Glencore and Trafigura, the off-take agreement with Glencore and Trafigura will result in the delivery of about 70 per cent of the concentrate produced by Citronen.

Click to sign up: 2020 Hot-dip galvanizing Technology and Market Application Development Forum

Please fill in your personal information on the last page and the meeting staff will contact you later!

Scan the QR code and apply to join the SMM Zinc Industry Exchange Group

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
4 jam yang lalu
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
Baca Selengkapnya
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
[Fundamental bullish dan bearish sama-sama ada, SHFE zinc konsolidasi di level tinggi] Kontrak SHFE zinc 2611 yang paling aktif dibuka pada 26.705 yuan/mt. Setelah pembukaan, SHFE zinc berkonsolidasi di sekitar rata-rata harian, menyentuh level tertinggi 26.775 yuan/mt selama sesi berlangsung, namun kemudian terkoreksi pada sore hari. SHFE zinc turun ke level terendah 26.580 yuan/mt mendekati penutupan, dan akhirnya ditutup melemah pada 26.580 yuan/mt, turun 95 yuan/mt, atau 0,36%. Volume perdagangan meningkat menjadi 62.064 lot.....
4 jam yang lalu
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
5 jam yang lalu
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
Baca Selengkapnya
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
Pada 22 September, Western Mining mengumumkan bahwa anak perusahaannya yang sepenuhnya dimiliki, Qinghai Ganxin Mining Development Co., Ltd. (“Ganxin Mining”), baru-baru ini memperoleh Izin Usaha Pertambangan yang diterbitkan oleh Departemen Sumber Daya Alam Provinsi Qinghai. Tambang tersebut, bernama Tambang Polimetalik Besi Tuwenchahan Geermu milik Qinghai Ganxin Mining Development Co., Ltd., mencakup besi, tembaga, emas, molibdenum, seng, timbal, dan perak sebagai komoditas tambang yang diizinkan. Izin pertambangan ini berlaku mulai 3 Agustus 2026 hingga 30 Agustus 2043.
5 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (22 Sep)
5 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (22 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (22 Sep)
Data: Pergerakan pasar SHFE, DCE (22 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 22 Sep 2026.
5 jam yang lalu