Ministry of Industry and Information Technology: speed up the recovery and utilization of decommissioned power batteries and promote the construction of typical demonstration projects for echelon utilization in four regions.

SMM News: recently, the Ministry of Industry and Information Technology issued the "Synergetic Transformation and upgrading Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)," which pointed out that the recycling of decommissioned power batteries will be accelerated. Beijing, Tianjin, Hebei and its surrounding areas are the areas with the largest scale of promotion and application of new energy vehicles in China, giving full play to the advantages of backbone enterprises, scientific research institutions, industry platforms and third-party institutions, and strengthening regional complementarity. Unified 4 to promote the construction of regional recycling system. We will promote the construction of typical demonstration projects of echelon utilization in Shanxi, Shandong, Hebei, Henan and Inner Mongolia in the fields of energy storage and power backup of communication base stations. We will support the construction of power battery resource utilization projects and comprehensively improve the recycling and disposal capacity of decommissioned power batteries in the region. The details are as follows:

The competent departments of industry and informatization in Beijing, Tianjin, Hebei, Shanxi, Inner Mongolia Autonomous region, Shandong Province and Henan Province:

In order to implement the strategy of coordinated development of Beijing, Tianjin and Hebei, accelerate the coordinated transformation and upgrading of industries in the comprehensive utilization of industrial resources in Beijing, Tianjin, Hebei and its surrounding areas, improve the efficiency of regional resources utilization, cultivate new green momentum, and promote high-quality regional development, we have formulated the Beijing-Tianjin-Hebei and surrounding areas Industrial Synergetic Transformation and upgrading Plan (20-2022). It is now printed and distributed to you, please implement it conscientiously. Annex: industrial Synergetic Promotion Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)

Policy interpretation: interpretation of the Synergetic Transformation and upgrading Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)

Scan the code to apply to join the SMM industry communication group:

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Pengumuman Tender untuk Pengadaan Negosiasi Kokas Metalurgi Dry-Quenched Kelas Kuasi-Pertama Umum
30 menit yang lalu
Pengumuman Tender untuk Pengadaan Negosiasi Kokas Metalurgi Dry-Quenched Kelas Kuasi-Pertama Umum
Baca Selengkapnya
Pengumuman Tender untuk Pengadaan Negosiasi Kokas Metalurgi Dry-Quenched Kelas Kuasi-Pertama Umum
Pengumuman Tender untuk Pengadaan Negosiasi Kokas Metalurgi Dry-Quenched Kelas Kuasi-Pertama Umum
30 menit yang lalu
[SMM News] Restart Finniss Core Lithium Mencapai Tonggak Penting
1 jam yang lalu
[SMM News] Restart Finniss Core Lithium Mencapai Tonggak Penting
Baca Selengkapnya
[SMM News] Restart Finniss Core Lithium Mencapai Tonggak Penting
[SMM News] Restart Finniss Core Lithium Mencapai Tonggak Penting
Pada 8 September, Core Lithium mengumumkan bahwa Proyek Litium Finniss di Northern Territory, Australia, telah menghasilkan konsentrat spodumene pertamanya dari pabrik pemrosesan yang diaktifkan kembali. Tonggak ini dicapai sekitar enam bulan setelah perusahaan membuat keputusan investasi akhir (FID) untuk memulai kembali Finniss pada Maret 2026 dan sejalan dengan targetnya untuk kuartal September. Penambangan di tambang terbuka Grants dilanjutkan pada Mei, diikuti dengan dimulainya kembali operasi penghancuran pada Agustus, sementara pabrik pemrosesan saat ini sedang menjalani komisioning dan optimalisasi. Menurut Core Lithium, peningkatan pada pabrik pemrosesan diharapkan dapat meningkatkan liberasi mineral dan tingkat perolehan sekaligus meningkatkan kapasitas pemrosesan sekitar 20% menjadi 1,2 juta ton per tahun. Perusahaan terus menargetkan pengiriman pertama konsentrat spodumene yang baru diproduksi pada kuartal keempat 2026, sementara pengembangan tambang bawah tanah BP33 juga terus berjalan.
1 jam yang lalu
[EV: BYD menargetkan 20.000 stasiun pengisian daya kilat di Tiongkok pada akhir 2026, mengincar solusi energi AI]
1 jam yang lalu
[EV: BYD menargetkan 20.000 stasiun pengisian daya kilat di Tiongkok pada akhir 2026, mengincar solusi energi AI]
Baca Selengkapnya
[EV: BYD menargetkan 20.000 stasiun pengisian daya kilat di Tiongkok pada akhir 2026, mengincar solusi energi AI]
[EV: BYD menargetkan 20.000 stasiun pengisian daya kilat di Tiongkok pada akhir 2026, mengincar solusi energi AI]
BYD menyatakan pada 8 September bahwa infrastruktur AI membutuhkan pasokan listrik yang besar dan stabil, menjadikan PLTS, penyimpanan energi, dan pembangkit listrik sebagai bisnis utama, dan solusi energi AI akan menjadi salah satu prioritasnya pada fase berikutnya. Stasiun pengisian daya kilat BYD yang ke-10.000 selesai dibangun pada 28 Agustus, mencetak rekor di antara produsen mobil Tiongkok untuk jaringan pengisian daya mandiri terbesar, pembangunan 10.000 stasiun tercepat, dan cakupan terluas. BYD berencana membangun 20.000 stasiun pengisian daya kilat di Tiongkok pada akhir 2026 dan 6.000 di luar negeri, memperluas teknologi, produk, dan ekosistem pengisian daya kilatnya ke mancanegara.
1 jam yang lalu
Ministry of Industry and Information Technology: speed up the recovery and utilization of decommissioned power batteries and promote the construction of typical demonstration projects for echelon utilization in four regions. - Shanghai Metals Market (SMM)